Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 800 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Chart detailing switchbox arrangements for various vehicle models.1st Mar 1929Box 65 \ 2  scan0027
Cover note for the Specification of Production Inspection & Test for the S.S. Switchbox for R.R. Chassis, Version 4.26th Apr 1929Box 65 \ 2  scan0028
Specification for production inspection and testing of a switchbox for the R.R. chassis.12th Mar 1929Box 65 \ 2  scan0029
Set of electrical testing procedures for a switch or distribution box.28th May 1929Box 65 \ 2  scan0030
Instructions for correcting interchanged magneto wires on a 23 Ex Switchbox.28th May 1929Box 65 \ 2  scan0031
Unsatisfactory diagrams and instructions for the S.S. Switchbox magneto switching system, which could lead to wiring errors and electric shocks.28th May 1929Box 65 \ 2  scan0032
Confirming the possibility of receiving a minor shock from the magneto switch knob.28th May 1929Box 65 \ 2  scan0033
Technical memo on the arrangements of the S.S. switchbox, comparing standard, modified, and original versions.7th Jul 1929Box 65 \ 2  scan0034
Experimental auto switch and charge control systems for chassis 20-EX.9th Sep 1929Box 65 \ 2  scan0035
Clarifying the specifications for switchboxes used with the auto charge control switch.9th Sep 1929Box 65 \ 2  scan0036
Clarifying the practice of issuing instructions for different sections to the Experimental Department.19th Sep 1929Box 65 \ 2  scan0037
Requesting to include a switchbox with extended armature contact on chassis 18-EX.20th Nov 1929Box 65 \ 2  scan0038
The fitment of a switchbox with an extended armature contact to a 40/50 Chassis 18-EX.22th Nov 1929Box 65 \ 2  scan0039
The design and examination of the Phantom II switchbox, distribution board, and fuses.30th Nov 1929Box 65 \ 2  scan0040
The condition of a switchbox after extended use and a discussion on reconsidering its design for an experimental car.1st Nov 1929Box 65 \ 2  scan0041
Recommendation to adopt the Phantom II standard switchbox and alter the fuse positions and numbering accordingly.30th Nov 1929Box 65 \ 2  scan0042
Instruction of a second S.S. Switchbox with extended armature contact and distribution board for an experimental chassis.12th Dec 1929Box 65 \ 2  scan0043
Potential for a driver to get an electric shock from the ignition switch on the Phantom II.1st Dec 1929Box 65 \ 2  scan0044
Cause and solutions for an electric shock from the auxiliary magneto switch on a Phantom II.9th Dec 1929Box 65 \ 2  scan0045
Two arrangements for magneto switching, considering alterations to eliminate an electric shock.9th Dec 1929Box 65 \ 2  scan0046
Technical proposal for modifying the reduced charge switching scheme by interconnecting it with the headlamp switch.8th Jan 1930Box 65 \ 2  scan0047
New switchbox design, focusing on the armature contact, terminal numbering, and lamp switching.18th Jan 1930Box 65 \ 2  scan0048
The disadvantages and proposed elimination of an auxiliary magneto switch.18th Jan 1930Box 65 \ 2  scan0049
Two proposals for modifying the charge switching system.25th Jan 1930Box 65 \ 2  scan0050
Proposed reduced charge switching system, detailing its operation and potential issues with the cut-out shunt coil.30th Jan 1930Box 65 \ 2  scan0051
Hand-drawn diagram illustrating four different electrical circuit configurations.30th Jan 1930Box 65 \ 2  scan0052
Proposed electrical wiring modifications involving a switchbox, distribution box, and field resistance.30th Jan 1930Box 65 \ 2  scan0053
Note on the convention for indicating windings and a reference to a scheme for utilising higher output generators.30th Jan 1930Box 65 \ 2  scan0054
Instruction to remove a green lamp unit for a 10,000-mile test and retain the switchbox for standardisation.7th Feb 1930Box 65 \ 2  scan0055
Proposals for reduced charge switching and the implications for the auxiliary magneto switch.8th Feb 1930Box 65 \ 2  scan0056
Switchbox and distribution box for the 10,000-mile chassis 23-EX.25th Feb 1930Box 65 \ 2  scan0057
The modification of a switchbox for a 40-50 HP chassis, including lists of new and standard parts required.17th Mar 1930Box 65 \ 2  scan0058
The switchbox and cutout arrangement for a dynamo charging circuit.11th Nov 1930Box 65 \ 2  scan0059
Analysis of different electrical cutout and switchbox arrangements to mitigate sparking and component failure.28th Nov 1929Box 65 \ 2  scan0060
Experimental record sheet for a switchbox with an armature contact in the ignition position.28th Nov 1929Box 65 \ 2  scan0061
Instruction sheet regarding a switchbox with an armature contact, its condition and replacement.10th Dec 1930Box 65 \ 2  scan0062
Cross-reference note for further information on the 40/50 switchbox.31th Dec 1930Box 65 \ 2  scan0063
Reference note for previous correspondence concerning the 40/50 Distribution Board.5th Dec 1923Box 65 \ 2  scan0064
Testing mileage of 40 S.W.G. field fuses for Goshawk & E.A.C. electrical systems.5th Dec 1923Box 65 \ 2  scan0065
Fusing for the electrical circuits of the silent starter gear.3rd Jul 1934Box 65 \ 2  scan0066
Accompanying a blueprint for a Distribution Board and Cut-Out, detailing differences from the standard 20 HP type.14th Sep 1924Box 65 \ 2  scan0067
Instructions regarding the testing and availability of an EAC Distribution Box and Cut-out.6th Jan 1925Box 65 \ 2  scan0068
Inspection and adjustment report for an EAC Distribution Board, including operating figures.5th Feb 1925Box 65 \ 2  scan0069
Confirming that a distribution board and cutout has passed testing and is ready for use on the chassis.6th Jan 1925Box 65 \ 2  scan0070
Cover letter for the specification of Production Inspection & Test of an EAC distribution board and cutout.23th Jan 1925Box 65 \ 2  scan0071
Specification for the production inspection, adjustment, and testing of a distribution board and cutout.21th Jan 1925Box 65 \ 2  scan0072
Testing procedures for a dynamo, detailing voltage, amperage, and cutout contact operations.21th Jan 1925Box 65 \ 2  scan0073
Wiring diagram for the connections for an EAC distribution board and cutout test.23th Feb 1925Box 65 \ 2  scan0074
Dynamo fuse information and cutout specifications.23th Feb 1925Box 65 \ 2  scan0075
Troubleshooting sticking cutout contact points and requesting inspections and corrections.15th Apr 1925Box 65 \ 2  scan0076
Requesting the replacement of a faulty distribution box on car 98-NK.8th Apr 1925Box 65 \ 2  scan0077
Issue with the rubbing action of cutout contact points in a distribution box.16th Apr 1925Box 65 \ 2  scan0078
Requesting inspection and alteration of cutout contact points on various experimental chassis.14th May 1925Box 65 \ 2  scan0079
Additional note on the production inspection and test specification for the distribution board and cutout, applicable to the 20 HP and EAC chassis.14th May 1925Box 65 \ 2  scan0080
Additional note on the production inspection and testing specification for the distribution board and cutout, focusing on contact point alignment.14th May 1925Box 65 \ 2  scan0081
Chassis 93-NK after 15,447 miles in France, focusing on electrical fittings.20th May 1925Box 65 \ 2  scan0082
Repeated failure of an emergency main fuse on an EAC trials car due to an electrical earth.21th May 1925Box 65 \ 2  scan0083
Instructing a design alteration for the EAC Distribution Box contact points.25th May 1925Box 65 \ 2  scan0084
Problem with an overly strong spring in a distribution box cut-out and proposing spring steel as an alternative material.27th May 1925Box 65 \ 2  scan0085
Replacement and allocation of three non-standard cutout contact points for specific cars.29th May 1925Box 65 \ 2  scan0086
The experimental reduction of cutout contact breaker spring necks on various chassis.29th May 1925Box 65 \ 2  scan0087
Proposing a design change to make the supporting column of the fixed cutout contact point more rigid.1st Jun 1925Box 65 \ 2  scan0088
Intended rubbing action of the spring in a distribution box cutout.3rd Jun 1925Box 65 \ 2  scan0089
Observations on spring arrangements and the necessity for a rigid support for the fixed contact.3rd Jun 1925Box 65 \ 2  scan0090
Suggestions by 'RG' for the improvement of the electrical system.11th Aug 1925Box 65 \ 2  scan0091
Inspection report on a distribution box with a cracked cover, dust ingress and worn contact points.14th Aug 1925Box 65 \ 2  scan0092
Modifications to 'V' Series electrical equipment, specifically cones and a dynamo commutator end cover.4th Aug 1925Box 65 \ 2  scan0093
Modification of two EAC distribution boards to a new experimental standard for dynamo tests.8th Feb 1926Box 65 \ 2  scan0094
Reverting to a modified shutter control design for the 'X' Series and altering dashboard components.14th Jul 1925Box 65 \ 2  scan0095
Instructing a change to the Phantom's cutout mechanism to match the simpler 20 HP design.1st Jun 1926Box 65 \ 2  scan0096
The performance of modified distribution box thumbscrews with milled beads.17th Jul 1926Box 65 \ 2  scan0097
Typed memo regarding an arrangement for an improved scheme to be submitted to keep a job moving.19th Jul 1926Box 65 \ 2  scan0098
Specification for production inspection, adjustment, and testing of the distribution board and cutout.19th Oct 1926Box 65 \ 2  scan0099
Test procedures for a dynamo cutout, detailing voltage, current, and resistance specifications.19th Oct 1926Box 65 \ 2  scan0100
Wiring diagram for a 40/50 distribution board and cutout test.22th Sep 1926Box 65 \ 2  scan0101
Standardisation document for securing a distribution box cover with thumb screws.22th Sep 1926Box 65 \ 2  scan0102
Comparison of windings for Derby & Springfield cutouts.5th Oct 1927Box 65 \ 2  scan0103
Instruction for an experimental electrical alteration to the distribution box on chassis 11-G3 and 14-EX.8th Oct 1927Box 65 \ 2  scan0104
Modified experimental connection for the shunt coil on the distribution box.8th Oct 1927Box 65 \ 2  scan0105
Page discussing a change of connection on a chassis and its effect on the field fuse safety margin.23th Jan 1928Box 65 \ 2  scan0106
Forwarding a self-explanatory note from Mr. Allen regarding chassis distribution board wires.23th Jan 1928Box 65 \ 2  scan0107
Examination of wires 6 and 8 on the chassis distribution board for potential failure due to cramped spacing and handling by coachbuilders.17th Jan 1928Box 65 \ 2  scan0108
The distribution board and cutout for a 15-EX Phantom chassis after 9000 miles.7th Mar 1928Box 65 \ 2  scan0109
Report from France regarding an electrical cutout failure on chassis 14.EX, with a handwritten follow-up asking for more details.12th Apr 1928Box 65 \ 2  scan0110
Covering memo for a set of notes regarding the burning of cutout and dynamo charging switch contacts.16th May 1928Box 65 \ 2  scan0111
Analysis of the burning of cutout and dynamo switch contacts based on different circuit configurations and switching sequences.16th May 1928Box 65 \ 2  scan0112
Continuation of a report analyzing different electrical cutout and charging switch configurations to minimize sparking.16th May 1928Box 65 \ 2  scan0113
Optimal wiring connection for a shunt coil in a distribution box based on experimental results.17th May 1928Box 65 \ 2  scan0114
Cover note for attached notes regarding the burning of cutout and dynamo charging switch contacts.17th May 1928Box 65 \ 2  scan0115
Electrical experimental record sheet for a Cut-Out Shunt connected to Terminal C.11th Jun 1928Box 65 \ 2  scan0116
Requesting a drawing of a distribution board, which is related to a battery charge indicator switch.29th Jun 1928Box 65 \ 2  scan0117
Revised and coloured Phantom wiring diagram for inclusion in the instruction book.29th Jun 1928Box 65 \ 2  scan0118
Correspondence regarding a blueprint for a battery charge indicator switch and layout issues on the instrument board.11th Jul 1928Box 65 \ 2  scan0119
Modifications to a Phantom wiring diagram, specifically the green light connection.16th Jul 1928Box 65 \ 2  scan0120
Corrections to a diagram for an accumulator switch and green light scheme, including fuse placement.20th Jul 1928Box 65 \ 2  scan0121
Modifications to a distribution board fitted with a green lamp switch.26th Jul 1928Box 65 \ 2  scan0122
Alterations to the Phantom Green Light Scheme wiring.1st Sep 1928Box 65 \ 2  scan0123
Proposing to delay a wiring change for the cutout connection until a new distribution board is ready.6th Sep 1928Box 65 \ 2  scan0124
Revised Phantom wiring diagram, requesting old prints be scrapped.15th Sep 1928Box 65 \ 2  scan0125
Minor alterations and a list of blueprints for the S.S. Chassis Distribution Board, Cutout, and Green Lamp Switch.15th Sep 1928Box 65 \ 2  scan0126


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble