| Description | Date | Identifier | |
| Inviting personnel to a luncheon for a visitor's works visit. | 3rd Jun 1939 | Box 161a \ 3 scan0186 | |
| Cover sheet for the agenda of the Chassis Conference. | 3rd Jun 1939 | Box 161a \ 3 scan0187 | |
| Chassis conference agenda discussing different remote control gearbox and overdrive options for the Phantom III. | 6th Jun 1939 | Box 161a \ 3 scan0188 | |
| Phantom III hydraulic transmission and steering gear issues, including rocker shaft and bearing failures. | 3rd Jun 1939 | Box 161a \ 3 scan0189 | |
| Modifications, engine vibrations, and steering gear issues for the Wraith model. | 3rd Jun 1939 | Box 161a \ 3 scan0190 | |
| The Wraith model's steering, cost, and performance, including criticisms of acceleration and potential engine modifications. | 3rd Jun 1939 | Box 161a \ 3 scan0191 | |
| Progress report on the Wraith model, discussing performance, cracked valve seats, a specific coupe, and the gearbox. | 3rd Jun 1939 | Box 161a \ 3 scan0192 | |
| Steering wheel for the Bentley V and hand brake ratchet protection. | 3rd Jun 1939 | Box 161a \ 3 scan0193 | |
| Production schedules, performance queries, and modifications for a Drop Head Coupe. | 3rd Jun 1939 | Box 161a \ 3 scan0194 | |
| The status of bodywork programmes for the Bentley Corniche, Silver Dawn, and Silver Ripple models. | 3rd Jun 1939 | Box 161a \ 3 scan0195 | |
| The development of interior heating and ventilation, including the cost and competitor offerings. | 3rd Jun 1939 | Box 161a \ 3 scan0196 | |
| Decisions taken at a Chassis Conference regarding the Phantom III. | 6th Jun 1939 | Box 161a \ 3 scan0197 | |
| Steering gear failures and modifications for Phantom III and Wraith models. | 7th Jun 1939 | Box 161a \ 3 scan0198 | |
| Report page discussing cost reductions, performance, and engineering issues concerning valve seats, gearbox, and steering wheel for the B.V. model. | 7th Jun 1939 | Box 161a \ 3 scan0199 | |
| Meeting notes discussing steering wheel cost, performance, Drop Head Coupe bodies, and the Bentley 'Corniche'. | 7th Jun 1939 | Box 161a \ 3 scan0200 | |
| Meeting memorandum discussing the standardization of interior heating and a rationalized production programme for Wraith and Phantom III chassis. | 7th Jun 1939 | Box 161a \ 3 scan0201 | |
| Arrangements for the upcoming Monday's conference due to a colleague's hospital visit. | 10th Jun 1939 | Box 161a \ 3 scan0202 | |
| Minutes from a chassis conference detailing completion schedules and parts shortages for various car models. | 6th Jun 1939 | Box 161a \ 3 scan0203 | |
| Status update on various chassis and components for car production and testing. | 12th Jun 1939 | Box 161a \ 3 scan0204 | |
| Test report detailing modifications, development status, and requirements for various cars on test. | 12th Jun 1939 | Box 161a \ 3 scan0205 | |
| Status report on various vehicle and engine units, including planned modifications for upcoming trials. | 12th Jun 1939 | Box 161a \ 3 scan0206 | |
| Specifications for new engine units B.80 No.5, No.6, and No.7, detailing required components. | 12th Jun 1939 | Box 161a \ 3 scan0207 | |
| Specification sheet detailing parts and status for B.80, Conventional 8, and B.60 cast iron engine units. | 12th Jun 1939 | Box 161a \ 3 scan0208 | |
| Specification sheet detailing component changes for B.60 and Bentley V units. | 12th Jun 1939 | Box 161a \ 3 scan0209 | |
| List of specifications and statuses for various B.V. and Wraith III engine units. | 12th Jun 1939 | Box 161a \ 3 scan0210 | |
| Progress report on the testing, fitting, and development of various engine units. | 12th Jun 1939 | Box 161a \ 3 scan0211 | |
| Progress report detailing component production, modifications, and completion promises for various units. | 12th Jun 1939 | Box 161a \ 3 scan0212 | |
| Progress report on parts including Phantom III steering, induction pipes, and special wheel nuts. | 12th Jun 1939 | Box 161a \ 3 scan0213 | |
| Minutes from a Chassis Conference discussing issues with the Bentley V, Corniche model, and various components. | 14th Aug 1939 | Box 161a \ 3 scan0214 | |
| Starter motor costs and revised production schedules for Phantom III, Bentley V, and Wraith models. | 16th Jun 1939 | Box 161a \ 3 scan0215 | |
| Meeting minutes from a chassis conference held on 13.6.39. | 19th Jun 1939 | Box 161a \ 3 scan0216 | |
| Progress report on chassis and parts for Silver Ripple, Silver Wraith, Silver Dawn, and Bentley models. | 19th Jun 1939 | Box 161a \ 3 scan0217 | |
| Status report on various test cars, detailing components fitted, current status, and required modifications. | 19th Jun 1939 | Box 161a \ 3 scan0218 | |
| Status report on vehicle and engine units undergoing testing and development. | 19th Jun 1939 | Box 161a \ 3 scan0219 | |
| Progress report on various engine units (B.80 series), detailing specifications, parts, and trial status. | 19th Jun 1939 | Box 161a \ 3 scan0220 | |
| Specification list and update on various engine units and their components. | 19th Jun 1939 | Box 161a \ 3 scan0221 | |
| Status update and parts list for various B.60 engine units under development. | 19th Jun 1939 | Box 161a \ 3 scan0222 | |
| Log of Bentley V units, their chassis fitment, and remarks on a standard conversion specification. | 19th Jun 1939 | Box 161a \ 3 scan0223 | |
| Status report on Wraith III and Wraith Ripple engine units, detailing testing, modifications, and component parts. | 19th Jun 1939 | Box 161a \ 3 scan0224 | |
| Progress memo detailing the status of various automotive components like 4-cylinder units, gearboxes, and induction pipes. | 19th Jun 1939 | Box 161a \ 3 scan0225 | |
| The B.V. Induction System, detailing the urgent requirement for a new inlet pipe and instructions for Continental sets of parts. | 19th Jun 1939 | Box 161a \ 3 scan0226 | |
| Test log with component specifications and requirements for a Bentley 50 Chassis. | 3rd Feb 1950 | Box 161a \ 3 scan0227 | |
| Minutes of a works conference on chassis, detailing cost analysis for front suspension and frames. | 21th Jun 1939 | Box 161a \ 3 scan0228 | |
| Material cost for Bentley V. Brakes and planning for future sections like the Rear Axle and Starter Motor. | 21th Jun 1939 | Box 161a \ 3 scan0229 | |
| Meeting notes discussing chassis costs for the Bentley V and modifications for the B.V. crank. | 26th Jun 1939 | Box 161a \ 3 scan0230 | |
| Progress report discussing B.V. material delays and B.V. gear box complaints. | 26th Jun 1939 | Box 161a \ 3 scan0231 | |
| Minutes from a Chassis Conference meeting discussing personnel and model updates. | 20th Jun 1939 | Box 161a \ 3 scan0232 | |
| Specifications for new Silver Dawn chassis and status updates on various Bentley models on test. | 26th Jun 1939 | Box 161a \ 3 scan0233 | |
| Status report on various Bentley and Wraith test cars, detailing specifications, test progress, and parts. | 26th Jun 1939 | Box 161a \ 3 scan0234 | |
| Requirements for trials in France for a Silver Wraith and on-test status for Bentley 50 Chassis and 80 Engine units. | 26th Jun 1939 | Box 161a \ 3 scan0235 | |
| Status report on Bentley 80 Units, covering development testing, modifications, and specifications for new builds. | 26th Jun 1939 | Box 161a \ 3 scan0236 | |
| List of parts and specifications for various engine units with remarks on their development status. | 26th Jun 1939 | Box 161a \ 3 scan0237 | |
| Status update and specification list for B.80 and Bentley V engine units. | 26th Jun 1939 | Box 161a \ 3 scan0238 | |
| Status report on Bentley V and Wraith III engine units, detailing their components, tests, and chassis fittings. | 26th Jun 1939 | Box 161a \ 3 scan0239 | |
| Status update on Wraith Ripple Units, 4 Cylinder Units, and Helical Gear Boxes. | 26th Jun 1939 | Box 161a \ 3 scan0240 | |
| Progress report on the production and requirements for various vehicle components, including steering, induction pipes, and pulleys. | 26th Jun 1939 | Box 161a \ 3 scan0241 | |
| List of required actions for revised pulleys, a gearbox, camshafts, and a Wraith spring drive. | 26th Jun 1939 | Box 161a \ 3 scan0242 | |
| Design status report listing modifications and their completion status for Bentley and 25-30 HP chassis. | 21th Jan 1936 | Box 161a \ 4 scan0001 | |
| Design position report detailing modifications and their completion status for 25-30 HP and Phantom III chassis. | 15th Jan 1936 | Box 161a \ 4 scan0002 | |
| Design position report for the Phantom III chassis, detailing the status of various items. | 22th Jan 1936 | Box 161a \ 4 scan0003 | |
| List of modifications and their completion status for the Phantom III chassis. | 21th Jan 1936 | Box 161a \ 4 scan0004 | |
| Design position report for Phantom III and Wraith II chassis components. | 21th Jan 1936 | Box 161a \ 4 scan0005 | |
| List of design items and their current status for the Wraith II chassis. | 21th Jan 1936 | Box 161a \ 4 scan0006 | |
| Design position report sheet for single cylinder and general research projects. | 21th Jan 1936 | Box 161a \ 4 scan0007 | |
| Design position report detailing the status of research and modifications for Merlin, Kestrel, and Bentley engines. | 21th Jan 1936 | Box 161a \ 4 scan0008 | |
| List of modifications and their completion dates for the Merlin 'F' Engine, sheet 9. | 21th Jan 1936 | Box 161a \ 4 scan0009 | |
| Status report on current modifications and future developments for the Merlin 'E' engine. | 21th Jan 1936 | Box 161a \ 4 scan0010 | |
| Design position status sheet for Goshawk and Vulture engines. | 21th Jan 1936 | Box 161a \ 4 scan0011 | |
| Attaching a report on the progress of design. | 13th Feb 1936 | Box 161a \ 4 scan0012 | |
| Design position report detailing the status of modifications for Bentley and 25/30 HP chassis. | 7th Feb 1936 | Box 161a \ 4 scan0013 | |
| List of design modifications and their completion status for the 25-30 HP and Phantom III chassis. | 11th Feb 1936 | Box 161a \ 4 scan0014 | |
| Design position report detailing the status of various components for the Phantom III chassis. | 11th Feb 1936 | Box 161a \ 4 scan0015 | |
| List of design modifications and their completion status for the Phantom III chassis. | 11th Feb 1936 | Box 161a \ 4 scan0016 | |
| Design position report listing the status of items for the Phantom III and Wraith II chassis. | 28th Jan 1936 | Box 161a \ 4 scan0017 | |
| Design status list for the Wraith II Chassis, marked as sheet 6. | 28th Jan 1936 | Box 161a \ 4 scan0018 | |
| Status report on single cylinder and general engine research projects. | 28th Jan 1936 | Box 161a \ 4 scan0019 | |
| Design position status report listing modifications and their completion dates for the Kestrel and Merlin 'E' engines. | 13th Feb 1936 | Box 161a \ 4 scan0020 | |
| Status report on modifications and future developments for the Merlin 'E' engine, sheet 9. | 13th Feb 1936 | Box 161a \ 4 scan0021 | |
| Design position report on future development for Merlin, Goshawk, and Vulture engines. | 28th Feb 1936 | Box 161a \ 4 scan0022 | |
| Cover note for a report detailing the progress of design work over the last fortnight. | 28th Feb 1936 | Box 161a \ 4 scan0023 | |
| Status report on design modifications for Bentley and 25-30 HP chassis. | 25th Feb 1936 | Box 161a \ 4 scan0024 | |
| Design position report listing tasks and their status for the 25-30 and Phantom III chassis. | 21th Feb 1936 | Box 161a \ 4 scan0025 | |
| List of design position items and their completion status for the Phantom III chassis. | 27th Feb 1936 | Box 161a \ 4 scan0026 | |
| Design position report detailing modifications for the Phantom III and Wraith II chassis. | 27th Feb 1936 | Box 161a \ 4 scan0027 | |
| Design position report detailing the status of various components for the Wraith TT Chassis. | 27th Feb 1936 | Box 161a \ 4 scan0028 | |
| Progress report on single cylinder and general research projects. | 27th Feb 1936 | Box 161a \ 4 scan0029 | |
| Progress report on design modifications and their status for the Kestrel and Merlin 'E' engines. | 27th Feb 1936 | Box 161a \ 4 scan0030 | |
| Design position report detailing modifications and future development for Merlin and Goshawk engines. | 27th Feb 1936 | Box 161a \ 4 scan0031 | |
| Design status report for various components of the Vulture engine. | 27th Feb 1936 | Box 161a \ 4 scan0032 | |
| Fortnightly report on the progress of design work. | 16th Mar 1936 | Box 161a \ 4 scan0033 | |
| Design position report detailing the status of items for Bentley, 25/30 HP, and Phantom III chassis. | 11th Mar 1936 | Box 161a \ 4 scan0034 | |
| Design position list detailing modifications and their status for the Phantom III chassis. | 11th Mar 1936 | Box 161a \ 4 scan0035 | |
| Design position status report listing modifications and components for the Phantom III and Wraith II chassis. | 11th Mar 1936 | Box 161a \ 4 scan0036 | |
| Design position report for the Wraith II model, listing various components and their status. | 11th Mar 1936 | Box 161a \ 4 scan0037 | |
| Status report on various single-cylinder and general research engine projects. | 9th Mar 1936 | Box 161a \ 4 scan0038 | |
| Design position report detailing the status of modifications for Kestrel and Merlin 'E' engines. | 9th Mar 1936 | Box 161a \ 4 scan0039 | |
| Status report on modifications and future developments for the Merlin 'E' engine. | 13th Mar 1936 | Box 161a \ 4 scan0040 | |
| Design position status report on components for the Goshawk 'D' and Vulture engines. | 18th Mar 1936 | Box 161a \ 4 scan0041 | |
| Chassis design work amongst the Design Office staff. | 18th Mar 1936 | Box 161a \ 4 scan0042 | |
| Chart assigning design items to section leaders and experimental department specialists. | 30th Mar 1936 | Box 161a \ 4 scan0043 | |
| | | | |