Design alterations for the Wraith III and Bentley 111 connecting rod bush without shims.8th Feb 1938Box 132 \ 2  scan0239
Letter to Hughes Johnson Stampings Ltd regarding considerable errors found on connecting rods, E.60811/12.17th Aug 1937Box 132 \ 2  scan0240
Inspector's report on errors found in a proof forging of a connecting rod and cap.12th Aug 1937Box 132 \ 2  scan0241
Production issues and endurance testing of connecting rod little end bushes.21th Apr 1938Box 132 \ 2  scan0242
Assembly, clearance, and production issues of connecting rod small end bushes.26th Apr 1938Box 132 \ 2  scan0243
Connecting rod bearings for the Phantom III and Wraith models.15th Feb 1938Box 132 \ 2  scan0244
Specifications and value of experimenting with forged to size connecting rods.25th Mar 1939Box 132 \ 2  scan0245
Letter to arrange a meeting to discuss forged size rods.5th Apr 1939Box 132 \ 2  scan0246
Letter from Hardy Spicer & Co. Limited to Mr. Robotham arranging a meeting.6th Apr 1939Box 132 \ 2  scan0247
Letter confirming a visit to discuss dynamometer-tested slip joints and accepting a luncheon invitation.12th Apr 1939Box 132 \ 2  scan0248
Letter from Hardy Spicer & Co. Ltd regarding a revised print for a Con-rod Forging, omitting the test piece.20th Apr 1939Box 132 \ 2  scan0249
Letter to Hardy Spicer & Co., Ltd. confirming a satisfactory test piece from a connecting rod.28th Apr 1939Box 132 \ 2  scan0250
Agreement to delete test pieces from connecting rods produced by Hardy Spicer's.28th Apr 1939Box 132 \ 2  scan0251
Drawing for a coined connecting rod, noting the deletion of a test piece and requesting a copy for the Works.28th Apr 1939Box 132 \ 2  scan0252
The production of a forging drawing for a Bentley 5 connecting rod.1st May 1939Box 132 \ 2  scan0253
Requesting an estimate of savings from using un-machined connecting rods and a crankshaft with integral balance weights.26th May 1939Box 132 \ 2  scan0254
Letter from The S.U. Carburetter Co. Ltd. specifying the distance between the centres of 16 HP Con Rods.23th Oct 1939Box 132 \ 2  scan0255
Copy of a letter from Skinner concerning connecting rods.24th Oct 1939Box 132 \ 2  scan0256
Letter from The S.U. Carburetter Co. Ltd. regarding the centre distance of the 16 HP con rods.23th Oct 1939Box 132 \ 2  scan0257
Letter from Hardy Spicer regarding delays with new forging machines and difficulty procuring steel for Connecting Rods.26th Oct 1939Box 132 \ 2  scan0258
Letter to Hardy Spicer & Co. Ltd. regarding the provision of steel for a Con Rod experiment.27th Oct 1939Box 132 \ 2  scan0259
Drawings and production of connecting rods and associated parts.29th Dec 1939Box 132 \ 2  scan0260
Confirming a conversation about getting forgings from dies for B.V. connecting rods, with plans to re-sink the dies for 4-cylinder rods.22th Apr 1940Box 132 \ 2  scan0261
Production delays and tooling for connecting rods from supplier Hardy Spicers.24th Apr 1940Box 132 \ 2  scan0262
Suggestion to produce dies for forging size B.40 connecting rods.27th Apr 1940Box 132 \ 2  scan0263
Alteration note for a connecting rod, detailing the deletion of a dimension and the addition of a clarifying note.16th May 1940Box 132 \ 2  scan0264
Letter from Hardy Spicer & Co. discussing connecting rod forgings, including die life and tolerances.17th Jun 1940Box 132 \ 2  scan0265
Connecting rod big end lubrication.27th Jun 1941Box 132 \ 2  scan0266
Technical memorandum detailing the evolution and changes made to the connecting rod big end lubrication system.24th Jun 1941Box 132 \ 2  scan0267
Lubrication troubles and modifications for the Bentley engine.24th Jun 1941Box 132 \ 2  scan0268
The first engine drawing for the Bensport J.1 car, detailing drawing LeC.3256.29th Oct 1932Box 132 \ 3  scan0001
Design specifications for the Bensport J.3 engine oil tank.11th Nov 1932Box 132 \ 3  scan0002
Recommendations for oil tank design, including temperature management, cooling baffles, and drainage.11th Nov 1932Box 132 \ 3  scan0003
The venting of the Bensport J.1. oil tank to the crankcase.16th Nov 1932Box 132 \ 3  scan0004
Dynamo and crankcase modifications for the Bensport and 20/25 HP engines.10th Feb 1933Box 132 \ 3  scan0005
Bensport Series 1 modification to raise the starter motor for improved ground clearance after an issue on an experimental car.13th Mar 1933Box 132 \ 3  scan0006
Engine fumes in a Bensport Car and a proposed solution involving a new breather system.8th May 1933Box 132 \ 3  scan0007
Modifying the Bensport Oil Pipe, changing its shape, material, and adding a securing clip.8th May 1933Box 132 \ 3  scan0008
Modification for the Bentley bottom half crankcase to correct an issue where the brake rope fouls the silencer tie.31th May 1933Box 132 \ 3  scan0009
Breakage of a Bentley crankcase central main bearing and proposing a design modification.25th Oct 1933Box 132 \ 3  scan0010
Modifications to the Bentley Crankcase following an engine failure.26th Oct 1933Box 132 \ 3  scan0011
Modifications to Bentley crankcases, including a pattern alteration and the introduction of bolts for the centre bearing.27th Oct 1933Box 132 \ 3  scan0012
Modified positions of the filling plug and dip stick for a Bentley.13th Nov 1933Box 132 \ 3  scan0013
Crankcase modification to prevent oil starvation under braking.17th Nov 1933Box 132 \ 3  scan0014
Proposed modification to increase the Bentley's ground clearance after a customer's concern.21th Nov 1933Box 132 \ 3  scan0015
Diagram showing a modified sump plate and oil drain plug for a Bentley & 25HP to increase ground clearance.20th Nov 1933Box 132 \ 3  scan0016
Drawing LeC.3727, detailing a modification to the Bentley drain plug for improved ground clearance.11th Dec 1933Box 132 \ 3  scan0017
The modification of the Bentley sump drain plug to improve ground clearance.14th Dec 1933Box 132 \ 3  scan0018
Standardisation of a modified crankcase baffle to prevent loss of oil pressure during braking.20th Dec 1933Box 132 \ 3  scan0019
Requesting the re-build of a C.13 Unit with magnesium castings for testing on the Test Bed.7th Feb 1934Box 132 \ 3  scan0020
Test report on a Bentley magnesium top half crankcase failure and potential for redesign.15th May 1934Box 132 \ 3  scan0021
Photograph of a multi-cylinder engine crankcase with the main bearing caps installed.15th May 1934Box 132 \ 3  scan0022
Top-down photograph of an engine block's lower half, detailing the main bearing caps.11th Jun 1934Box 132 \ 3  scan0023
Modifications required for a Bentley 4-Bearing Crankcase to be cast in magnesium.11th Jun 1934Box 132 \ 3  scan0024
Requesting an immediate order for a magnesium lower half part for future use.5th Nov 1934Box 132 \ 3  scan0025
Request to make up a Spectre bottom half to address the loss of oil pressure during cornering and braking.19th Nov 1934Box 132 \ 3  scan0026
Potential use of Magnesium instead of R.R. Metal for a Bentley Bottom Half Crankcase to save weight.5th Dec 1934Box 132 \ 3  scan0027
Letter from High Duty Alloys Ltd. regarding the manufacturing feasibility of a Bentley Bottom Half Crankcase in Magnesium.4th Dec 1934Box 132 \ 3  scan0028
Reducing the thickness of the Bentley bottom half crankcase to save weight.7th Dec 1934Box 132 \ 3  scan0029
Request for a modified crankcase breather pipe for a Bentley vehicle.8th Apr 1935Box 132 \ 3  scan0030
Internal memorandum concerning a Bentley Crankcase Breather Pipe.25th Apr 1935Box 132 \ 3  scan0031
Test report on oil delivery to bearings for a Bentley Crankcase Oil Tube and bearings arrangement.15th Jul 1935Box 132 \ 3  scan0032
Test results for increased capacity helical gear Bentley oil pumps showing delivery rates and initial relief pressures.18th Jan 1935Box 132 \ 3  scan0033
Test log for a B-1 unit crankcase, detailing running hours, dates, test outcomes and failures.10th Aug 1935Box 132 \ 3  scan0034
Laboratory findings on the grain size of a bearing from a cracked Large Bore Bentley crankcase.13th Aug 1935Box 132 \ 3  scan0035
The cost and supply of magnesium metal bottom half crankcase castings for the Spectre Chassis.15th Aug 1935Box 132 \ 3  scan0036
Modification to the Spectre Crankcase rear flange to use set-screws instead of studs.6th Sep 1935Box 132 \ 3  scan0037
Listing new Lists of Parts (L.O.P.) and details for the Large Bore Bentley crankcase and bearings.28th Nov 1935Box 132 \ 3  scan0038
New and cancelled blueprints for the Bentley Chassis crankcase and bearings (Large Bore).10th Jan 1936Box 132 \ 3  scan0039
Instructions for a new experimental Sump Drain Plug for a Large Bore Bentley, including a request for destructive testing.16th Jan 1936Box 132 \ 3  scan0040
Directive to delete a machining operation on the crankcase bosses for cost reduction on Bentley and 25-30 HP chassis.25th Feb 1936Box 132 \ 3  scan0041
Unsatisfactory rear oil seal on the 25 HP & Bentley, proposing an experimental replacement.27th Feb 1936Box 132 \ 3  scan0042
Blueprints for a new crankcase drawing for an O.H.C. Car Engine S.C. Unit.4th Mar 1936Box 132 \ 3  scan0043
Request to alter the crankcase drawing for a Bentley engine to suit a large bore engine.17th Mar 1936Box 132 \ 3  scan0044
Modifications to a cast-iron crankcase and the scrapping of existing aluminium versions.17th Mar 1936Box 132 \ 3  scan0045
Request to the Pattern Shop to stop work on the pattern for the EX.20400 cylinder head.19th Mar 1936Box 132 \ 3  scan0046
Component changes for the Bentley II Chassis crankcase and bearings.26th Mar 1936Box 132 \ 3  scan0047
Instruction sheet detailing part replacements and modifications for crankshaft and connecting rod sections for an experiment.26th Mar 1936Box 132 \ 3  scan0048
Instruction regarding an omitted rear bearing cap for the Bentley II chassis crankcase.2nd Apr 1936Box 132 \ 3  scan0049
List of parts required for an experiment on the Bentley II Chassis Crankcase, Bearings, and Clutch Operating Mechanism.8th Apr 1936Box 132 \ 3  scan0050
Design and testing of an oil baffle box for the Phantom III crankcase breather.9th Apr 1936Box 132 \ 3  scan0051
New crankcase breather scheme (LeC.5067) for the Phantom III, designed to reduce oil loss at high speeds.22th Apr 1936Box 132 \ 3  scan0052
Modified crankcase breather for the Phantom III to address over-oiling issues at high RPM.23th Apr 1936Box 132 \ 3  scan0053
The testing of a newly designed Phantom III crankcase breather to solve an oil escape issue.16th Jun 1936Box 132 \ 3  scan0054
Cost-saving proposal for the Phantom III crankcase by changing the oil tray from aluminium to mild steel.9th Oct 1936Box 132 \ 3  scan0055
Investigation into cost reduction for the Phantom III lower half crankcase by modifying the oil flap valves.15th Oct 1936Box 132 \ 3  scan0056
Cost-saving modification to the Phantom III lower half crankcase and a request for testing.27th Oct 1936Box 132 \ 3  scan0057
Simplified oil flaps designed to cheapen production.2nd Nov 1936Box 132 \ 3  scan0058
The results of tests on a modified Phantom III lower half crankcase with altered oil flap valves.2nd Nov 1936Box 132 \ 3  scan0059
Urging the detailing of the lower half LeC.5345 to proceed with a 10,000-mile test.3rd Nov 1936Box 132 \ 3  scan0060
Letter to Cadillac requesting information on crankshaft dampers for 12-cylinder engines.10th Nov 1936Box 132 \ 3  scan0061
Request for a weight comparison of machined crankcase top halves from an external supplier against in-house castings.26th Nov 1936Box 132 \ 3  scan0062
Crankcase after a crack test, detailing nine cracks found and recommending repair.24th Dec 1936Box 132 \ 3  scan0063
Blueprint showing the results of a crack test on a B17 unit crankcase (top half).22th Dec 1936Box 132 \ 3  scan0064
Heat treatment and stress-releasing instructions for Hykro crankshafts for the Phantom III Chassis and Bentley.11th Dec 1936Box 132 \ 3  scan0065
Confirming the modification of the crankcase lower half for the Wraith model.11th Dec 1936Box 132 \ 3  scan0066
Bad crack found in the magnesium lower half crankcase of a Phantom III No. 11 Unit, causing oil leaks.26th Feb 1937Box 132 \ 3  scan0067
Blueprint detailing a cracked magnesium lower crankcase half, showing inverted and plan views with analysis.23th Feb 1937Box 132 \ 3  scan0068
Production efficiency report detailing casting times and weights for various components.5th Aug 1937Box 132 \ 3  scan0069
Cost analysis and manufacturing review of the Phantom III crankcase.9th Aug 1937Box 132 \ 3  scan0070