Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2250 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Remedies for transmission knock and uneven engine firing, including ignition systems and fuel quality.1st Jun 1921West Wittering \ G \ June1921  Scan11
Letter discussing issues with Bijur and Lucas dynamos and proposing future chassis be sent to America without them.6th Jun 1921West Wittering \ G \ June1921  Scan12
Issues with leaky Exide battery cells, unreliable Lucas cutouts, and engine over-oiling problems.8th Jun 1921West Wittering \ G \ June1921  Scan13
Technical memo discussing pistons, clutch over-oiling, and alterations to the induction system.8th Jun 1921West Wittering \ G \ June1921  Scan14
Carburettor and throttle design modifications based on experiments.1st Jun 1921West Wittering \ G \ June1921  Scan15
Recommendations for American owners on castor oil lubricants and an update on magneto issues and improvements.1st Jun 1921West Wittering \ G \ June1921  Scan16
Request for information on the best method for fixing platinum points and other similar materials.14th Jun 1921West Wittering \ G \ June1921  Scan18
Accompanying drawing No. LeC.1403 for the Goshawk II bonnet catch.9th Jun 1921West Wittering \ G \ June1921  Scan19
Design and placement of a bonnet catch for the Goshawk II.14th Jun 1921West Wittering \ G \ June1921  Scan20
Sending drawing LeC.1405 for Dynamos & Motors for the Goshawk I & II and 40 HP Chassis.9th Jun 1921West Wittering \ G \ June1921  Scan21
From R. to H.S. and E.F.C. about correspondence with Brolt Limited and arranging an interview.9th Jun 1921West Wittering \ G \ June1921  Scan22
Carburettor arrangements and throttle heating methods in response to American complaints.11th Jun 1921West Wittering \ G \ June1921  Scan23
'Goshawk II' engine starting switch, suggesting Bakelite Micarta as an alternative to mica insulation.10th Jun 1921West Wittering \ G \ June1921  Scan24
Faults with Watford magnetos and the adoption of a newer sleeve type.10th Jun 1921West Wittering \ G \ June1921  Scan25
Advance blueprint for a 40/50 HP carburettor and induction system designed for American conditions.1st Jun 1921West Wittering \ G \ June1921  Scan26
Request for an 'Autovac' for a 'Goshawk II' chassis, correcting the subject which originally mentioned a 'Dynamo'.6th Jun 1921West Wittering \ G \ June1921  Scan27
Requesting a test of the Smith Type 5S motor for the 'Goshawk II'.15th Jun 1921West Wittering \ G \ June1921  Scan29
Specifications and stock availability for Brolt lighting equipment for 40/50 HP and 20 HP models.7th Jun 1921West Wittering \ G \ June1921  Scan30
Issues with Exide batteries and considering C.A.V.-Willard batteries as an alternative for installations.14th Jun 1921West Wittering \ G \ June1921  Scan31
Analysis and description of the construction of a Delco Packard ignition condenser, including a diagram.15th Jun 1921West Wittering \ G \ June1921  Scan32
The design and construction of Goshawk II 'B' and 'D' type dashboards.21th Jun 1921West Wittering \ G \ June1921  Scan34
Sending drawing No.Lec.1409, which details a modification to simplify the coring on the 'Goshawk II' crankcase.21th Jun 1921West Wittering \ G \ June1921  Scan35
Petrol tank modifications for the '4 EX' model, discussing materials and design improvements.24th Jun 1921West Wittering \ G \ June1921  Scan36
Quality and design of carburettor fittings and petrol level indicators for the American market.21th Jun 1921West Wittering \ G \ June1921  Scan37
Review of the Bosch Battery Ignition system, its applicability to the current chassis, and suggestions for improvements.21th Jun 1921West Wittering \ G \ June1921  Scan38
Technical memo discussing design and performance of a driving spindle, condenser, and low tension contact maker.21th Jun 1921West Wittering \ G \ June1921  Scan39
Design and fitting of an ignition governor, coil, ballast resistance, and storage for spares.21th Jun 1921West Wittering \ G \ June1921  Scan40
Application of American Bosch ignition systems and the selection of dynamos and switchboxes.21th Jun 1921West Wittering \ G \ June1921  Scan41
Sketch of a spigot for an American Bosch battery ignition throttle governor casing on a 40/50 chassis.23th Jun 1921West Wittering \ G \ June1921  Scan43
The condition of car 4 EX following its return from America, detailing its overall state, rear springs, and induction pipe modifications.20th Jun 1921West Wittering \ G \ June1921  Scan44
Future car carburettor positioning and starting system designs.1st Jun 1921West Wittering \ G \ June1921  Scan45
Water temperature control system, including radiator louvres and thermostats, and the Bijur starter motor.1st Jun 1921West Wittering \ G \ June1921  Scan46
Technical memo discussing the efficiency of starter motors and issues with the starter press button, Klaxon switch, and dynamo equipment.17th Jun 1921West Wittering \ G \ June1921  Scan47
Communication discussing failures in the charging system and proposing a switch to a more reliable Bijur dynamo and regulator.17th Jun 1921West Wittering \ G \ June1921  Scan48
Technical memo discussing issues with the Bijur dynamo and distribution board.1st Jun 1921West Wittering \ G \ June1921  Scan49
Merits of double versus earthed wiring systems and evaluating a Westinghouse switch box.17th Jun 1921West Wittering \ G \ June1921  Scan50
Properties and potential applications of Monel Metal as an alternative to stainless steel in various car parts.21th Jun 1921West Wittering \ G \ June1921  Scan52
The progress and outstanding items for the 'Goshawk II' chassis.21th Jun 1921West Wittering \ G \ June1921  Scan53
Modifications to rear springs, including new bushings and an abandonment of the cantilever method.24th Jun 1921West Wittering \ G \ June1921  Scan54
The results and methodology of starter motor brake efficiency and static torque tests.22th Jun 1921West Wittering \ G \ June1921  Scan55
Comparison of an experimental starter motor's performance against the standard production motor.22th Jun 1921West Wittering \ G \ June1921  Scan56
Motor temperature conditions and static torque tests for engines.22th Jun 1921West Wittering \ G \ June1921  Scan57
Continuation of a report calculating engine torque based on amperes, chain reduction, and motor voltage.22th Jun 1921West Wittering \ G \ June1921  Scan58
Graph of performance curves for an experimental starter motor, showing efficiency, voltage, BHP, amperes, and torque against speed.20th Dec 1930West Wittering \ G \ June1921  Scan59
Performance graph showing the brake efficiency, speed, voltage, and power of a starter motor against torque.6th Jun 1921West Wittering \ G \ June1921  Scan60
Performance graph showing brake efficiency, horsepower, voltage, amperage, and speed against torque for an experimental starter motor.23th Jun 1921West Wittering \ G \ June1921  Scan62
Design and potential points of failure for the Goshawk II rear springs.14th Nov 1924West Wittering \ G \ June1921  Scan63
Instruction to increase the size and move the petrol tanks for the 'Goshawk II' model.22th Jun 1921West Wittering \ G \ June1921  Scan64
The rearrangement of the condenser for the 40/50 HP chassis.6th Jun 1921West Wittering \ G \ June1921  Scan65
Drawings for the 'Goshawk II' engine starting switch and pedal.21th Jun 1921West Wittering \ G \ June1921  Scan66
Confirming the dispatch of drawings for the Goshawk II's ballast resistance and ignition wiring.21th Jun 1934West Wittering \ G \ June1921  Scan67
From 'E' to 'HS' urging action on the 'Goshawk' II Autovac at the request of Mr. Royce.1st Jun 1931West Wittering \ G \ June1921  Scan68
The failure and testing of Galli-ator radiator shutters fitted to the 4 EX experimental car.23th Jun 1931West Wittering \ G \ June1921  Scan69
The operation of vacuum-operated radiator shutters, detailing issues with leakage and insufficient vacuum at full throttle.23th Jun 1921West Wittering \ G \ June1921  Scan70
Comparison of American Foxboro' instrument gauges with existing English gauges for the 4. EX car.24th Jun 1921West Wittering \ G \ June1921  Scan72
The decision to adopt standard C.A.V.-Willard batteries, weighing their merits against the convenience of separate cell batteries.28th Jun 1921West Wittering \ G \ June1921  Scan74
Cable received from Springfield requesting drawings for a Hives Pilot Jet.1st Jun 1921West Wittering \ G \ June1921  Scan75
Suggestions for simplifying the cores for the 'Goshawk II' crankcase, referencing drawings Lec.1413 and 1414.24th Jun 1921West Wittering \ G \ June1921  Scan76
Directive to halt detailing work on the Goshawk II battery ignition and governor mechanism.23th Jun 1921West Wittering \ G \ June1921  Scan78
The re-standardisation of a 40/50 HP condenser, specifically concerning a new earth connection and stud fixing.28th Jun 1921West Wittering \ G \ June1921  Scan79
In-house production of Bakelite moulds, coil cases, and other electrical components.27th Jun 1921West Wittering \ G \ June1921  Scan81
Design flaws of the side filler on the petrol tank for the 4.EX car.26th Jun 1921West Wittering \ G \ June1921  Scan83
The design and issues of petrol tank level indicators, fillers, and vent pipes, comparing different schemes.28th Jun 1921West Wittering \ G \ June1921  Scan84
Comparison of fuel indicators for the 4.EX car and a critique of a petrol filter fitting design.1st Jun 1921West Wittering \ G \ June1921  Scan85
Results of performance and discharge tests on batteries, specifically the R.R. Tudor 1.2nd Jun 1921West Wittering \ G \ June1921  Scan87
The performance and testing of various batteries, including models from Tudor, De Martin, and Exide.2nd Jun 1921West Wittering \ G \ June1921  Scan88
The performance and testing of C.A.V. Willard batteries, including vibration tests.2nd Jun 1921West Wittering \ G \ June1921  Scan89
Table of results from experimental tests on charging, lighting, and starting batteries.6th Aug 1919West Wittering \ G \ June1921  Scan90
Graph showing intermittent high rate discharge tests of various batteries.6th May 1921West Wittering \ G \ June1921  Scan93
Discharge test graph for an R.R. Tudor I component.19th May 1921West Wittering \ G \ June1921  Scan94
Recommending the modern 'Boyce' patent push-on tyre pump connection over the old-fashioned screw type.2nd Jun 1921West Wittering \ G \ June1921  Scan95
Presenting a table of results from heating tests conducted on inherently controlled chassis dynamos.1st Jun 1921West Wittering \ G \ June1921  Scan96
Test results for inherently controlled chassis dynamos.3rd Jun 1921West Wittering \ G \ June1921  Scan97
Experimental running of tungsten contact points, including a suggestion from Mr. Royce.6th Jun 1921West Wittering \ G \ June1921  Scan98
Various bench tests conducted on tungsten contact points supplied by the Tungsten Manufacturing Co.25th May 1921West Wittering \ G \ June1921  Scan99
Report page detailing observations on metal surfaces after a 45-hour experiment involving tungsten points and electrical sparking.1st Jun 1921West Wittering \ G \ June1921  Scan100
Test report on tungsten contact points from Fansteel Co. U.S.A. after a 400-hour bench run.1st Jun 1921West Wittering \ G \ June1921  Scan101
The preliminary test run of a lengthened Lucas E.575 dynamo.11th Jun 1921West Wittering \ G \ June1921  Scan102
Adoption of straight-sided cord tyres for the 'Goshawk' model and their performance.22th Jun 1921West Wittering \ G \ June1921  Scan103
Performance test results of a lengthened Lucas E.575 dynamo.22th Jun 1921West Wittering \ G \ June1921  Scan104
Comparison of dynamo control methods, specifically regarding the performance of the control brush.22th Jun 1921West Wittering \ G \ June1921  Scan105
Continued typed report page comparing a machine's temperature performance against a Smith machine.22th Jun 1921West Wittering \ G \ June1921  Scan106
Graph comparing output curves for standard and lengthened Lucas E57S dynamos under hot and cold conditions.23th Jun 1921West Wittering \ G \ June1921  Scan107
Modifications to Exide and Tudor batteries to prevent corrosion on terminal lugs.23th Jun 1921West Wittering \ G \ June1921  Scan108
Analysis of battery terminal corrosion concerning brass and leaden washers, and suggestions for improved arrangements.23th Jun 1921West Wittering \ G \ June1921  Scan109
Comparison of battery specifications and performance from suppliers such as Tudor, C.A.V., and Exide.23th Jun 1921West Wittering \ G \ June1921  Scan110
Note comparing the prices of Tudor, Exide, and C.A.V. Willard batteries.23th Jun 1921West Wittering \ G \ June1921  Scan111
Results of disintegration tests conducted on battery plates.23th Jun 1921West Wittering \ G \ June1921  Scan112
Variability and failure issues in single field winding, third brush controlled dynamos.23th Jun 1921West Wittering \ G \ June1921  Scan113
The endurance testing of a new type Lucas cutout with a duplex magnetic circuit.24th Jun 1921West Wittering \ G \ June1921  Scan114
Analysis of a fault in a cutout component concerning operating voltage and reverse current.24th Jun 1921West Wittering \ G \ June1921  Scan115
The performance of an electrical cutout, noting issues with battery charging and magnetic reluctance.24th Jun 1921West Wittering \ G \ June1921  Scan116
Standardisation of smaller iridio-platinum contact points and increasing condenser capacity.11th Dec 1921West Wittering \ G \ October1921  Scan0
The quality, testing, and adjustment of Bleriot Phi Cutouts samples fitted to various chassis.6th Oct 1921West Wittering \ G \ October1921  Scan1
Testing of a Bleriot Phi cutout and its potential use on the Goshawk chassis.16th Oct 1921West Wittering \ G \ October1921  Scan2
Test report on a Smith 4D dynamo for the Goshawk II engine.17th Oct 1921West Wittering \ G \ October1921  Scan3
The specifications and performance testing of a dynamo, including cold condition and heating test results.17th Oct 1921West Wittering \ G \ October1921  Scan4
Page 3 of a report noting that maximum temperature did not coincide with the largest output obtained.7th Oct 1921West Wittering \ G \ October1921  Scan5
Weight correction and specifications for the X.4359L Lucas E.5RR Dynamo for the 'Goshawk II'.7th Oct 1921West Wittering \ G \ October1921  Scan7
Dynamo switch configurations, circulating current, and output variations on different machines.7th Oct 1921West Wittering \ G \ October1921  Scan8


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙