Confidential cover note for a memo from Kennington detailing his past development work at General Motors.22th Dec 1938Box 148 \ 2  scan0093
Design and performance details of an 8-cylinder radial 2-cycle supercharged petrol engine developed by General Motors.28th Nov 1938Box 148 \ 2  scan0094
Description of a pair of cylinders with inlet pistons, detailing their operation and construction.28th Nov 1938Box 148 \ 2  scan0095
Technical description of an engine's crankshaft, connecting rods, and supercharger components.28th Nov 1938Box 148 \ 2  scan0096
Report page detailing tests on blowers, carburetter and ignition systems, and engine performance metrics like horsepower and BMEP.28th Nov 1938Box 148 \ 2  scan0097
Report page detailing engine performance characteristics including torque, fuel consumption, idling, smoothness, and starting.28th Nov 1938Box 148 \ 2  scan0098
The reliability and quietness of an experimental engine.28th Nov 1938Box 148 \ 2  scan0099
The methods of instrumentation and development for a two-cycle engine, focusing on pressure wave analysis.28th Nov 1938Box 148 \ 2  scan0100
Page detailing engine development, covering issues with detonation, airflow tests, mixture distribution, and gas analysis results.28th Nov 1938Box 148 \ 2  scan0101
Report page discussing air consumption measurement methods with a disclaimer on the data's age.28th Nov 1938Box 148 \ 2  scan0102
Indicator cards comparing engine pressures with and without detonation.28th Nov 1938Box 148 \ 2  scan0103
Blueprint sketch showing the approximate layout of a supercharged engine.31th Dec 1938Box 148 \ 2  scan0104
The tensile testing of Quadrant Holders, proposing a material change from Silver Bronze to Dixstampo.31th Dec 1938Box 148 \ 2  scan0105
Probable cost of the B.V. chassis and questioning the high factory overheads.10th Jan 1939Box 148 \ 2  scan0106
Querying the increased cost of R.A.D.13 linings.14th Jan 1939Box 148 \ 2  scan0107
Cost comparison document for various gearbox models, including material, labour, and burden costs.18th Jan 1939Box 148 \ 2  scan0108
Comparing the cost and features of various 4-speed gearboxes, including the B.50, Wraith, Snipe, and Mina boxes.19th Jan 1939Box 148 \ 2  scan0109
Production costs of Bentley and Wraith gearboxes in comparison to a Rover box.19th Jan 1939Box 148 \ 2  scan0110
Cost breakdown and comparison for servo parts for the Wraith 'B' Series and Bentley 50.23th Jan 1939Box 148 \ 2  scan0111
Test drive report and comparison of a 1939 12-cylinder Lagonda against a Bentley.30th Jan 1939Box 148 \ 2  scan0112
Comparative analysis of a Bentley and a Lagonda, focusing on refinement, gear noise, and gear change mechanisms.30th Jan 1939Box 148 \ 2  scan0113
Comparative review of a converted Bentley against a standard model and a 6-cylinder Lagonda.30th Jan 1939Box 148 \ 2  scan0114
Cost analysis and price comparison of clutches supplied by Borg & Beck Ltd.1st Feb 1939Box 148 \ 2  scan0115
Cost comparison and savings analysis for different clutch manufacturing features.1st Feb 1939Box 148 \ 2  scan0116
The price and feasibility of using a 'Long' type clutch on a Bentley V chassis.7th Feb 1939Box 148 \ 2  scan0117
Warning testers about high charges from supplier Metalastik Ltd. for experimental rubber-to-metal parts and suggesting alternatives.7th Feb 1939Box 148 \ 2  scan0118
Costs and specifications for clutches supplied by Borg & Beck Ltd., focusing on standardisation for Bentley models.8th Feb 1939Box 148 \ 2  scan0119
Technical review of clutch finishing, machining, balancing, and component selection.8th Feb 1939Box 148 \ 2  scan0120
The special finish of a pressure plate and its cost.8th Feb 1939Box 148 \ 2  scan0121
Outlining the progress of the Rationalised Programme and suggesting further areas for review and simplification.14th Feb 1939Box 148 \ 2  scan0122
List of points concerning chassis re-design and manufacturing development.14th Feb 1939Box 148 \ 2  scan0123
The sale of Experimental Phantom III No. 12 Unit to Marstons for radiator development tests.14th Feb 1939Box 148 \ 2  scan0124
Experimental patterns for producing castings in both aluminium and cast iron.20th Feb 1939Box 148 \ 2  scan0125
The costs and reasons for experimental scrap due to chassis design changes and incorrect drawings.21th Feb 1939Box 148 \ 2  scan0126
Summary of a conversation about a rationalising programme for standardising car components.22th Feb 1939Box 148 \ 2  scan0127
Clarifying the status of parts supplied for investigation without a covering memo.2nd Mar 1939Box 148 \ 2  scan0128
Cost comparison for Whitemetal bearings and Inlet valves from different suppliers.8th Mar 1939Box 148 \ 2  scan0129
Summary of annual cost savings on car parts prior to a takeover.8th Mar 1939Box 148 \ 2  scan0130
The 'Rationalising Programme' and simplification of components.9th Mar 1939Box 148 \ 2  scan0131
Acknowledging arrangements made in a previous communication to facilitate experiments.9th Mar 1939Box 148 \ 2  scan0132
The cost and details of experimental scrap due to incorrect chassis drawings for a four-week period.10th Mar 1939Box 148 \ 2  scan0133
1938 and 1939 chassis development budgets, with a breakdown of historical costs and units produced.14th Mar 1939Box 148 \ 2  scan0134
Financial credits for chassis disposals and transfers, with a recommendation for the 1939 budget.16th Mar 1939Box 148 \ 2  scan0135
Note concerning the conversion of an 'M' Series Bentley chassis to suit a Paulin Streamline body.16th Mar 1939Box 148 \ 2  scan0136
Outlining the 'Rationalised Chassis Programme' for Rolls-Royce and Bentley cars.17th Mar 1939Box 148 \ 2  scan0137
Confirming the compatibility of a radiator shirt with B.50 radiator 'internals'.17th Mar 1939Box 148 \ 2  scan0138
Cost comparison memo for a Delco-Remy Distributor and an estimated figure for part DW.426 R.R.17th Mar 1939Box 148 \ 2  scan0139
Cost and weight comparison between the Cub and Wraith engines.17th Mar 1939Box 148 \ 2  scan0140
Cost comparison for Leyland and Wraith gearboxes, detailing weight, material, and labour costs.17th Mar 1939Box 148 \ 2  scan0141
Request to credit the experimental chassis test department for 6 special raised crown pistons for Chassis 74 M.R.21th Mar 1939Box 148 \ 2  scan0142
Financial summary detailing costs for Sanderson & Holmes and Park Ward, including various chassis models and parts.27th Mar 1939Box 148 \ 2  scan0143
Allocation of designs for rationalised programmes and the difficulty in setting completion dates.27th Mar 1939Box 148 \ 2  scan0144
Allocating work for the front suspension, noting its connection to the brakes.27th Mar 1939Box 148 \ 2  scan0145
The design and production timeline for radiators on 'Ripple', 'B.50-RR', and 'Cresta' models.27th Mar 1939Box 148 \ 2  scan0146
Design and scheduling of 8 1/2' and 10' rear axle ring gears.27th Mar 1939Box 148 \ 2  scan0147
Design policy and component choices for frames, springs, and roll rods.27th Mar 1939Box 148 \ 2  scan0148
Feasibility of fitting a rear roll rod to a 'Corniche' model.27th Mar 1939Box 148 \ 2  scan0149
Expressing frustration about delayed modifications for the B. 60 and Wraith models and ignored test results.5th Apr 1939Box 148 \ 2  scan0150
Cost reduction measures for the petrol filler and clutch operation.6th Apr 1939Box 148 \ 2  scan0151
Summary comparing the R.R. and Delco distributors for the Wraith model, outlining faults and factors against the R.R. unit.15th Apr 1939Box 148 \ 2  scan0152
Decision to fit an R.R. distributor to the Wraith C series and comparing it to the Delco distributor.15th Apr 1939Box 148 \ 2  scan0153
Cost comparison for a Wraith pedal gap plate made from Aluminium versus Bakelite.18th Apr 1939Box 148 \ 2  scan0154
Review of component costs for a rationalised programme, focusing on the Bentley V chassis and potential savings.18th Apr 1939Box 148 \ 2  scan0155
Internal memorandum detailing potential cost reductions and simplifications for various vehicle components.20th Dec 1938Box 148 \ 2  scan0156
Review of vehicle component designs and costs, suggesting simplifications for parts such as the clutch, pedals, and engine mounting.20th Dec 1938Box 148 \ 2  scan0157
Cost analysis and saving suggestions for various vehicle components including shock absorbers, electricals and brackets.20th Dec 1938Box 148 \ 2  scan0158
Required refinements such as lighting, steering wheels, and lubrication systems.1st Oct 1938Box 148 \ 2  scan0159
Comparative analysis of gearbox material costs for the B.50 and Wraith models.1st Oct 1938Box 148 \ 2  scan0160
Confirming a conversation about a loose pendulum lever found at Brooklands and ensuring all future danger points will be signed for.20th Apr 1939Box 148 \ 2  scan0161
Secret internal memo discussing the cost of components for a Rationalised Programme and defending design choices against cost criticisms.26th Apr 1939Box 148 \ 2  scan0162
Cost and weight reduction for rationalised parts following a 50,000-mile road test.26th Apr 1939Box 148 \ 2  scan0163
Costs for rear axle pinion bearings.27th Apr 1939Box 148 \ 2  scan0164
Comparison of gearbox components and costs between Rolls Royce and Vauxhall models.27th Apr 1939Box 148 \ 2  scan0165
Comparison of the number of parts in B.V. and Vauxhall gearboxes.27th Apr 1939Box 148 \ 2  scan0166
Table quantifying units included by ROY/LES but not provided by Vauxhall.27th Apr 1939Box 148 \ 2  scan0167
Cost breakdown sheet for gearbox components of the 25/30-HP (R.2. Series) and Wraith 'A' models.9th May 1939Box 148 \ 2  scan0168
Cost analysis sheet comparing parts for 'Wraith A' and 'Wraith C' models.28th Apr 1939Box 148 \ 2  scan0169
Requesting a cost tabulation for chassis servicing alternatives related to cylinder bore wear.28th Apr 1939Box 148 \ 2  scan0170
The cost and reasons for experimental scrap parts due to chassis design changes.1st May 1939Box 148 \ 2  scan0171
Rejecting a high-cost estimate for putting a 6-cylinder engine on an existing test bed.2nd May 1939Box 148 \ 2  scan0172
Disapproval of a millwright's estimate and the consideration of sub-contracting.4th May 1939Box 148 \ 2  scan0173
Confirming a discussion about a rationalised chassis production programme, requesting cost submissions based on different production scenarios.9th May 1939Box 148 \ 2  scan0174
The cost and reasons for experimental scrap due to chassis design changes.5th May 1939Box 148 \ 2  scan0175
Blueprints for a rationalised chassis programme, including the 6-cylinder Wraith replacement.16th May 1939Box 148 \ 2  scan0176
Improvements and listing faults found during the completion of new chassis.24th May 1939Box 148 \ 2  scan0177
Proposal to create a standardized list of danger points for inspection on new cars.24th May 1939Box 148 \ 2  scan0178
Improvements in chassis manufacturing and a list of common faults found on a specific chassis.24th May 1939Box 148 \ 2  scan0179
Suggestion to create a standardised list of danger points for inspection on new cars.24th May 1939Box 148 \ 2  scan0180
Outlining suggestions for the dimensions of a new car model under the 'Junior Rationalised Programme'.27th May 1939Box 148 \ 2  scan0181
Outlining the priority order and status of various cars scheduled for standardisation tests in France.27th May 1939Box 148 \ 2  scan0182
Completion of a new timing case and casting, and the status of the RIPPLE project.27th May 1939Box 148 \ 2  scan0183
Request for a cost analysis on a connecting rod and crankshaft for Bentley V or Wraith III models.31th May 1939Box 148 \ 2  scan0184
Letter from S. Smith & Sons regarding a speedometer quotation and arranging a meeting.2nd Jun 1939Box 148 \ 2  scan0185
Letter from S. Smith & Sons (Motor Accessories) Ltd. offering service assurances.2nd Jun 1939Box 148 \ 2  scan0186
Notes by 'Oy' on the rationalization and future design of Bentley cars, comparing them with Detroit models.6th Jun 1939Box 148 \ 2  scan0187
Design memorandum discussing vehicle dimensions and styling principles, comparing American and English practices.8th Jun 1939Box 148 \ 2  scan0188
Outlining a proposed road testing program for cars with rationalised parts in France.8th Jun 1939Box 148 \ 2  scan0189
Testing a 6-cylinder engine in a Silver Dawn chassis and preparations for the 1940 Motor Show.8th Jun 1939Box 148 \ 2  scan0190
Outlining the estimated factory labour costs for four operations on a Wraith Cylinder Liner.9th Jun 1939Box 148 \ 2  scan0191
Manufacturing operations list for a Phosphor Chrome Cylinder Liner.8th Jun 1939Box 148 \ 2  scan0192


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙