| Description | Date | Identifier | |
| Page discussing crankshaft stiffness, inertia, and the free period of vibration. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 39 | |
| Technical comparison of crankshaft inertia and stiffness between a 20 HP engine, a Lorraine-Dietrich engine, and a Goshawk engine. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 40 | |
| Technical comparison of crankshaft inertia and stiffness, referencing the 20 HP, Lorraine, and Phantom engines. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 41 | |
| Analysis of engine crankshaft stiffness, inertia, 'master period' vibration, and a summary of damper types. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 42 | |
| Engine damper application, crankshaft stiffness, and inertia management for high-speed engines. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 43 | |
| Damper types, crankshaft stiffness, and vibration analysis for a 20 HP engine. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 44 | |
| Explanation of harmonic vibrations and their effect on a six-cylinder in-line engine crankshaft. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 45 | |
| Calculation of crankshaft frequency, harmonics, and resulting vibration speeds. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 46 | |
| Calculation of the natural frequency and synchronous speed of a Lorraine Dietrich crankshaft. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 47 | |
| Diagram showing the amplitude of torsional vibrations due to harmonics of gas pressure torque at full throttle for a Standard 20 engine without a damper. | 10th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 48 | |
| Largely blank document with a purple date stamp in the bottom right corner. | 22th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 49 | |
| Battery ignition systems, specifically regarding the performance of different contact breaker lever springs. | 25th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 50 | |
| The performance and wear of platinum and tungsten ignition points during a 10,000-mile test. | 25th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 51 | |
| The unsatisfactory performance of stronger springs on the battery ignition contact breaker lever during a bench test. | 25th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 52 | |
| Latest developments and increased connection points for a central lubrication system. | 25th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 53 | |
| Copy of a letter regarding the Bijur Lubrication system and several improvements. | 14th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 54 | |
| Page discussing improvements and alternatives for a chassis lubrication system, including flow rate data. | 14th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 55 | |
| Lubrication systems for front ball joints, sphere, torque tube, and road springs, referencing the Bijur system. | 14th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 56 | |
| Report page discussing the performance of the Bijur lubrication system and a new design for the front shock absorber. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 57 | |
| Summary of experimental work and design proposals for chassis improvements on the 40/50 HP model. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 58 | |
| Report page discussing potential improvements for brakes, steering, and the petrol supply system. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 59 | |
| Potential improvements to chassis lubrication, springs, height, and weight reduction. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 60 | |
| The issues and potential improvements for the 20 HP car model. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 61 | |
| Experiment to reduce dynamo noise by modifying the armature from 29 to 28 slots. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 62 | |
| Production of three experimental armatures for 40/50 HP machines. | 26th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 63 | |
| Rectifying unit for high voltage D.C. insulation testing. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 64 | |
| Page 2 of a document describing the operation of a high voltage insulation testing unit using a valve, trembler coil, and condensers. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 65 | |
| Page detailing the use and functionality of an apparatus for testing high-tension insulation resistance. | 12th Sep 1926 | West Wittering \ Q \ 2April1927-June1927 66 | |
| The development of apparatus for insulation tests on redmanol coil cases. | 12th Sep 1926 | West Wittering \ Q \ 2April1927-June1927 67 | |
| Circuit diagram for a High Tension Rectifying Unit for High Tension Direct Current insulation tests. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 68 | |
| Blank document page with a purple ink stamp from the Print Room. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 69 | |
| Circuit diagram for high tension direct current insulation testing using a trembler coil and rectifying valve. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 70 | |
| Mostly blank document with an illegible text body and a Print Room stamp. | 29th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 71 | |
| Proposed specification for testing Redmanol coil cases at temperatures up to 100°C. | 4th May 1927 | West Wittering \ Q \ 2April1927-June1927 72 | |
| Test procedures and results for condensers and coils, including resistance measurements, leakage current, and spark gap calibration. | 4th May 1927 | West Wittering \ Q \ 2April1927-June1927 73 | |
| Continuation page of a test report showing tabulated results for various cases. | 13th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 74 | |
| Development of a production test for Redmanol ignition coil cases. | 13th Apr 1927 | West Wittering \ Q \ 2April1927-June1927 75 | |
| Test results and conclusions for coil case resistance measurements at various temperatures. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 76 | |
| On the standardisation of sheet metal wing stays and delays with coachbuilders regarding their curvature. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 77 | |
| The bumping and road tests of the 40/50 HP front axle control, discussing braking performance and suggesting changes. | 1st May 1927 | West Wittering \ Q \ 2April1927-June1927 78 | |
| Analysis of arranging rear hydraulic dampers for torque control and the results of a bench test on the torque arm's influence on spring rating. | 30th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 79 | |
| Steering improvements for the 40/50 HP model, comparing road reaction and performance with other steering systems. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 80 | |
| Steering issues related to worm and nut components and high-speed wobbles. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 81 | |
| Ground clearance measurements for a 20 HP car fitted with smaller wheels. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 82 | |
| Wheel and tyre sizes, detailing issues from a recent run and plans to test new wheels. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 83 | |
| 10,000-mile test of Tungsten battery ignition points on chassis 10-G3 in France. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 84 | |
| Report discussing the performance and potential standardization of tungsten ignition contact points compared to platinum. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 85 | |
| The operational challenges and considerations of using tungsten points in distributors. | 1st May 1927 | West Wittering \ Q \ 2April1927-June1927 86 | |
| Ignition advance curves and controls for an aluminium engine with a turbulent head. | 1st May 1927 | West Wittering \ Q \ 2April1927-June1927 87 | |
| Blueprint graph comparing present and proposed ignition advance curves against engine RPM for the Lighter Phantom to LEC 2230. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 88 | |
| Stamped document from the Print Room in Derby. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 89 | |
| 20 HP battery ignition fault on chassis 10-G-111, which was traced to water on the plugs. | 6th May 1927 | West Wittering \ Q \ 2April1927-June1927 90 | |
| Preliminary issues with a sequence starter motor's armature engagement. | 7th May 1927 | West Wittering \ Q \ 2April1927-June1927 91 | |
| Oil consumption experiments on a Phantom test bench engine comparing different oil drain hole designs. | 1st May 1927 | West Wittering \ Q \ 2April1927-June1927 92 | |
| The performance and mileage testing of the N.B. type 40/50 dynamo on experimental cars. | 9th May 1927 | West Wittering \ Q \ 2April1927-June1927 93 | |
| Recommendation for the re-arrangement and standardisation of a machine and its brushes. | 9th May 1927 | West Wittering \ Q \ 2April1927-June1927 94 | |
| Trial arrangement of a No.2 scheme sequence starter, comparing its advantages over the No.1 scheme. | 10th May 1927 | West Wittering \ Q \ 2April1927-June1927 95 | |
| Continued report on testing the engagement of a motor pinion with the flywheel, detailing faults found during bench and chassis trials. | 10th May 1927 | West Wittering \ Q \ 2April1927-June1927 96 | |
| Technical analysis of a motor's design, focusing on magnetic flux, torque, and a comparison with a post-war Bosch motor unit. | 10th May 1927 | West Wittering \ Q \ 2April1927-June1927 97 | |
| Comparative analysis of a Bosch motor's electrical and mechanical characteristics. | 10th May 1927 | West Wittering \ Q \ 2April1927-June1927 98 | |
| Experiments to modify a motor's teaser winding to improve armature engagement. | 10th May 1927 | West Wittering \ Q \ 2April1927-June1927 99 | |
| Trials to suppress armature rotation and a comparison between an RR motor and a Bosch motor. | 16th May 1927 | West Wittering \ Q \ 2April1927-June1927 100 | |
| The impracticality of adopting 57 grooves in a car dynamo armature. | 16th May 1927 | West Wittering \ Q \ 2April1927-June1927 101 | |
| Inspecting a faulty Bosch ignition coil and requesting the return of an outdated Lucas magneto. | 17th May 1927 | West Wittering \ Q \ 2April1927-June1927 102 | |
| The failure of magnesium pedestal pistons after 1000 miles and the resulting design considerations. | 18th May 1927 | West Wittering \ Q \ 2April1927-June1927 103 | |
| Investigation into inertia and temperature stresses on pedestal type pistons. | 18th May 1927 | West Wittering \ Q \ 2April1927-June1927 104 | |
| Alterations and winding arrangements for the Sequence Starter Motor No.2. | 18th May 1927 | West Wittering \ Q \ 2April1927-June1927 105 | |
| Suggestions for the improvement of operation of platinum or tungsten ignition contact points. | 18th May 1927 | West Wittering \ Q \ 2April1927-June1927 106 | |
| Continued report on ignition system tests for components like contact breakers, distributors, and rotors. | 18th May 1927 | West Wittering \ Q \ 2April1927-June1927 107 | |
| Progress report on experiments and tests for various engine components, including cams, coils, and contact points. | 8th May 1927 | West Wittering \ Q \ 2April1927-June1927 108 | |
| Inspection report on a U.S.A. Bosch Ignition Coil, type TC.30, detailing its construction and the inability to find a cause for its partial failure. | 19th May 1927 | West Wittering \ Q \ 2April1927-June1927 109 | |
| Modifications to a Lucas ERS magneto and plans for future comparative testing. | 19th May 1927 | West Wittering \ Q \ 2April1927-June1927 110 | |
| Camshaft experiments for 20 HP engine power development. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 111 | |
| Engine performance comparing a long duration camshaft with a standard camshaft, detailing power curves and B.M.E.P values. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 112 | |
| Engine power development, detailing experiments with long duration cams, compression ratios, and induction pipe depression. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 113 | |
| Test results and specifications for an engine using long-duration inlet and exhaust cams. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 114 | |
| Summary of engine performance improvements achieved through various modifications to camshafts, compression, valves, and carburetors. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 115 | |
| Conclusions on 20 HP engine tests and proposals for further crankshaft and camshaft development for the Phantom and Falcon 10 engines. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 116 | |
| Performance graph showing the 20HP engine power increase from a long duration valve lift. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 117 | |
| Blank document page with a purple ink date stamp from the Derby office. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 118 | |
| Performance graph showing the power increase for a 20 HP engine due to various modifications. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 119 | |
| Graph showing the 20 HP engine's power increase due to long-duration valve lift, comparing standard and special camshafts. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 120 | |
| Diagram of a 20 HP long duration inlet valve lift, comparing it to the standard camshaft. | 23th Feb 1927 | West Wittering \ Q \ 2April1927-June1927 121 | |
| Timing diagram for a Long Durnon 20 HP camshaft, with a comparison to standard timing. | 23th Feb 1927 | West Wittering \ Q \ 2April1927-June1927 122 | |
| The recurring breakage of the 20 HP exhaust pipe and bracket, with a suggested solution based on the Silver Ghost design. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 123 | |
| On the unsatisfactory design of the 20 HP exhaust cutout and controls, citing wear and seizing issues. | 23th May 1927 | West Wittering \ Q \ 2April1927-June1927 124 | |
| Modifications and performance ratios for the Sequence Starter Motor No. 2 scheme. | 24th May 1927 | West Wittering \ Q \ 2April1927-June1927 125 | |
| Motor armature diameter and a proposed test using a 20 HP armature. | 24th May 1927 | West Wittering \ Q \ 2April1927-June1927 126 | |
| The failure and loss of rear brake squeak dampers on a 20HP vehicle. | 24th May 1927 | West Wittering \ Q \ 2April1927-June1927 127 | |
| Tests conducted on a rear silencer heat shield for Phantom cars to reduce interior overheating. | 25th May 1927 | West Wittering \ Q \ 2April1927-June1927 128 | |
| Adoption of a heat shield and the continued necessity of asbestos and gas-tight floorboards. | 31th Mar 1927 | West Wittering \ Q \ 2April1927-June1927 129 | |
| Design, testing, and production recommendation for Phantom rear axle jacking pads. | 26th May 1927 | West Wittering \ Q \ 2April1927-June1927 130 | |
| Power development test on a 20 HP engine using stronger valve springs and a long duration camshaft. | 26th May 1927 | West Wittering \ Q \ 2April1927-June1927 131 | |
| Testing Stromberg carburetters for low depression, acceleration, and low speed performance. | 24th Sep 1927 | West Wittering \ Q \ 2April1927-June1927 132 | |
| Graph showing the Brake Horse Power and Brake Mean Effective Pressure for a modified 201P standard engine. | 24th Sep 1927 | West Wittering \ Q \ 2April1927-June1927 133 | |
| Mostly blank document page with a purple ink stamp in the bottom right corner. | 26th May 1927 | West Wittering \ Q \ 2April1927-June1927 134 | |
| Overhaul of calculations for the Sequence Starter Motor No. 2 Scheme. | 28th May 1927 | West Wittering \ Q \ 2April1927-June1927 135 | |
| Axle control tests concerning the shock damper, a 12' lever, and torque arm design, seeking approval to standardise. | 31th May 1927 | West Wittering \ Q \ 2April1927-June1927 136 | |
| Performance issues and design considerations for a sequence starter motor following a change in reduction ratio. | 2nd Jun 1927 | West Wittering \ Q \ 2April1927-June1927 137 | |
| Technical memorandum discussing design modifications for a starter motor, including changes to the armature and winding. | 2nd Jun 1927 | West Wittering \ Q \ 2April1927-June1927 138 | |
| | | | |