Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2351 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Test report on the soldering of a Staybright radiator after a 90-hour endurance test.6th Jan 1930West Wittering \ U \ January1930-April1930  Scan015
Tests of a Solex Duplex carburetter on a Phantom II engine.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan016
Comparison of power curves for a Phantom II engine using various carburetter configurations.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan017
The performance of a Solex induction system and carburettor on a Phantom 1 car.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan018
Blueprint of an induction pipe for a Solex carburetter on an S.S. Phantom.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan019
Graph comparing performance results of Solex twin carburettor tests on a Phantom II engine.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan020
Blank document page with a purple ink stamp from the Derby print room.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan021
Tests on an extra cylinder lubrication oiling scheme, noting poor oil distribution under cold starting conditions.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan022
Further tests for piston skirt lubrication.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan023
The performance and suitability of Sleeveless Type R.O.2. magnetos for the 20 HP chassis.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan024
Tests conducted on water pump cavitation in radiators, both on the bench and in-car.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan025
Analysis of radiator and pump performance, focusing on cavitation and water flow dynamics.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan026
Engine cooling system performance, comparing Phantom I and II radiators and analyzing water circulation.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan027
Analysis of a radiator cooling phenomenon, including experimental reproduction of the fault and a comparison with Chrysler radiator designs.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan028
Radiator cavitation in a Phantom II, potential design alterations, and component delays.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan029
Comparative table of radiator specifications for various models, including a Chrysler.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan030
Graph plotting the relationship between boiling point in degrees Celsius and pressure depression in inches of mercury (Ins Hg).14th Jan 1930West Wittering \ U \ January1930-April1930  Scan031
Reverse of a photographic print with a Print Room date stamp.14th Jan 1930West Wittering \ U \ January1930-April1930  Scan032
Graph showing pump RPM versus pressure depression on the suction side for a Phantom II radiator.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan033
Graph comparing water circulation delivery of a 'V' Series radiator against an 'Original Phantom II' radiator at various pump speeds and temperatures.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan034
Dimensional drawing comparing a Chrysler Radiator with a 20 HP matrix.10th Jan 1923West Wittering \ U \ January1930-April1930  Scan035
Blueprint for a Radiator Test Rig with associated test notes.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan036
Performance analysis comparing the standard and cast aluminum expansion box silencer systems for the Phantom II.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan037
The results of testing an exhaust system, detailing issues with melting aluminum parts and plans for future road tests.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan038
Graph comparing brake horsepower against engine RPM for various exhaust system configurations.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan039
Blank page with a Print Room reception stamp.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan040
Graph showing power loss curves for a standard exhaust system on engine SS-15.9th Jan 1930West Wittering \ U \ January1930-April1930  Scan041
Graph comparing engine power output (Brake Horse Power vs. RPM) using different diameter exhaust manifold pipes.10th Jan 1930West Wittering \ U \ January1930-April1930  Scan042
Copy stamped by the Print Room in Derby.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan043
Blueprint showing the failure analysis of a cut-out ring.11th Jan 1930West Wittering \ U \ January1930-April1930  Scan044
Page with a purple ink 'Print Room' date stamp from Derby.14th Jan 1930West Wittering \ U \ January1930-April1930  Scan045
Tests on the Phantom II water cooling system to determine the effect of temperature and restriction.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan046
Analysis of cavitation effects on fluid flow in a system at over 2500 R.P.M.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan047
Graph showing the effect of temperature and restriction on the Phantom II cooling system's water flow and pump suction side depression.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan048
Graph showing pressure in the Phantom II cooling system against engine RPM under different nozzle and valve conditions.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan049
Graph plotting water flow against suction side depression for a Phantom II cooling system under various temperature and nozzle conditions.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan050
Graph showing the effect of temperature and a restricted delivery nozzle on water flow in a Phantom II cooling system.13th Jan 1930West Wittering \ U \ January1930-April1930  Scan051
Test bed results for Phantom II Invar pistons, discussing issues with clearances and cold knock.16th Jan 1930West Wittering \ U \ January1930-April1930  Scan052
Piston design flexibility, comparing standard aluminium, cast iron, and Invar pistons for the Silver Ghost.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan053
Utility of a voltmeter as a charge indicator for car dynamos.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan054
Page two of a document discussing the redesign of a switch unit and offering suggestions.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan055
Visit to Dunlop regarding testing and development of anti-skid properties for the Silent Tread tyre.17th Jan 1930West Wittering \ U \ January1930-April1930  Scan056
Tyre performance tests, comparing the Silent Tread, Palmer Cord, and Triple Stud tyres, including collaboration with Dunlop.22th Jan 1930West Wittering \ U \ January1930-April1930  Scan057
Dynamometer and road test comparison of a Solex twin choke carburetter against the standard carburetter on a Phantom II.22th Jan 1930West Wittering \ U \ January1930-April1930  Scan058
Carburettor performance, detailing metering at different throttle openings and suggesting potential refinements.22th Jan 1930West Wittering \ U \ January1930-April1930  Scan059
Performance graph comparing a Solex twin-choke carburettor against the standard RR carburettor on a Phantom II.22th Jan 1930West Wittering \ U \ January1930-April1930  Scan060
Stamped document from the Print Room.22th Jan 1970West Wittering \ U \ January1930-April1930  Scan061
Insufficient stiffness of the Phantom 11 centre lamp bracket after testing.22th Jan 1930West Wittering \ U \ January1930-April1930  Scan062
Analysis and comparison of Chrysler vehicle component weights.24th Jan 1930West Wittering \ U \ January1930-April1930  Scan063
Comparison of vehicle components and weight against a Chrysler model, detailing spring, axle, electrical, and body differences.24th Jan 1930West Wittering \ U \ January1930-April1930  Scan064
Weight comparison of components between a Chrysler and a 25 HP model.24th Jan 1930West Wittering \ U \ January1930-April1930  Scan065
Table listing the weights of various chassis components and a comparative note.24th Jan 1930West Wittering \ U \ January1930-April1930  Scan066
Table listing the weights of various chassis and engine components for different models.23th Jan 1930West Wittering \ U \ January1930-April1930  Scan067
Experiments with a venturi suction drain to remove petrol accumulation in supercharged engine volutes.23th Jan 1930West Wittering \ U \ January1930-April1930  Scan068
Engine fuel distribution in the induction manifold and proposed tests to correct richness.25th Jan 1930West Wittering \ U \ January1930-April1930  Scan069
Tests and optimal positioning for a venturi suction type volute drainer on a Phantom rig.25th Jan 1930West Wittering \ U \ January1930-April1930  Scan070
Tests on a venturi type suction volute drain for supercharged engines.28th Jan 1930West Wittering \ U \ January1930-April1930  Scan071
Engine tests concerning fuel accumulation in the volute, carburettor positioning, and venturi efficiency.25th Jan 1930West Wittering \ U \ January1930-April1930  Scan072
Engine testing relating to fuel collection in the volute and fuel distribution in the induction system.25th Jan 1930West Wittering \ U \ January1930-April1930  Scan073
Recommendations for improving the fuel induction system with a new venturi design and modifications to supercharger casings.27th Jan 1930West Wittering \ U \ January1930-April1930  Scan074
Graph illustrating the maximum fuel-handling capacity of a volute draining scheme against induction depression.27th Jan 1930West Wittering \ U \ January1930-April1930  Scan075
Stamped by the Print Room in Derby.28th Jan 1930West Wittering \ U \ January1930-April1930  Scan076
Sketch showing the shape of a venturi for an F s/c volute draining scheme.27th Jan 1930West Wittering \ U \ January1930-April1930  Scan077
Blueprint diagram of a suggested experimental Volute Suction Drain.28th Jan 1930West Wittering \ U \ January1930-April1930  Scan078
Blank document with a 'Print Room' date stamp.28th Jan 1930West Wittering \ U \ January1930-April1930  Scan079
Tests on silencers and recommending a new exhaust heated jacket induction system for the Phantom II.30th Jan 1930West Wittering \ U \ January1930-April1930  Scan080
Pitching issue with Phantom I springs and the testing of new front springs.3rd Feb 1930West Wittering \ U \ January1930-April1930  Scan081
Test results and recommendations for the optimal method of extra cylinder lubrication.5th Feb 1930West Wittering \ U \ January1930-April1930  Scan082
Clutch slipping issues on the 25 HP high-compression car due to increased torque, requiring urgent spring modifications.6th Feb 1930West Wittering \ U \ January1930-April1930  Scan083
Ignition timing control comparison for a high compression 25 HP car engine versus the standard model.2nd Aug 1930West Wittering \ U \ January1930-April1930  Scan084
Magneto ignition timing, range of advance, and detonation issues.6th Feb 1930West Wittering \ U \ January1930-April1930  Scan085
Comparative tests of rear axle gear ratios for 25 HP high-compression cars.2nd Jul 1930West Wittering \ U \ January1930-April1930  Scan086
Comparison of 12/50 and 11/50 axle ratios through hill climb and general road performance tests.1st Feb 1930West Wittering \ U \ January1930-April1930  Scan087
Comparison of car performance with rubber engine mountings and a specific ratio, noting it is smoother and less noisy than a standard 25 HP car.7th Jan 1930West Wittering \ U \ January1930-April1930  Scan088
Issues with the Phantom II radiator filler cap seal and recommending material and design changes.7th Feb 1930West Wittering \ U \ January1930-April1930  Scan089
Blueprint for a Radiator Filler Cap Modification for the Phantom II.7th Feb 1930West Wittering \ U \ January1930-April1930  Scan090
Blank document with a 'Print Room' date stamp.7th Feb 1930West Wittering \ U \ January1930-April1930  Scan091
Increasing dynamo output for Phantom and 20 HP models through armature winding modifications.1st Feb 1930West Wittering \ U \ January1930-April1930  Scan092
The manufacturing advantages and standardisation of 48 coil armatures versus 56 coil armatures.1st Feb 1930West Wittering \ U \ January1930-April1930  Scan093
The provision and trial of higher output dynamos for various car models and chassis.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan094
The methods used to observe and record 'Frame Jellying', supplementing road tests with stationary experiments.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan095
Analysis of 'frame jellying' and 'high speed wobble', detailing oscillation frequency, amplitude, and cause.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan096
Analysis of chassis frame twisting, engine movement, and the effect on vehicle vibrations known as 'jellying' and 'wobbles'.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan097
Report page discussing chassis 'jellying', the effect of shock damper loading, and experiments to alter frame periodicity.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan098
Report page detailing experiments on body attachments, frame damping, and sub-frame mounting configurations.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan099
List of ten unsuccessful experiments conducted to improve front axle assembly and steering to reduce 'jellying'.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan100
Summary of findings on vehicle damping, chassis flex ('jellying'), and ride quality issues related to spare wheel placement.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan101
Note regarding fitting spare wheels and using extra damping.19th Feb 1930West Wittering \ U \ January1930-April1930  Scan102
Diagram illustrating a test rig and recording apparatus for radiator movement.20th Feb 1930West Wittering \ U \ January1930-April1930  Scan103
Blank page with a 'Print Room' stamp.20th Feb 1930West Wittering \ U \ January1930-April1930  Scan104
Test report on a Compression Ignition Unit, detailing performance, fuel consumption, and exhaust observations.28th Feb 1930West Wittering \ U \ January1930-April1930  Scan105
Engine tests involving heating elements, blower performance, new fuel nozzles, and an oil scavenging issue.28th Feb 1930West Wittering \ U \ January1930-April1930  Scan106
Official acceptance test report for a compression ignition unit.28th Feb 1930West Wittering \ U \ January1930-April1930  Scan107
Stamped document from the Print Room in Derby.28th Feb 1930West Wittering \ U \ January1930-April1930  Scan108
Starting difficulties of a single-cylinder compression ignition unit and proposed modifications.24th Feb 1930West Wittering \ U \ January1930-April1930  Scan109
Requesting details for fitting friction shock absorbers onto an experimental S.S. car for testing.8th Mar 1930West Wittering \ U \ January1930-April1930  Scan110
Deflection test results for an engine foot mounted shock damper.10th Mar 1930West Wittering \ U \ January1930-April1930  Scan111
Recommendation to shorten a cross shaft when redesigning the damper as part of the crankcase.27th Feb 1930West Wittering \ U \ January1930-April1930  Scan112
Cross-section diagram of the front shock damper for a Phantom II.27th Feb 1930West Wittering \ U \ January1930-April1930  Scan113
Results of tests to fix frame and radiator 'jellying'.12th Mar 1930West Wittering \ U \ January1930-April1930  Scan114


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙