Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 989 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
From Mr. Royce's office requesting a thermometer to test the 40/50 HP car's running temperature.29th Mar 1919Box 78 \ 1  scan0140
Recommendation to fit a water temperature recording instrument from the Cambridge Scientific Co. to the 40/50 chassis.31th Mar 1919Box 78 \ 1  scan0141
Development of an instrument board thermometer and associated radiator louvres to control water temperature.3rd Apr 1919Box 78 \ 1  scan0142
Circulating standardisation sheets for a wiring tube and a capillary tube thermometer for review and sign-off.7th Apr 1919Box 78 \ 1  scan0143
Standardisation of a capillary tube thermometer for recording radiator water temperature on the dashboard.7th Apr 1919Box 78 \ 1  scan0144
Recommendation to fit a thermometer to record the water temperature on 40/50 chassis.31th Mar 1919Box 78 \ 1  scan0145
Specification sheet detailing the weight of a capillary tube thermometer.7th Apr 1919Box 78 \ 1  scan0146
Requesting review and signature for a standardisation sheet on a capillary tube thermometer experiment.16th Apr 1919Box 78 \ 1  scan0147
Distributing copies of standardisation sheets for various parts, including items for the 40/50 Chassis.25th Apr 1919Box 78 \ 1  scan0148
Instructions from Mr. Royce regarding thermostats, thermometers, pressure feed pumps, and speedometers.1st May 1919Box 78 \ 1  scan0149
Different mechanisms for operating radiator louvres.13th May 1919Box 78 \ 1  scan0150
Design and operation of radiator shutters and thermostats, comparing different schemes.29th May 1919Box 78 \ 1  scan0151
Extract discussing the design and implementation of thermometer connections on an engine.14th May 1919Box 78 \ 1  scan0152
Arguing for the standardization of the capillary tube thermometer, detailing its benefits for the driver.28th May 1919Box 78 \ 1  scan0153
Radiator temperature control options for winter, considering blanking plates and alternative shutter designs.28th May 1919Box 78 \ 1  scan0154
Discussion of radiator cooling alternatives and a request for permission to fit thermometers.28th May 1919Box 78 \ 1  scan0155
Fitting of capillary tube thermometers and the design of radiator shutters for the 40/50 HP chassis.28th May 1919Box 78 \ 1  scan0156
Unsuitability of a roll-top desk blind for thermostat control and proposing a hand-operated shutter.28th May 1919Box 78 \ 1  scan0157
Control of water temperature on cars using radiator shutters and thermostat controls.29th May 1919Box 78 \ 1  scan0158
Ordering thermometer gauges from the Cambridge Scientific Instrument Co.30th May 1919Box 78 \ 1  scan0159
Mr. Royce's instructions for fitting a temperature indicator on a 40/50 HP chassis.30th May 1919Box 78 \ 1  scan0160
Design of radiator shutters and the standardisation of a capillary tube thermometer for the 40/50 HP chassis.30th May 1919Box 78 \ 1  scan0161
Standardization of Capillary Tube Thermometer X.3565, noting Mr. Johnson's agreement and ongoing discussion with Mr. Royce.31th May 1919Box 78 \ 1  scan0162
With a sketch describing the thermostat arrangement and operation on a Packard car.2nd Jun 1919Box 78 \ 1  scan0163
Technical necessity of fitting louvres to radiators for engine temperature control in cold weather.2nd Jun 1919Box 78 \ 1  scan0164
Methods for controlling radiator water temperature, including thermometers and physical radiator blockages.1st Jun 1919Box 78 \ 1  scan0165
Accompanying prints for the 40/50 chassis, detailing a view of the scuttle dash and ignition wire fittings.1st Jun 1919Box 78 \ 1  scan0166
Standardisation sheet for a capillary tube thermometer.6th Jun 1919Box 78 \ 1  scan0167
Cover memo for a standardisation sheet regarding a capillary tube thermometer.9th Jun 1919Box 78 \ 1  scan0168
Testing a radiator bypass pipe for the 40/50 chassis to manage water temperature.10th Jun 1919Box 78 \ 1  scan0169
Radiator temperature control modifications and experiences with a blind and thermometer.10th Jun 1919Box 78 \ 1  scan0170
Design and production of a new radiator thermometer.11th Jun 1919Box 78 \ 1  scan0171
Stopping work on a thermometer fitting for water jackets pending further information.12th Jun 1919Box 78 \ 1  scan0172
Design and placement of a temperature recorder for the 40/50 HP chassis.22th Jul 1919Box 78 \ 1  scan0173
Unsatisfactory positioning of a thermometer on the dashboard due to visibility and damage concerns.25th Jul 1919Box 78 \ 1  scan0174
Clarification of instructions for fitting the temperature indicator on the 40/50 HP chassis.29th Jul 1919Box 78 \ 1  scan0175
Urgent increase in parts production for the 40/50 chassis.30th Jul 1919Box 78 \ 1  scan0176
Confirmation of handing over blueprints for a Rosette part for a 40/50 chassis water temperature thermometer.1st Aug 1919Box 78 \ 1  scan0177
Required length of the capillary tube for the temperature indicator on a 40/50 chassis.1st Aug 1919Box 78 \ 1  scan0178
Blueprints for production changes to the temperature indicator fittings on the 40/50 chassis.1st Aug 1919Box 78 \ 1  scan0179
Enclosing two blueprints for the arrangement of temperature indicator fittings for the 40/50 chassis.14th Aug 1919Box 78 \ 1  scan0180
Arrangement and standardization of the temperature indicator and other dashboard instruments.21th Aug 1919Box 78 \ 1  scan0181
Layout of dashboard components and securing of electrical conductors.21th Aug 1919Box 78 \ 1  scan0182
Extract detailing new parts fitted to the 40/50 chassis, specifically the standardisation of a thermometer.27th Aug 1919Box 78 \ 1  scan0183
Notice about the standardized method of fixing a thermometer to LeC.1121.7th Oct 1919Box 78 \ 1  scan0184
Accompanying blueprints for 40/50 chassis water thermometer connection parts for the 10,000-mile car.10th Oct 1919Box 78 \ 1  scan0185
Status report on finished experimental work and modifications.10th Oct 1919Box 78 \ 1  scan0186
Failure of a thermometer tube due to improper handling and suggesting design modifications to prevent it.26th Apr 1917Box 78 \ 1  scan0187
Failure of thermometer fixings in the engine top water pipe and seeking solutions.18th Nov 1919Box 78 \ 1  scan0188
Modifications and issues for Car 1.EX, including the clutch, wiring, and thermometer fitting.8th Dec 1919Box 78 \ 1  scan0189
Clarifying that an issue with a Thermometer mounting on car 1.EX is due to using an old dashboard, not a design error.1st Dec 1919Box 78 \ 1  scan0190
Thermostats and crankchamber breather fumes on the 40/50 HP chassis.4th Feb 1920Box 78 \ 1  scan0191
Failure of thermometers on the 40/50 HP chassis, with vibration suspected as the cause.26th Feb 1920Box 78 \ 1  scan0192
American chassis parts, specifically a review and recommendation for the Foxboro' Thermometer.16th Mar 1920Box 78 \ 1  scan0193
Continued note on fitting and testing a thermostat control scheme.16th Mar 1920Box 78 \ 1  scan0194
Alternative quotation for fitting thermometers on pre-war chassis for customers.1st Mar 1920Box 78 \ 1  scan0195
Requesting a reply regarding the fitting of thermometers to a customer's Pre-War chassis.9th Apr 1920Box 78 \ 1  scan0196
Customer modifications to the up-takes water pipe to suit a thermometer.9th Apr 1920Box 78 \ 1  scan0197
Modification to the thermometer connection on the water uptake in a cylinder.1st Jun 1920Box 78 \ 1  scan0198
Notes on the redesign and positioning of the instrument board for chassis 6.EX.17th Jul 1920Box 78 \ 1  scan0199
The supply of thermometers and thermostats for the chassis, discussing cancellations and potential scrapping.23th Jul 1920Box 78 \ 1  scan0200
The cancellation of thermometer fittings following the decision to make the thermostat standard.4th Aug 1920Box 78 \ 1  scan0201
Confirming that when thermostats are fitted, thermometers are not to be a standard fitting to avoid extra complication.9th Sep 1920Box 78 \ 1  scan0202
Confirmation of a telegram instructing that thermometers are not to be a standard fitting when thermostats are fitted.3rd Sep 1920Box 78 \ 1  scan0203
Confirming no action is required regarding the removal of the thermometer when the thermostat is standardized.6th Sep 1920Box 78 \ 1  scan0204
The provision for fitting thermometers to thermostat engines.21th Sep 1920Box 78 \ 1  scan0205
The issues and recommendations regarding fitting thermometers to engines that are also fitted with thermostats.22th Sep 1920Box 78 \ 1  scan0206
Failures of thermometers fitted to the chassis instrument board.10th Feb 1921Box 78 \ 1  scan0207
Engine overheating, detonation warnings, and cooling system performance in 40/50 and Goshawk models.30th May 1922Box 78 \ 1  scan0208
Letter from S.H. Morden & Co Ltd proposing their Radiator Temperature Indicator.20th Jul 1922Box 78 \ 1  scan0209
Letter from S. H. Morden & Co Ltd proposing an instrument for indicating water temperature in radiators.27th Jul 1922Box 78 \ 1  scan0210
Advertising leaflet for a 'Thermomomanometre' radiator temperature indicator.27th Jul 1922Box 78 \ 1  scan0211
Leaflet explaining ten reasons to install a radiator temperature indicator.10th Aug 1923Box 78 \ 1  scan0212
Thermometer tubes, forwarding an attached copy from Springfield.10th Aug 1923Box 78 \ 1  scan0213
Proposal for a new shield for thermometer tubes to replace the existing, problematic split shield.31th Jul 1923Box 78 \ 1  scan0214
Covering memo regarding an attached document about thermometer tubes received from Springfield.10th Aug 1923Box 78 \ 1  scan0215
Letter regarding a proposed new shield for a thermometer tube to replace the existing split shield.31th Jul 1925Box 78 \ 1  scan0216
Blueprint for a shield for a thermometer tube for the 40/50 model.20th Jul 1923Box 78 \ 1  scan0217
The supplier, catalogue number, and price for a thermometer that reads to 1/5th degrees centigrade.28th Aug 1923Box 78 \ 1  scan0218
Internal order request for a centigrade thermometer and two wooden cases.1st Aug 1923Box 78 \ 1  scan0219
Request to obtain a thermometer from W. & J. George Ltd., confirming the need for an additional unit.9th Sep 1923Box 78 \ 1  scan0220
Querying a potential duplicate order for a thermometer from W. & J. George Ltd.5th Sep 1923Box 78 \ 1  scan0221
Standardisation of the Thermometer Tube Shield.4th Oct 1923Box 78 \ 1  scan0222
Laboratory comparison of readings from a Mercury Thermometer and an Ether Thermometer for a Smith and Yates radiator thermometer.20th Mar 1925Box 78 \ 1  scan0223
Secret memo detailing five proposed modifications to a thermometer and its related wiring for an EAC scheme.20th Mar 1925Box 78 \ 1  scan0224
Follow-up memo requesting an update on a Negretti & Zambra Radiator Thermometer under observation.11th May 1925Box 78 \ 1  scan0225
Requesting to find a missing Negretti & Zambra dashboard thermometer for examination.9th May 1925Box 78 \ 1  scan0226
Damaged Negretti & Zambra thermometer after a car accident in France.20th May 1925Box 78 \ 1  scan0227
Requesting the examination of two sample Radiator Thermometers from The Accurate Recording Instrument Company.20th Aug 1927Box 78 \ 1  scan0228
Brochure for A.R.I.C. radiator thermometers and other instruments for aircraft and motor dashboards.20th Aug 1927Box 78 \ 1  scan0229
Promotional leaflet for the A.R.I.C. distance reading dashboard fitting radiator thermometer.1st Aug 1927Box 78 \ 1  scan0230
Request to test two distance thermometers for accuracy and their ability to withstand boiling temperatures.1st Aug 1927Box 78 \ 1  scan0231
Laboratory report on the calibration of two A.R.I.C. distance thermometers.23th Aug 1927Box 78 \ 1  scan0232
The calibration and testing of A.R.I.C. thermometers, noting their inaccuracy.23th Aug 1927Box 78 \ 1  scan0233
The calibration of two A.R.I.C. distance thermometers.23th Aug 1927Box 78 \ 1  scan0234
Internal order request for measuring cylinders and thermometers from W. & J. George Ltd.29th Aug 1927Box 78 \ 1  scan0235
Different mechanical methods for operating external radiator louvres.13th May 1919Box 78 \ 1  scan0236
Thermostat arrangement of a Packard car, including operating temperatures and a sketch of the tube.1st Jun 1919Box 78 \ 1  scan0237
Use of standard larger size sylphons over new smaller diameter ones.30th Jun 1919Box 78 \ 1  scan0238
Enquiry with a sketch about the production of sylphon tubing for a 40/50 HP chassis.18th Sep 1919Box 78 \ 1  scan0239


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙