Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1369 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Letter from Sanderson & Holmes Ltd. discussing charges for coachbuilding work undertaken for the Experimental Department.25th Apr 1938Box 109 \ 5  scan0041
Letter from Sanderson & Holmes Ltd. discussing competitive pricing and proposing a new charging structure for future orders.25th Apr 1938Box 109 \ 5  scan0042
List of body mounting and alteration tasks performed on chassis WXA.1.31th Mar 1938Box 109 \ 5  scan0043
List of bodywork and interior fitting tasks performed on a vehicle, page 2.31th Mar 1938Box 109 \ 5  scan0044
List of painting and assembly work tasks for a vehicle, including the final cost.26th Apr 1938Box 109 \ 5  scan0045
Spark plug testing and misfiring issues on chassis WXA-1.26th Apr 1938Box 109 \ 5  scan0046
Letter to Sanderson & Holmes, Ltd. thanking them for their efforts, a credit of £6/4/8, and expressing hope for future work on experimental bodies.26th Apr 1938Box 109 \ 5  scan0047
Short typed memo regarding WXA-1 spark plugs and arranging a car trial.27th Apr 1938Box 109 \ 5  scan0048
Arranging a visit to London to investigate and reproduce engine misfires on a customer's car.28th Apr 1938Box 109 \ 5  scan0049
Note arranging for an experimental department representative to try a car.28th Apr 1938Box 109 \ 5  scan0050
Sending a mechanic to London to examine misfires on a car.29th Apr 1938Box 109 \ 5  scan0051
Arranging for a person to be met at the train station with a car.2nd May 1938Box 109 \ 5  scan0052
Follow-up memo clarifying a chassis number from a previous communication.4th May 1938Box 109 \ 5  scan0053
Diagnosing and resolving engine misfires on a specific car, likely belonging to 'Sg'.6th May 1938Box 109 \ 5  scan0054
The removal of a faulty spark plug and coil for examination.6th May 1938Box 109 \ 5  scan0055
Car performance issues including starting, spark plugs, and fuel consumption.21th Apr 1938Box 109 \ 5  scan0056
The arrival of a car for modifications to bring it to production standard.24th May 1938Box 109 \ 5  scan0057
Planned modifications for vehicle WXA-1, including an over-oiling cylinder and steering pivots.26th May 1938Box 109 \ 5  scan0058
List of modifications and parts to be prepared for a Wraith WXA.1 car.26th May 1938Box 109 \ 5  scan0059
Work instructions for a Wraith WXA.1 vehicle.14th Jun 1938Box 109 \ 5  scan0060
Urgent memo requesting the fitting of an anti-splash vent pipe and a washer to Sg's car.15th Jun 1938Box 109 \ 5  scan0061
Requesting a demonstration that a petrol leak from a car's filler cap on corners has been resolved.20th Jun 1938Box 109 \ 5  scan0062
Request to arrange collection of a car from Derby and for a list of completed work items.21th Jun 1938Box 109 \ 5  scan0063
Cover note for an attached list of work carried out on a car whilst at Derby.21th Jun 1938Box 109 \ 5  scan0064
Summary of details and modifications fitted to car WXA.1 following a test.21th Jun 1938Box 109 \ 5  scan0065
Covering memo regarding 'Sg's Car - WXA-1', attaching another memo with updated information on points previously raised.27th Jun 1938Box 109 \ 5  scan0066
Criticisms and detailing modifications made to car WXA.1.27th Jun 1938Box 109 \ 5  scan0067
Report about an engine flooding and having trouble starting when the car is parked pointing uphill.8th Jul 1938Box 109 \ 5  scan0068
Down-draught Stromberg carburetter flooding issue when a car is on a gradient.8th Jul 1938Box 109 \ 5  scan0069
Comparison of carburetter flooding on a gradient between the Wraith and 25/30 models.16th Jul 1938Box 109 \ 5  scan0070
Issue of carburetter flooding on the Wraith model when on a gradient.16th Jul 1938Box 109 \ 5  scan0071
Premature wear and life expectancy of tyres on various car models.28th Jul 1938Box 109 \ 5  scan0072
Tyre life and performance on various car models, referencing specific mileage figures and Dunlop load capacity tables.5th Aug 1938Box 109 \ 5  scan0073
Report discussing tyre wear, mileage, and potential modifications to tyre size, axle, and gear ratios for the Wraith model.5th Aug 1938Box 109 \ 5  scan0074
Analysis of a failed exhaust pipe, detailing the cause of failure, wall thickness measurements, and hardness tests.17th Aug 1938Box 109 \ 5  scan0075
Laboratory report showing a micrograph of oxide penetration on a mild steel exhaust pipe.17th Aug 1938Box 109 \ 5  scan0076
Instruction memo to modify the radiators on two Wraith cars to bring them in line with B series production.18th Aug 1938Box 109 \ 5  scan0077
Typed memo confirming a car service appointment following a telephone call.21th Sep 1938Box 109 \ 5  scan0078
Arranging for a car and driver to be sent for a two-day loan.22th Sep 1938Box 109 \ 5  scan0079
List of repairs and upgrades for a customer's car.23th Sep 1938Box 109 \ 5  scan0080
List of modifications carried out on a Wraith and a report on a timing gear rattle.30th Sep 1938Box 109 \ 5  scan0081
Modifications, a new Bakelite filler cap, and a timing gear rattle issue.30th Sep 1938Box 109 \ 5  scan0082
Modifications to a camshaft, bearing housing, and wheel case.5th Oct 1938Box 109 \ 5  scan0083
Summary of modifications required for job WXA-1, concerning the camwheel, camshaft and gears.5th Oct 1938Box 109 \ 5  scan0084
The availability of parts and the timeline for fitting a new cam wheel.5th Oct 1938Box 109 \ 5  scan0085
Modifications for a Wraith (WXA.1) to fix timing gear rattles.5th Oct 1938Box 109 \ 5  scan0086
The delay of car WXA-1's return to Derby due to its use in trials for the Paris Show.5th Oct 1938Box 109 \ 5  scan0087
The arrangement for a car to be brought to Derby.19th Oct 1938Box 109 \ 5  scan0088
From Sg to Rm regarding the postponement of sending a car to Derby for a week.24th Oct 1938Box 109 \ 5  scan0089
The postponed visit of car WXA-1 to Derby.28th Oct 1938Box 109 \ 5  scan0090
Requesting the preparation of various parts for a WXA.4 Sg's Wraith, including a new exhaust system.1st Nov 1938Box 109 \ 5  scan0091
Typed letter concerning the investigation and rectification of a 'thump' in a customer's car at 20 m.p.h.4th Nov 1938Box 109 \ 5  scan0092
Car's unavailability for a trial run due to a timing gear modification and engine removal.5th Nov 1938Box 109 \ 5  scan0093
Delayed return of a car to London pending the arrival of new timing gears.7th Nov 1938Box 109 \ 5  scan0094
'Sg' to 'BY' concerning the return of trial car WXA-1 due to a recurring mechanical issue with its non-standard engine mounting.8th Nov 1938Box 109 \ 5  scan0095
Delay in car repairs due to the need to refit noisy timing gears.10th Nov 1938Box 109 \ 5  scan0096
Requesting the fitting of a standardized water pump from an 8.B.V. car to Sg's car.10th Nov 1938Box 109 \ 5  scan0097
Letter detailing repair delays, issues with engine mounting, timing gears, and an exhaust system thump on a car.11th Nov 1938Box 109 \ 5  scan0098
Delay in providing a Wraith for trials due to a shortage.15th Nov 1938Box 109 \ 5  scan0099
To Mr. Dodd concerning a missing set of luggage straps for Chassis No. WXA 1.18th Nov 1938Box 109 \ 5  scan0100
Dispatch and return of a pair of luggage straps for Chassis WXA.1.21th Nov 1938Box 109 \ 5  scan0101
Confirming a list of work carried out on a car is being provided.21th Nov 1938Box 109 \ 5  scan0102
List of modifications carried out on car WXA.1, a Sg's Wraith.21th Nov 1939Box 109 \ 5  scan0103
Options for a combined car heater and defroster for a new Wraith chassis, recommending the Smith's 'HaDees' unit.29th Dec 1938Box 109 \ 5  scan0104
Design and implementation of a windscreen defroster system.29th Dec 1938Box 109 \ 5  scan0105
Installation of a 'Hadees' heater and 'Philco' radio set in a New Wraith III.12th Jan 1939Box 109 \ 5  scan0106
Letter to Park Ward & Co. Ltd. regarding the body construction and heater/defroster installation for Mr. Sidgreaves' new Wraith III.12th Jan 1939Box 109 \ 5  scan0107
The second page of a letter from the Chief Engineer of Chassis requesting an urgent elevation of the screen rail with Lucas wiper components.13th Jan 1939Box 109 \ 5  scan0108
Fitting of a de-froster, heater, and radio to car WMB-11.13th Jan 1939Box 109 \ 5  scan0109
The arrangement of a 'Hadees' heater for Sg's Car (WMB.11) and noting remarks about the rear heater and radio.16th Jan 1939Box 109 \ 5  scan0110
Improving the performance of a Wraith and incorporating experiments to reduce cylinder bore wear.15th Feb 1939Box 109 \ 5  scan0111
Wraith's improved performance, arranging an engine change and transport of the car to Derby.15th Feb 1939Box 109 \ 5  scan0112
Supply and experimental fitting of heater and defroster parts for a Wraith car, model WXA-1.16th Feb 1939Box 109 \ 5  scan0113
Correction notice for Instruction Sheet Y.8554, clarifying the required Heater and Defroster parts for a new car.17th Feb 1939Box 109 \ 5  scan0114
Request for parts and instructions to upgrade an engine for improved performance.20th Feb 1939Box 109 \ 5  scan0115
Parts required for fitting to a Wraith III chassis, including a specific camshaft, pistons, and new cylinder block.23th Feb 1939Box 109 \ 5  scan0116
Letter to Messrs. Park Ward & Co. Ltd. regarding blueprints for a car heater and defroster for a specific chassis.25th Feb 1939Box 109 \ 5  scan0117
Performance figures for 'g's. Wraith car, including acceleration times and maximum speed.28th Feb 1939Box 109 \ 5  scan0118
The delayed handover of a car due to ongoing testing after modifications.9th Mar 1939Box 109 \ 5  scan0119
Engine and gearbox modifications and subsequent performance testing for a vehicle.10th Mar 1939Box 109 \ 5  scan0120
Engine roughness and performance compared to the standard Wraith model.10th Mar 1939Box 109 \ 5  scan0121
Cylinder report detailing size measurements for six engine bores at three different points.1st Mar 1939Box 109 \ 5  scan0122
Comparative power test between two cars, noting weight and performance times.9th Mar 1939Box 109 \ 5  scan0123
Performance graph comparing a modified SG's engine against the average performance of Bentley and Wraith engines.3rd Mar 1939Box 109 \ 5  scan0124
Performance figures of a modified Wraith after fitting new pistons and a cylinder block.11th Mar 1939Box 109 \ 5  scan0125
Performance comparison data for a Wraith before and after modifications to the camshaft and pistons.11th Mar 1939Box 109 \ 5  scan0126
Graph comparing the horsepower versus RPM of an 'Sg's Engine' with new components against average Bentley and Wraith engines.3rd Mar 1939Box 109 \ 5  scan0127
Performance graph comparing an Sg's engine test against average Bentley and Wraith engine curves.3rd Mar 1939Box 109 \ 5  scan0128
Telegram advising that Robotham will be sending Kennett to Sidgreaves tomorrow.13th Mar 1939Box 109 \ 5  scan0129
Query and response regarding fitting earthing clips to the brake drums of chassis WXA-1 to resolve wireless interference.14th Mar 1939Box 109 \ 5  scan0130
Engine pinking issues after modifications, requesting an investigation and a report.13th Apr 1939Box 109 \ 5  scan0131
Engine pinking issues, referencing an experimental car and a Bentley for comparison.14th Apr 1939Box 109 \ 5  scan0132
Investigating an engine detonation (pinking) issue on car WXA.1, concluding poor quality petrol was the cause.17th Apr 1939Box 109 \ 5  scan0133
Movement of a customer's new and old cars to London.20th Apr 1939Box 109 \ 5  scan0134
Requesting a report regarding an investigation into the question of pinking.14th Apr 1939Box 109 \ 5  scan0135
Engine detonation tests in response to a complaint, particularly in hot weather conditions.24th Apr 1939Box 109 \ 5  scan0136
Instructions for fitting special cylinder blocks and associated modifications for WXA.1 and WXA.2 cars.12th May 1939Box 109 \ 5  scan0137
From 'Sg.' to 'Rm.' concerning worsening engine detonation in car WMB11 and a proposal for its repair.11th Jul 1939Box 109 \ 5  scan0138
Cause of engine detonation and suggesting a diagnostic experiment.11th Jul 1939Box 109 \ 5  scan0139
Confirming a 'Discol' fuel experiment eliminated detonation noise and arranging for a car to be sent to Derby.11th Jul 1939Box 109 \ 5  scan0140


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙