Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1178 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Request to make two Phantom III exhaust tail pipe adaptors as per a sketch.2nd Dec 1936Box 93 \ 1  scan0063
Notification regarding a revision to the Phantom III exhaust system to provide clearance for a wiring conduit.2nd Dec 1936Box 93 \ 1  scan0064
Disappointment and required modifications for the new Phantom III exhaust system.4th Dec 1936Box 93 \ 1  scan0065
Completion of designs for the Phantom III simplified exhaust system.5th Dec 1936Box 93 \ 1  scan0066
Requesting accurate cost comparisons between electrically welded and drawn tubes due to conflicting information.8th Dec 1936Box 93 \ 1  scan0067
Exhaust boom noise issues at certain speeds and potential remedies.7th Dec 1936Box 93 \ 1  scan0068
Proactive car improvements based on inspectors' reports, specifically a planned test of rubber between the body and chassis.8th Dec 1936Box 93 \ 1  scan0069
Query regarding a material change for the carburetter air silencer from 28 SWG to 26 SWG planished steel due to sourcing difficulties.15th Dec 1936Box 93 \ 1  scan0070
Modifications to the Phantom III exhaust system to reduce weight and cost.17th Nov 1936Box 93 \ 1  scan0071
Rear silencer placement for future designs, referencing limitations on the Phantom III model.17th Nov 1936Box 93 \ 1  scan0072
Blueprint for a modified Phantom III exhaust system.12th Nov 1936Box 93 \ 1  scan0073
Material ordering and testing for the Phantom III exhaust system.12th Nov 1936Box 93 \ 1  scan0074
Material gauge for a carburetter air silencer.18th Dec 1936Box 93 \ 1  scan0075
Standardisation of the Phantom III exhaust system to replace Staybrite exhaust lag with nickel-plated mild steel.27th Nov 1936Box 93 \ 1  scan0076
The reverse of a 'Standardisation of Parts' form, noting nil cost for new tools and order details.5th Nov 1936Box 93 \ 1  scan0077
Inadequate experimental exhaust system and a request for modification.22th Dec 1936Box 93 \ 1  scan0078
The standardization and material ordering for a new type of exhaust system for the Phantom III model.21th Dec 1936Box 93 \ 1  scan0079
Requesting instructions for either the present or a modified Phantom III exhaust system.31th Dec 1936Box 93 \ 1  scan0080
Request to manufacture a mild steel pipe for test purposes on a Phantom III exhaust system.7th Jan 1937Box 93 \ 1  scan0081
Changes to the Phantom III exhaust system for production standardisation.19th Jan 1937Box 93 \ 1  scan0082
Request to fabricate experimental exhaust system components for the Phantom III for testing purposes.20th Jan 1937Box 93 \ 1  scan0083
Manufacture of Phantom III exhaust systems from different treated mild steels to test their non-corrosive qualities.20th Jan 1937Box 93 \ 1  scan0084
Requesting the creation of an experimental silencer for a Phantom III exhaust system.20th Jan 1937Box 93 \ 1  scan0085
The development of the Phantom III exhaust system, addressing noise issues and material changes for cost savings.20th Jan 1937Box 93 \ 1  scan0086
Estimation of cost savings for the Phantom III exhaust system by using aluminised mild steel.13th Jan 1937Box 93 \ 1  scan0087
Material ordering deadlines for the Phantom III 'C' Series and the decision to not proceed with a thermostat scheme.24th Dec 1936Box 93 \ 1  scan0088
The approval and fitting of exhaust tail pipe adaptors.1st Feb 1937Box 93 \ 1  scan0089
Request for the manufacture of parts for a Phantom III Experimental Exhaust System.2nd Feb 1937Box 93 \ 1  scan0090
Confirmation to instruct production for chromium plated exhaust tail pipe extension pieces for all chassis.3rd Feb 1937Box 93 \ 1  scan0091
Request to make a chromium-plated tailpipe extension for a Phantom III exhaust system for a special customer.11th Feb 1937Box 93 \ 1  scan0092
Request to fabricate a 'Y' piece and three baffles for a Phantom III experimental silencer.6th Mar 1937Box 93 \ 1  scan0093
Noise originating from the front expansion box of the 33-EX exhaust system.23th Mar 1937Box 93 \ 1  scan0094
Requesting the fabrication of two experimental downtake pipes for an exhaust system.2nd Apr 1937Box 93 \ 1  scan0095
Responding to a telegram about the exhaust system, connecting rods and main bearings for chassis 35-EX.5th Apr 1937Box 93 \ 1  scan0096
Broken exhaust system connection on a 32-EX Phantom III and the subsequent temporary repair.15th Jul 1937Box 93 \ 1  scan0097
Investigation into exhaust noise on the Phantom III vehicle.23th Oct 1937Box 93 \ 1  scan0098
Collection of memo extracts regarding experiments on exhaust system design to reduce noise.15th Oct 1937Box 93 \ 1  scan0099
Modifications to the exhaust system to cure drone issues and comparing expansion box sizes.15th Oct 1937Box 93 \ 1  scan0100
Material change for the Phantom III exhaust system from Staybrite to aluminised steel, including cost analysis and a proposed design modification.22th Nov 1937Box 93 \ 1  scan0101
Modifications to the aluminized exhaust system for the Phantom III.29th Nov 1937Box 93 \ 1  scan0102
Alteration notice regarding exhaust fittings for the Phantom III Chassis.11th Jan 1938Box 93 \ 1  scan0103
Modifications to the Phantom III exhaust downtake pipe and intermediate pipe support to accommodate a Wraith-type steering gear and modified starter motor.13th Apr 1938Box 93 \ 1  scan0104
Experimental design for lubricating the exhaust support bearings on a Phantom III to eliminate squeaking.26th Apr 1938Box 93 \ 1  scan0105
Requesting to fit an oil feed scheme to the exhaust system suspension links on a Phantom III car.30th Apr 1938Box 93 \ 1  scan0106
Design and testing of a rubber suspension system for the Phantom III exhaust.3rd Jun 1938Box 93 \ 1  scan0107
Design of connecting rods for the Spectre engine, specifically addressing dismantling difficulties.23th Mar 1933Box 93 \ 1  scan0108
Alternative strap type of connecting rod for the Spectre Engine.31th Jul 1934Box 93 \ 1  scan0109
Modification to Spectre connecting rods to resolve a bearing failure.15th Nov 1934Box 93 \ 1  scan0110
Proposal to modify the Spectre connecting rod design to simplify the manufacturing process.15th Feb 1935Box 93 \ 1  scan0111
Secret memo discussing modifications to oil grooves in Spectre strap-type connecting rods, referencing blueprint LeC.4624.3rd Aug 1935Box 93 \ 1  scan0112
Drawing detailing modifications to the oil grooves of a connecting rod big end bush for the Spectre engine.3rd Aug 1935Box 93 \ 1  scan0113
Secret memorandum about a modification to the Spectre connecting rod bolts to prevent stretching.17th Aug 1935Box 93 \ 1  scan0114
Request for the weights of Spectre connecting rods, pistons, rings, and gudgeon pins.6th Nov 1935Box 93 \ 1  scan0115
Providing blueprints with information on Phantom III connecting rod weights.8th Nov 1935Box 93 \ 1  scan0116
Blueprint detailing the weights of Spectre engine connecting-rods and pistons.6th Nov 1935Box 93 \ 1  scan0117
List specifying the weights of large and small ends for Spectre, Marine, and Plain type rods.22th Jan 1936Box 93 \ 1  scan0118
Design and experimental clearance of Phantom III marine-type connecting rods.5th Feb 1936Box 93 \ 1  scan0119
Requesting works prints and instructions for a modification to Phantom III connecting rods.23th Mar 1936Box 93 \ 1  scan0120
Reconsideration of deleting an oil hole in connecting rods to manage oil consumption and lubrication.19th Aug 1936Box 93 \ 1  scan0121
Change to the panel milling for Phantom III connecting rods.27th Oct 1936Box 93 \ 1  scan0122
The distortion test of a connecting rod under various conditions.7th Dec 1936Box 93 \ 1  scan0123
Distortion test results for a Phantom III forked connecting rod and bearing under a 5000lb load.3rd Dec 1936Box 93 \ 1  scan0124
Distortion test results for a forked connecting rod and bearing under a 5,000lb load.3rd Dec 1936Box 93 \ 1  scan0125
Cost and potential issues of using articulated rods on the Phantom III engine.29th Jan 1937Box 93 \ 1  scan0126
Improvements and alternatives for Phantom III big end bearings and connecting rods.2nd Feb 1937Box 93 \ 1  scan0127
On the design considerations and trade-offs for using articulated rods on the Phantom III engine.13th Feb 1937Box 93 \ 1  scan0128
Request to manufacture experimental Phantom III connecting rods to test an alternative to chromium plating.24th Feb 1937Box 93 \ 1  scan0129
Reporting the failure of Phantom III forked connecting rods and requesting a design modification.7th May 1937Box 93 \ 1  scan0130
The redesign and strengthening of Phantom III connecting rods following a failure.28th May 1937Box 93 \ 1  scan0131
Manufacturing modification to Phantom III connecting rods and establishing a new procedure for future changes.19th Jun 1937Box 93 \ 1  scan0132
Instructions for detailing a set of connecting rods with A.C.2 big end bushes for the Continental Phantom III car.28th Aug 1937Box 93 \ 1  scan0133
New drawings for forked connecting rods and bearing bushes for the Phantom III chassis.1st Sep 1937Box 93 \ 1  scan0134
Methods for fitting the Phantom III connecting rod big end.2nd Sep 1937Box 93 \ 1  scan0135
Instructions regarding alterations to Phantom III Chassis connecting rods using Halls' Alloy Bearing Bushes.2nd Sep 1937Box 93 \ 1  scan0136
Standardisation of parts for the Phantom III, regarding modified milling of connecting rod panels.19th Oct 1937Box 93 \ 1  scan0137
Cost estimate for new tools and a modification request to increase the life of milling cutters.18th Jan 1937Box 93 \ 1  scan0138
Internal request for a full cost analysis of Phantom III and Bentley connecting rods.31th Jan 1938Box 93 \ 1  scan0139
Instructions for an experiment concerning a Phantom III chassis connecting rod big end bush made from die-cast AC.9 material.19th May 1938Box 93 \ 1  scan0140
Modifications and material specifications for the Phantom III A.C.9 blade connecting rod big end bearing.9th Jan 1939Box 93 \ 1  scan0141
'Spectre' project, sending a drawing of the front engine suspension.19th Mar 1934Box 93 \ 1  scan0142
Drawing LeC.3839, detailing an alternative engine suspension for the 'Spectre' engine crankcase.20th Mar 1934Box 93 \ 1  scan0143
Requesting the production of aluminum blocks for the Spectre Engine Mounting.14th Sep 1934Box 93 \ 1  scan0144
The issue of a covering order to clear an invoice for four Rear Engine Rubbers.25th Sep 1934Box 93 \ 1  scan0145
Experimental modification to a Spectre Front Engine Mounting.25th Sep 1934Box 93 \ 1  scan0146
Alternative front engine mounting for the Spectre, referencing drawing LeC.4127.3rd Oct 1934Box 93 \ 1  scan0147
Adhesion problems with Spectre Engine Rubbers supplied by the Leyland & Birmingham Rubber Co.16th Oct 1934Box 93 \ 1  scan0148
Spectre engine suspension, referencing drawing N. Sch/4030.1st May 1934Box 93 \ 1  scan0149
Drawing LeC.4507 for a deeper rubber adapted to the Spectre front engine mounting.24th May 1935Box 93 \ 1  scan0150
Deeper rubber for front engine mounting on the Spectre Chassis, detailing three parts being issued in advance.29th May 1935Box 93 \ 1  scan0151
Letter to The British Tyre & Rubber Co. Ltd. requesting an urgent estimate for a mould to produce experimental rubbers.29th May 1935Box 93 \ 1  scan0152
Letter regarding a request for three sets of experimental Engine Mounting Housings with varying hardness.29th May 1935Box 93 \ 1  scan0153
Quotation letter from British Tyre & Rubber Co. Ltd. for engine mounting rubbers and the required mould.30th May 1935Box 93 \ 1  scan0154
Requesting the production of steel components for Spectre front engine mounting rubbers.31th May 1935Box 93 \ 1  scan0155
Production of new engine rubbers for Spectre, F.87439 and requesting an order.6th Jun 1935Box 93 \ 1  scan0156
Sample of a front engine mounting rubber and its quality.6th Jun 1935Box 93 \ 1  scan0157
Urgent memo detailing the despatch of steel casings and distance pieces to the British Tyre & Rubber Co. Ltd.6th Jun 1935Box 93 \ 1  scan0158
Letter to a supplier requesting the urgent production of engine mounting rubbers.6th Jun 1935Box 93 \ 1  scan0159
Secret memo regarding a modification for the Spectre engine mounting to correct distortion and reduced load capacity.6th Jun 1935Box 93 \ 1  scan0160
Secret memorandum regarding instructions for improved Spectre engine mountings.7th Jun 1935Box 93 \ 1  scan0161
Fitting options for a Spectre engine mounting.12th Jun 1935Box 93 \ 1  scan0162


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙