| Description | Date | Identifier | |
| Graph showing the results of a battery discharge test after 8231 miles of use. | 21th Feb 1927 | West Wittering \ Q \ February1927-March1927 67 | |
| Graph showing continuous high rate discharge curves for 40-50 HP chassis batteries through a fixed resistance. | 1st Feb 1923 | West Wittering \ Q \ February1927-March1927 68 | |
| Analysis of the Lorraine Dietrich crankshaft's synchronous speeds, vibration, and torsional stiffness. | 1st Mar 1927 | West Wittering \ Q \ February1927-March1927 69 | |
| Analysis of crankshaft inertia, synchronous speed, and the effects of spring drives, with reference to Goshawk and 20 HP engines. | 1st Mar 1927 | West Wittering \ Q \ February1927-March1927 70 | |
| Progress report on torsional vibration experiments on the Lorraine and Goshawk engines. | 2nd Mar 1927 | West Wittering \ Q \ February1927-March1927 71 | |
| Graphical comparison of crankshaft stiffness and torsional deflection curves for a standard 20 HP and a Lorraine-Dietrich crankshaft. | 2nd Mar 1927 | West Wittering \ Q \ February1927-March1927 72 | |
| Blueprint of a crankshaft for a Lorraine-Dietrich engine, showing main dimensions and cross-sections. | 1st Mar 1927 | West Wittering \ Q \ February1927-March1927 73 | |
| Drawing of a piston, connecting rod, gudgeon pin, and related components for a Lorraine Dietrich engine. | 1st Mar 1927 | West Wittering \ Q \ February1927-March1927 74 | |
| Battery ignition contact points and the probable standardisation of tungsten points. | 4th Mar 1927 | West Wittering \ Q \ February1927-March1927 75 | |
| Instructions on the correct lining, maintenance, and cleaning of battery ignition contact points. | 2nd Mar 1927 | West Wittering \ Q \ February1927-March1927 76 | |
| Standardisation and supply of tungsten contact breaker points and related ignition system design considerations. | 4th Mar 1927 | West Wittering \ Q \ February1927-March1927 77 | |
| Optimizing ignition systems, focusing on inductance, condenser capacity, and contact point life. | 4th Mar 1927 | West Wittering \ Q \ February1927-March1927 78 | |
| The sufficiency of a hold-on electromagnet for the Sequence Starter No.2 Scheme. | 8th Mar 1927 | West Wittering \ Q \ February1927-March1927 79 | |
| The inspection, performance, and testing of a P & R Special Battery 3A. | 8th Mar 1927 | West Wittering \ Q \ February1927-March1927 80 | |
| The condition of a No.3A Experimental Battery after service and testing. | 5th Mar 1927 | West Wittering \ Q \ February1927-March1927 81 | |
| Report from Peto & Radford comparing the performance of 9-plate and 7-plate battery cells. | 8th Mar 1927 | West Wittering \ Q \ February1927-March1927 82 | |
| Technical discussion on the suitability of a sleeve-type magneto for the 20 HP chassis. | 8th Mar 1927 | West Wittering \ Q \ February1927-March1927 83 | |
| Comparison of sleeve and rotating armature magneto performance, referencing the 20 HP, 40/50 HP, and E06 models. | 8th Mar 1927 | West Wittering \ Q \ February1927-March1927 84 | |
| Modifications to the R.O.1 magneto, its performance, and comparing the capabilities of suppliers. | 7th Mar 1927 | West Wittering \ Q \ February1927-March1927 85 | |
| Technical memo detailing the results of braking tests on model EAC-V11. | 7th Mar 1927 | West Wittering \ Q \ February1927-March1927 86 | |
| Steering geometry and the damped pendulum lever to avoid high-speed wobbles and 'shimmy'. | 14th Mar 1927 | West Wittering \ Q \ February1927-March1927 87 | |
| Steering system performance, issues like wobbles, and potential improvements. | 14th Mar 1927 | West Wittering \ Q \ February1927-March1927 88 | |
| Steering improvements related to friction, damping, springs, and the effect of an aluminium engine. | 1st Feb 1927 | West Wittering \ Q \ February1927-March1927 89 | |
| Preventing the overcharging of car accumulators by comparing gassing indicators with automatic switches. | 15th Mar 1927 | West Wittering \ Q \ February1927-March1927 90 | |
| Modifications to the charging and ignition system, including observations from road tests. | 15th Mar 1927 | West Wittering \ Q \ February1927-March1927 91 | |
| Road tests of the electrical auto-switch and charging system for various chassis. | 15th Mar 1927 | West Wittering \ Q \ February1927-March1927 92 | |
| Test report on the performance of an electrical switch and dynamo output under various car running conditions. | 20th Mar 1913 | West Wittering \ Q \ February1927-March1927 93 | |
| Technical description of an auto-switch for regulating battery charging and an experiment to reduce dynamo output. | 20th Mar 1913 | West Wittering \ Q \ February1927-March1927 94 | |
| The performance of the auto-charge reducing switch, incorporating customer feedback on the electrical system's behavior. | 21th Mar 1927 | West Wittering \ Q \ February1927-March1927 95 | |
| Tests and a proposed solution for problematic water pump glands on 20 HP and 40/50 HP chassis. | 21th Mar 1927 | West Wittering \ Q \ February1927-March1927 96 | |
| Blueprint of a modification for a 40/50 water pump, specifically showing spring-loaded asbestos rope glands. | 21th Mar 1927 | West Wittering \ Q \ February1927-March1927 97 | |
| Three experiments for a battery ignition system, involving an off-set cam and a new lever. | 23th Mar 1927 | West Wittering \ Q \ February1927-March1927 98 | |
| The unsatisfactory performance of English bodywork on continental roads, comparing it with French-built bodies. | 29th Mar 1927 | West Wittering \ Q \ February1927-March1927 99 | |
| Custom-made luggage box from Vitton's in Paris for a Phantom model. | 1st Mar 1927 | West Wittering \ Q \ February1927-March1927 100 | |
| The front seat comfort for three passengers and an update on receiving details for various body types. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 101 | |
| Technical comparison of the Grav-Vac and Autovac vacuum petrol feed systems. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 102 | |
| Performance comparison graph of Autovac and Grav-Vac petrol feed systems on a 20 HP engine. | 29th Mar 1927 | West Wittering \ Q \ February1927-March1927 103 | |
| Page with a purple date stamp from Derby. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 104 | |
| Test bench performance of a Lorraine-Dietrich engine and its comparison to a 20 HP engine. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 105 | |
| Performance analysis of a six-cylinder engine, detailing its compression, detonation, and power output compared to other models. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 106 | |
| The performance of a twin Zenith carburetter setup, including a sketch of the induction system. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 107 | |
| Description of an engine's offset cylinder 'desaxe' arrangement and induction pipe depression. | 23th Apr 1925 | West Wittering \ Q \ February1927-March1927 108 | |
| Comparison of engine valve gear, valve lift diagrams, and gas velocity characteristics. | 23th Apr 1925 | West Wittering \ Q \ February1927-March1927 109 | |
| Comparison of the Lorraine and Goshawk engines, focusing on gas velocity, mechanical efficiency, friction losses, and ignition systems. | 2nd Feb 1927 | West Wittering \ Q \ February1927-March1927 110 | |
| Analysis of engine performance, comparing spark advance, detonation, and cylinder head design with Hispano and other models. | 28th Nov 1928 | West Wittering \ Q \ February1927-March1927 111 | |
| Analysis of a 20 HP engine's power curves in comparison to a Lorraine engine, detailing an inlet valve with a detachable guide cage. | 28th Nov 1928 | West Wittering \ Q \ February1927-March1927 112 | |
| Report page on engine testing, detailing vibration analysis, valve performance, and general conclusions. | 25th Jan 1926 | West Wittering \ Q \ February1927-March1927 113 | |
| Comparison of the chief characteristics of the Lorraine engine with the 20 HP engine. | 25th Jan 1926 | West Wittering \ Q \ February1927-March1927 114 | |
| Report page discussing the use of large diameter valves with Lorraine carburetters. | 18th Aug 1927 | West Wittering \ Q \ February1927-March1927 115 | |
| Diagram comparing the exhaust valve lift of a Lorraine-Dietrich engine against a 20 HP R.R. engine. | 18th Aug 1927 | West Wittering \ Q \ February1927-March1927 116 | |
| Blank page with a purple date stamp from Derby. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 117 | |
| Diagram comparing the inlet valve lift of a Lorraine-Dietrich engine and a 20hp R.R. engine. | 18th Mar 1927 | West Wittering \ Q \ February1927-March1927 118 | |
| Performance graph of mechanical efficiency and compression pressure curves for a Lorraine-Dietrich engine, compared to a 20 HP R.R. engine. | 21th Mar 1927 | West Wittering \ Q \ February1927-March1927 119 | |
| Graph comparing the power per unit cubic capacity and petrol consumption of a Lorraine-Dietrich engine and a 20 HP engine. | 16th Mar 1927 | West Wittering \ Q \ February1927-March1927 120 | |
| Power curve graph for a Lorraine-Dietrich engine with comparative data for a 20 HP R.R. engine. | 23th Mar 1927 | West Wittering \ Q \ February1927-March1927 121 | |
| Graph comparing the depression in the induction pipe for a Lorraine-Dietrich engine and a 20 HP R.R. engine. | 21th Mar 1927 | West Wittering \ Q \ February1927-March1927 122 | |
| Graph comparing necessary ignition advance versus engine RPM for Lighter Phantom and Lorraine-Dietrich engines. | 17th Mar 1927 | West Wittering \ Q \ February1927-March1927 123 | |
| Graph of curves showing gas velocity past the valves for a Lorraine-Dietrich engine, with a comparison to a 20 HP R.R. engine. | 25th Mar 1927 | West Wittering \ Q \ February1927-March1927 124 | |
| Graph comparing Indicated Horse Power and Indicated Mean Effective Pressure curves for a Lorraine-Dietrich and a 20 HP engine. | 25th Mar 1927 | West Wittering \ Q \ February1927-March1927 125 | |
| Blank page with a purple company stamp from the print room. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 126 | |
| Graph of the inlet valve lift and piston displacement curve for a Lorraine-Dietrich engine. | 28th Mar 1927 | West Wittering \ Q \ February1927-March1927 127 | |
| Graph showing the inlet valve lift and piston displacement curve for a 20 HP engine. | 28th Mar 1927 | West Wittering \ Q \ February1927-March1927 128 | |
| Graph showing the power necessary to rotate a Lorraine-Dietrich engine, compared to a 20 HP R.R. engine. | 29th Mar 1927 | West Wittering \ Q \ February1927-March1927 129 | |
| Valve spring rating chart for a Lorraine-Dietrich engine. | 29th Mar 1927 | West Wittering \ Q \ February1927-March1927 130 | |
| Comparison of engine specifications between the Lorraine-Dietrich and a standard 20 HP engine. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 131 | |
| Severely faded document with a purple ink stamp in the bottom right corner. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 132 | |
| Requesting more detailed information and a drawing for a 'green lamp scheme' charge indicator before testing. | 30th Mar 1927 | West Wittering \ Q \ February1927-March1927 133 | |
| Design of spring clips, recommending a move away from clips made solid with the plate towards a simple forged and rivetted design. | 31th Mar 1927 | West Wittering \ Q \ February1927-March1927 134 | |
| Retaining a 20HP car for design reference and considering another chassis for engine trials. | 1st Jan 1927 | West Wittering \ Q \ January1927-March1927 1 | |
| Limitations of long chassis cars in congested traffic and the ride quality of shorter cars. | 1st Jan 1927 | West Wittering \ Q \ January1927-March1927 2 | |
| Policy on fitting a separate insulated junction box for battery connections on the frame. | 1st Jan 1927 | West Wittering \ Q \ January1927-March1927 3 | |
| Supply of Zeiss headlamps and a full-scale drawing for the 10 EX model. | 1st Jan 1927 | West Wittering \ Q \ January1927-March1927 4 | |
| Design of bonnet clips and locks, comparing existing models and suggesting improvements. | 5th Jan 1927 | West Wittering \ Q \ January1927-March1927 5 | |
| Technical memorandum discussing three different schemes for a bonnet lock on the 40/50 & 20HP models. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 6 | |
| Design notes and diagrams for a bonnet locking mechanism, discussing the barrel, pinion, and locking plate. | 1st Feb 1927 | West Wittering \ Q \ January1927-March1927 7 | |
| Design notes and sketches for various bonnet fastener components and mechanisms. | 14th Feb 1927 | West Wittering \ Q \ January1927-March1927 8 | |
| Design considerations and modifications for a 40/50 model bonnet and radiator. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 9 | |
| Design considerations and sketches for bonnet, radiator, and scuttle modifications, comparing integral and non-integral designs. | 1st Jan 1927 | West Wittering \ Q \ January1927-March1927 10 | |
| With diagrams proposing modifications to the radiator and bonnet shape for improved appearance. | 28th Feb 1927 | West Wittering \ Q \ January1927-March1927 11 | |
| Telegram regarding specifications for a new starter motor. | 4th Jan 1927 | West Wittering \ Q \ January1927-March1927 12 | |
| Request for a Phantom starter motor carcase and its components to use as a model. | 6th Jan 1927 | West Wittering \ Q \ January1927-March1927 13 | |
| Wiring arrangements and conductor size for a Phantom starter motor. | 5th Jan 1927 | West Wittering \ Q \ January1927-March1927 14 | |
| Comparing blueprints and thread standards for spherical seated unions. | 5th Jan 1927 | West Wittering \ Q \ January1927-March1927 15 | |
| Design scheme for bonnet clips featuring spring fingers and notes on materials and implementation. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 16 | |
| Bonnet design modifications and urging a decision to be made. | 6th Jan 1927 | West Wittering \ Q \ January1927-March1927 17 | |
| Proposed linkage for the mixture control on the steering column for a 20HP vehicle. | 6th Jan 1927 | West Wittering \ Q \ January1927-March1927 18 | |
| Fitting front axle control and other modifications to an existing chassis. | 6th Jan 1927 | West Wittering \ Q \ January1927-March1927 19 | |
| Sketch and notes detailing the wiring scheme for the Phantom starter motor. | 5th Jan 1927 | West Wittering \ Q \ January1927-March1927 20 | |
| The potential difference in mechanical stiffness of battery ignition contact points between the RR and Remy models. | 6th Jan 1927 | West Wittering \ Q \ January1927-March1927 21 | |
| F.10 spring drive with a larger driving shaft and its application on supercharged engines. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 22 | |
| Performance of battery ignition contact maker points and proposing investigations into their design. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 23 | |
| Design modifications for the Phantom Sequence Starter No. 2 Scheme, including windings and carcase length. | 8th Jan 1927 | West Wittering \ Q \ January1927-March1927 24 | |
| Design, materials, and standardization of new pipe unions. | 12th Jan 1927 | West Wittering \ Q \ January1927-March1927 25 | |
| Letter to Messrs Hooper & Co Ltd chasing the completion and delivery date of a Phantom Experimental Cabriolet de Ville body. | 10th Jan 1927 | West Wittering \ Q \ January1927-March1927 26 | |
| Failure in the 20HP steering longitudinal tube and proposing a solution. | 14th Jan 1927 | West Wittering \ Q \ January1927-March1927 27 | |
| Correcting a figure for the shorter 40/50 bonnet and discussing suggestions for improving its appearance. | 11th Jan 1927 | West Wittering \ Q \ January1927-March1927 28 | |
| Returning an incorrect starter motor carcase that was missing its field coils. | 11th Jan 1927 | West Wittering \ Q \ January1927-March1927 29 | |
| Proposed modifications to the 40/50 model's bonnet and radiator, advocating for gradual change. | 27th Jan 1927 | West Wittering \ Q \ January1927-March1927 30 | |
| Proposed modifications to the 40/50 bonnet and radiator proportions. | 18th Jan 1927 | West Wittering \ Q \ January1927-March1927 31 | |
| The main field windings for a Phantom starter motor. | 11th Jan 1927 | West Wittering \ Q \ January1927-March1927 32 | |
| | | | |