Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2315 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Trial of gauze filters for Phantom and 20HP models to address low-speed jet issues.12th Mar 1927West Wittering \ Q \ January1927-March1927  133
Questioning the necessity of front wheel brake squeak dampers and proposing an alternative design.13th Mar 1927West Wittering \ Q \ January1927-March1927  134
Design proposals for a rear shock damper.14th Mar 1927West Wittering \ Q \ January1927-March1927  135
Design modifications and testing of two proposed EAC. 8 radiator variants.17th Mar 1927West Wittering \ Q \ January1927-March1927  136
Spring load and coefficient of friction for a servo linkage.17th Mar 1927West Wittering \ Q \ January1927-March1927  137
Suggesting two ideas to improve steering geometry and reduce high and low speed wobbles.22th Mar 1927West Wittering \ Q \ January1927-March1927  138
Technical memorandum discussing various potential improvements and combinations for vehicle steering systems.22th Mar 1927West Wittering \ Q \ January1927-March1927  139
New bonnet lock and fastener, scheme 2372, for trial on the 20HP model.22th Mar 1927West Wittering \ Q \ January1927-March1927  140
Improved radiator and bonnet design for the 40/50 model to avoid a thick appearance.25th Mar 1927West Wittering \ Q \ January1927-March1927  141
Proposal to strengthen the 20HP step-irons by modifying existing dies to avoid scrapping them.25th Mar 1927West Wittering \ Q \ January1927-March1927  142
Reduction of sponginess in the EAC 7 brakes with suggestions for improvement.25th Mar 1927West Wittering \ Q \ January1927-March1927  143
Strengthened step-iron for the Phantom model and proposals for an extra step-iron on the short chassis.25th Mar 1927West Wittering \ Q \ January1927-March1927  144
Saloon Cab De Ville body for India, nearing completion at Hoopers, and the need for a chassis.26th Mar 1927West Wittering \ Q \ January1927-March1927  145
Alternative schemes for a charge indicator to save the battery and dynamo on 40/50 & 20HP models.29th Mar 1927West Wittering \ Q \ January1927-March1927  146
Design options for scraper rings for either car or aero engines.4th Apr 1927West Wittering \ Q \ January1927-March1927  147
Specifying the dimensions for the matrix tubes of a Phantom radiator.31th Mar 1927West Wittering \ Q \ January1927-March1927  148
Solutions for steering column vibrations on the 10-EX model by increasing the column diameter.2nd Jul 1927West Wittering \ Q \ July1927-September1927  Scan001
Deletion of rear shutters and bonnet louvres for the Phantom & Goshawk models.5th Jul 1927West Wittering \ Q \ July1927-September1927  Scan002
Frame for experimental car models EAC.10 and EAC.12, adapting parts from model EAC.7.8th Jul 1927West Wittering \ Q \ July1927-September1927  Scan003
Dispatch and requested completion of an incomplete chassis arrangement drawing for EAC. 7.8th Jul 1927West Wittering \ Q \ July1927-September1927  Scan004
Revised rear end for chassis EAC.7 and redirecting work priorities to EAC.10.8th Jul 1927West Wittering \ Q \ July1927-September1927  Scan005
The proposed layouts for schemes EAC 10 and 12, detailing the hypoid axle gear eccentricity.8th Jul 1927West Wittering \ Q \ July1927-September1927  Scan006
Modifications to the 20HP crankshaft, including an increased journal bearing diameter and a G.1. slipper flywheel.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan007
Outlining the features of a new experimental 20HP model.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan008
Phantom steering and radiator improvements, specifically for the 10-EX model.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan009
Improving the riding qualities of 40/50 and 20HP cars.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan010
Advocating for 19-inch wheels with 6-inch tyres on the 20HP model for aesthetic reasons.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan011
Proposal to improve road clearance on Phantom and 20HP models by modifying the exhaust and petrol tank sump.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan012
Design and production of Phantom wing stays and head-light fixings.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan013
Deletion of back bonnet shutters and the creation of a less expensive alternative.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan014
New scheme for Phantom exhaust pipes for chassis fitted with front axle control.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan015
Alterations and improvements to the 20HP starter mechanism.9th Jul 1927West Wittering \ Q \ July1927-September1927  Scan016
From 'R' to 'EFC' expressing frustration about a lack of comparative information on battery ignition systems.11th Jul 1927West Wittering \ Q \ July1927-September1927  Scan017
From 'R' to 'BJ' discussing the Blue Sports Phantom 10-EX model, its performance, marketing, and future engine development.11th Jul 1927West Wittering \ Q \ July1927-September1927  Scan018
Reminder to rig up the hydraulic damper in the steering system to a specific load and torque.7th Dec 1927West Wittering \ Q \ July1927-September1927  Scan019
Proposed improvement for the Phantom's rear spare wheel.12th Jul 1927West Wittering \ Q \ July1927-September1927  Scan020
Suggestions and modifications for improving the 20HP starter for reliability.12th Jul 1927West Wittering \ Q \ July1927-September1927  Scan021
Rebuilding the EAC.7 model chassis and troubleshooting issues with the starter motor solenoid.12th Jul 1927West Wittering \ Q \ July1927-September1927  Scan022
Proposed steering modifications for the Phantom model for trial.14th Jul 1927West Wittering \ Q \ July1927-September1927  Scan023
Second modification for a future clutch and spring setup on the 20HP BIJUR model.14th Jul 1927West Wittering \ Q \ July1927-September1927  Scan024
Increase to the automatic ignition advance on the 20HP model to reduce detonation.14th Jul 1927West Wittering \ Q \ July1927-September1927  Scan025
Status and queries about grouped instruments for new 40/50 and 20HP models.14th Jul 1927West Wittering \ Q \ July1927-September1927  Scan026
Replying to a telegram, confirming the decision to keep a car and wait until coachbuilder Hoopers has finished.15th Jul 1927West Wittering \ Q \ July1927-September1927  Scan027
Proposing modifications to lower the new 20HP chassis by altering the side channels.15th Jul 1927West Wittering \ Q \ July1927-September1927  Scan028
New India chassis frame, referencing schedule 2433 and an upcoming drawing for 'India 3. and 4'.16th Jul 1927West Wittering \ Q \ July1927-September1927  Scan029
Outlining steering modifications for the Phantom model, which includes a new design and requires a new steering box.16th Jul 1927West Wittering \ Q \ July1927-September1927  Scan030
Trial modifications for a 20HP starter pinion, outlining various schemes to be tested.16th Jul 1927West Wittering \ Q \ July1927-September1927  Scan031
Drawings for a new 20HP low-stress valve spring for experimental testing and standardization.20th Jul 1927West Wittering \ Q \ July1927-September1927  Scan032
Letter discussing a grouped arrangement for car clocks, proposing a new winding mechanism design involving bevel and spur gears.20th Jul 1927West Wittering \ Q \ July1927-September1927  Scan033
Policy on modifications for the Lightened Phantom with Turbulent Head.20th Jul 1927West Wittering \ Q \ July1927-September1927  Scan034
Introduction of a new type of petrol filter and the cancellation of the existing one.20th Jul 1927West Wittering \ Q \ July1927-September1927  Scan035
Proposed simpler scheme for centralised front axle lubrication.21th Jul 1927West Wittering \ Q \ July1927-September1927  Scan036
Carburetter air valve corrosion on a Phantom, comparing aluminium and brass options.22th Jul 1927West Wittering \ Q \ July1927-September1927  Scan037
Request for a triple diffuser Zenith carburetter to be sent for examination.22th Jul 1927West Wittering \ Q \ July1927-September1927  Scan038
Proposed improvements for the 20HP model, to be called INDIA.3.22th Jul 1927West Wittering \ Q \ July1927-September1927  Scan039
The selection and positioning of a hand-operated pump for the centralised chassis lubrication system.23th Jul 1927West Wittering \ Q \ July1927-September1927  Scan040
Difficulties with a Phantom wheel carrier and requesting details on a fracture.23th Jul 1927West Wittering \ Q \ July1927-September1927  Scan041
Options for instrument dials, including porcelain vs. silvered faces and a review of the A.T. speedometer.8th Aug 1927West Wittering \ Q \ July1927-September1927  Scan042
Design and material choice for instrument dials, specifically comparing porcelain and silvered faces.8th Aug 1927West Wittering \ Q \ July1927-September1927  Scan043
Steering and brake mechanism issues on the Springfield Chassis.8th Aug 1927West Wittering \ Q \ July1927-September1927  Scan044
Brake noise, cancelling the governor, and preventing banging in the exhaust.8th Feb 1940West Wittering \ Q \ July1927-September1927  Scan045
Design of the Phantom luggage grid, comparing forged side members to the tubular type.11th Aug 1927West Wittering \ Q \ July1927-September1927  Scan046
Internal memorandum discussing the layout and approval of grouped instruments on a car's instrument board.11th Aug 1927West Wittering \ Q \ July1927-September1927  Scan047
Modifications to the Phantom's rear spring centre fulcrum for the centralised chassis lubrication system.11th Aug 1927West Wittering \ Q \ July1927-September1927  Scan048
Design and sourcing of framed instrument panels for show cars and customers.13th Aug 1927West Wittering \ Q \ July1927-September1927  Scan049
Description of specifications for experimental designs India 3, India 4, EAC.10, and EAC.12.13th Aug 1927West Wittering \ Q \ July1927-September1927  Scan050
Suggestion to simplify windscreen design due to the universal use of screen wipers.13th Aug 1927West Wittering \ Q \ July1927-September1927  Scan051
Adapting the centralised chassis lubrication for various components to the Bijur system.13th Aug 1927West Wittering \ Q \ July1927-September1927  Scan052
Design, fitting, and commercial strategy for framed, grouped instrument panels.13th Aug 1927West Wittering \ Q \ July1927-September1927  Scan053
Requesting updated detail drawings for a Blue Sports Chassis due to discrepancies in received blueprints for the cylinder head and piston.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan054
Unapproved design for the 20HP timing gear's moveable idler wheel.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan055
Scheme to address friction and joggling in the steering column.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan056
Modifications to the centralised chassis lubrication for the Bijur system.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan057
Practicalities and aesthetics of supplying a luggage grid versus a complete rear wheel carrier for the Phantom model.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan058
Correspondence regarding the design and approval of grouped vehicle instruments and dials.17th Aug 1927West Wittering \ Q \ July1927-September1927  Scan059
Feedback and suggested modifications for the 10-EX Blue Sports Car.18th Aug 1927West Wittering \ Q \ July1927-September1927  Scan060
The problem of efficiently hanging and silencing rattling cabriolet doors.18th Aug 1927West Wittering \ Q \ July1927-September1927  Scan061
Proposed method for centralised chassis lubrication on the Phantom model.19th Aug 1927West Wittering \ Q \ July1927-September1927  Scan062
Suitability of speed indicators and the preferred style for instrument dials.19th Aug 1927West Wittering \ Q \ July1927-September1927  Scan063
Evaluation and potential adoption of new, higher-quality dashboard clocks.19th Aug 1927West Wittering \ Q \ July1927-September1927  Scan064
Disagreeing with the removal of tiebars from the 10-EX model, demanding they be replaced for structural integrity.20th Aug 1927West Wittering \ Q \ July1927-September1927  Scan065
Experiments and modifications to the Phantom combined spare wheel carrier and luggage grid.20th Aug 1927West Wittering \ Q \ July1927-September1927  Scan066
Framed instrument patch and a Watford clock for use in show cars.20th Aug 1927West Wittering \ Q \ July1927-September1927  Scan067
Centralised lubrication system and a new bridge for the servo gear.23th Aug 1927West Wittering \ Q \ July1927-September1927  Scan068
Alterations to the Phantom and India speedometer drives to accommodate windscreen wipers.23th Aug 1927West Wittering \ Q \ July1927-September1927  Scan069
Experimental induction pipe for the Phantom engine, intended for testing on the blue sports chassis.24th Aug 1927West Wittering \ Q \ July1927-September1927  Scan070
Proposed lubrication scheme for the Phantom's centralised chassis.24th Aug 1927West Wittering \ Q \ July1927-September1927  Scan071
Supply and fitting of framed instruments for Show Cars, including necessary dashboard modifications.24th Aug 1927West Wittering \ Q \ July1927-September1927  Scan072
Modified duralumin push rod for the Phantom valve gear.24th Aug 1927West Wittering \ Q \ July1927-September1927  Scan073
Design of framed instruments, including the Watford clock, dial branding, and finish of the instrument casting.25th Aug 1927West Wittering \ Q \ July1927-September1927  Scan074
Centralised chassis lubrication for the Phantom model, suggesting modifying a cross member flange.26th Aug 1927West Wittering \ Q \ July1927-September1927  Scan075
Dispatch of drawings for centralised chassis lubrication on the Phantom chassis.27th Aug 1927West Wittering \ Q \ July1927-September1927  Scan076
Suggesting a simple alteration for the centralised chassis lubrication of the torque tube bearing.27th Aug 1927West Wittering \ Q \ July1927-September1927  Scan077
Modifications required for a larger 20HP crankshaft.27th Aug 1927West Wittering \ Q \ July1927-September1927  Scan078
Battery ignition points, advocating for the use of tungsten over platinum and comparing different manufacturers.29th Aug 1927West Wittering \ Q \ July1927-September1927  Scan079
Letter discussing modifications to lighten and simplify the Phantom engine for sports applications, including changes to the crankshaft.29th Aug 1927West Wittering \ Q \ July1927-September1927  Scan080
Steering box experiments and the properties of various lubricating oils.29th Aug 1927West Wittering \ Q \ July1927-September1927  Scan081
Modifications for the Phantom centralised chassis lubrication system.30th Jun 1927West Wittering \ Q \ July1927-September1927  Scan082
Scheme 2456 for centralised chassis lubrication of the hand brake differential.31th Aug 1927West Wittering \ Q \ July1927-September1927  Scan083
Sending drawings for the Phantom Sports Engine, detailing crankcase, cylinder blocks, and valve gear.31th Aug 1927West Wittering \ Q \ July1927-September1927  Scan084


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙