Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2262 of 2367        Sort by   Box   Date   Description

Filter      From        To        Search Hints      Identifier   [all]
DescriptionDateIdentifier
Faults with the brush and commutator system on the Goshawk dynamo.12th Dec 1922West Wittering \ J \ December1922  Scan57
Issues with the dynamo's control brush adjustment during production testing.12th Dec 1922West Wittering \ J \ December1922  Scan58
Explaining the delay in sending the 7-Goshawk-11 Maythorn Saloon for bodywork corrections due to experimental work.29th Nov 1922West Wittering \ J \ December1922  Scan59
Booming noise in a limousine trials car, identified as originating from the exhaust note.7th Dec 1922West Wittering \ J \ December1922  Scan60
Advantages of a semi-earthed electrical system for a chassis.5th Dec 1922West Wittering \ J \ December1922  Scan61
The disadvantages of the Goshawk electrical system and a proposal for a semi-earthed system for lamp circuits.12th Dec 1922West Wittering \ J \ December1922  Scan62
Points regarding the emergency fuse on the Goshawk system and the inspection lamp wiring.12th Dec 1922West Wittering \ J \ December1922  Scan63
Wiring diagram for a semi-earthed electrical system.5th Dec 1922West Wittering \ J \ December1922  Scan64
Test report on the durability and performance of a Bijur type Bendix starter after 8,000 operations.12th Dec 1922West Wittering \ J \ December1922  Scan65
Performance and weaknesses of spring shackles, comparing C.H.N.S. bushes to bronze and highlighting wear issues.6th Dec 1922West Wittering \ J \ December1922  Scan66
Information received on nickel iron alkaline batteries from Mr. Minchin of Peto & Radford Co.7th Dec 1922West Wittering \ J \ December1922  Scan67
Extract of a letter discussing the experimental state and numerous issues with nickel-iron batteries.4th Dec 1922West Wittering \ J \ December1922  Scan68
Report comparing the performance of Alklum and Ni-Fe motor car batteries.5th Dec 1922West Wittering \ J \ December1922  Scan69
Output performance and test results for the Goshawk dynamo.7th Dec 1922West Wittering \ J \ December1922  Scan70
Dynamo performance, comparing machines and detailing a new test rig setup.7th Dec 1922West Wittering \ J \ December1922  Scan71
Graph showing the output performance curves of Goshawk and Lucas E.875 dynamos versus RPM.7th Dec 1932West Wittering \ J \ December1922  Scan72
Improved spring arrangement for the 40/50 HP chassis throttle control.8th Dec 1922West Wittering \ J \ December1922  Scan73
Rattles from the magneto drive's serrated joints on 20 HP cars and a proposed solution.1st Dec 1922West Wittering \ J \ December1922  Scan74
Recommendation to revert to fixed bushes for springs on the 20 HP model due to wear and repair difficulties with floating bushes.12th Dec 1922West Wittering \ J \ December1922  Scan75
Test report detailing failures of a modified 20 HP steering support, stays, and aluminium steering boxes.12th Dec 1922West Wittering \ J \ December1922  Scan76
Analysing the sources of vibrations and 'boom' in a limousine trials car, focusing on engine, axle, and exhaust note frequencies.12th Dec 1922West Wittering \ J \ December1922  Scan77
Vehicle vibrations, resonance, and body construction to mitigate undesirable noise.11th Aug 1920West Wittering \ J \ December1922  Scan78
The causes and prevention of 'roof booming' in vehicle bodies.11th Aug 1920West Wittering \ J \ December1922  Scan79
Stress test performed on a steering box and a change in material to aluminium bronze.13th Dec 1922West Wittering \ J \ December1922  Scan80
Proposal for a friction drive scheme using spring-loaded bevelled rings to achieve quieter engine gears.13th Dec 1922West Wittering \ J \ December1922  Scan81
Continued note discussing the necessity of having tight gears and thick oil.14th Dec 1922West Wittering \ J \ December1922  Scan82
Experiments to measure temperatures attained by the Goshawk ignition coil.14th Dec 1922West Wittering \ J \ December1922  Scan83
Report page detailing temperature tests on various engine coil configurations, including insulated and uninsulated setups.14th Dec 1922West Wittering \ J \ December1922  Scan84
Report comparing the performance of various ignition coils, including bakelite and Goshawk types, under different test conditions.14th Dec 1922West Wittering \ J \ December1922  Scan85
Comparison of performance between improved bakelite, 40/50, and stabalite ignition coils.14th Dec 1922West Wittering \ J \ December1922  Scan86
Comparison report on the performance of a 40/50 standard coil versus Mr. Brock's No.1 coil.6th Dec 1922West Wittering \ J \ December1922  Scan87
Graph showing temperature time curves for a Goshawk engine ignition coil under various test conditions.13th Dec 1922West Wittering \ J \ December1922  Scan88
Correction regarding the ampere turns for the 'Seagull' dynamo yoke.20th Dec 1922West Wittering \ J \ December1922  Scan89
The components and operational principles of a post-war R. Bosch electrical system received for examination and testing.20th Dec 1922West Wittering \ J \ December1922  Scan90
Continued description of the operation of the dynamo regulating range, cutout unit, and solenoid-operated starter motor.30th Dec 1922West Wittering \ J \ December1922  Scan91
Description of the starter switch, switchbox functions, and various lighting and magneto connections.20th Dec 1922West Wittering \ J \ December1922  Scan92
Description of the car's electrical system, dynamo charging indicators, and fuse arrangements.20th Dec 1922West Wittering \ J \ December1922  Scan93
Wiring diagram for a Post-War Bosch lighting and starting system.22th Dec 1922West Wittering \ J \ December1922  Scan94
Proposing a visit to W.W. and outlining the substitution of a 40/50 HP car for a Goshawk-11.27th Dec 1922West Wittering \ J \ December1922  Scan95
Engine bench tests conducted on exhaust valves for a 20 HP chassis to investigate failures.27th Dec 1922West Wittering \ J \ December1922  Scan96
Analysis of engine pre-ignition, its effect on exhaust valves, and ongoing tests on various engines.27th Dec 1922West Wittering \ J \ December1922  Scan97
Diagnosis of an engine problem, identified as pre-ignition potentially caused by over-heating or fuel mixture.27th Dec 1922West Wittering \ J \ December1922  Scan98
Requesting a No.4 Goshawk 20.HP car for an advertisement photograph.27th Dec 1922West Wittering \ J \ December1922  Scan99
American production procedures, focusing on chassis standardisation and issues with the Bosch battery ignition system.27th Dec 1922West Wittering \ J \ December1922  Scan100
The wiring arrangement for the Goshawk 11, requesting a complete set of drawings.1st Feb 1923West Wittering \ J \ February1923  Scan0
Agreement to a permanent application of radius rods to the Goshawk front axle to correct steering geometry.5th Feb 1929West Wittering \ J \ February1923  Scan1
Design of bonnet shutters versus louvres for increased cooling capacity on the Goshawk.2nd Feb 1923West Wittering \ J \ February1923  Scan2
Development policy for the Goshawk and Seagull chassis, with a focus on universal joints.7th Feb 1923West Wittering \ J \ February1923  Scan3
With suggestions regarding compression, smoking, ignition, and starting handle for the E.A.C. Engine.1st Feb 1924West Wittering \ J \ February1923  Scan4
Design of a new 40/50 water pump rotor using various materials.9th Feb 1923West Wittering \ J \ February1923  Scan5
Preliminary General Arrangement drawing (N.sch. 1374) for the 'Seagull' project, noting it is not a final design.9th Feb 1923West Wittering \ J \ February1923  Scan6
Telegram from Royce requesting Hives to bring spare miniature ignition plugs.12th Feb 1923West Wittering \ J \ February1923  Scan7
Telegram received by telephone suggesting a meeting on Wednesday.12th Feb 1923West Wittering \ J \ February1923  Scan8
Specifications for a starter motor's pinion, flywheel, and epicyclic reduction.15th Feb 1923West Wittering \ J \ February1923  Scan9
Recommending battery ignition as the primary system for the Goshawk engine, with a magneto fitted as a standard reserve.11th Aug 1920West Wittering \ J \ February1923  Scan10
Secret memorandum discussing the design and construction of experimental bodies for a 40/50 template chassis.20th Feb 1923West Wittering \ J \ February1923  Scan11
Modifications to the exhaust choke valve control for the 40/50 chassis.22th Feb 1923West Wittering \ J \ February1923  Scan12
Use of a G.S. Watford magneto for the Goshawk 11 ignition system.23th Feb 1923West Wittering \ J \ February1923  Scan13
Design and simplification of the Goshawk 11 cutout actuation mechanism.23th Feb 1923West Wittering \ J \ February1923  Scan14
Secret memo regarding modifications to an experimental chassis, specifically the R.H. levers.23th Feb 1923West Wittering \ J \ February1923  Scan15
The fitting and road testing of a new thermostat for a Goshawk 11 engine, with design suggestions.24th Feb 1923West Wittering \ J \ February1923  Scan16
Magneto ignition for the Goshawk 11 engine, referencing correspondence with Messrs North.24th Feb 1923West Wittering \ J \ February1923  Scan17
Letter from North & Sons Ltd. discussing the supply and specifications of 6-cylinder magnetos.13th Sep 1921West Wittering \ J \ February1923  Scan18
Diagnosis and repair of a sticking thermostat for car 5.GOS: 11.27th Feb 1923West Wittering \ J \ February1923  Scan19
Requesting a blueprint for the breather pipe from the crankcase to the hot air pipe on a 40/50 chassis.27th Feb 1923West Wittering \ J \ February1923  Scan20
Specifications and alterations for the 40/50 Dynamo and E.A.C. motor, including armature, carcase, and winding details.28th Feb 1923West Wittering \ J \ February1923  Scan21
Starter motor drive ratios, voltage loss in circuits, and upcoming matters concerning the EAC gearbox and clutch.11th Aug 1920West Wittering \ J \ February1923  Scan22
Requesting the average wear rate on Goshawk II clutches and comparative test results for three different Ferodo clutch fabrics.28th Feb 1923West Wittering \ J \ February1923  Scan23
Request for a suitable box spanner and an adapter to fit and test new miniature spark plugs.28th Feb 1923West Wittering \ J \ February1923  Scan24
Results of tests on piston scraper rings and the advantages of the bevel ring design.1st Feb 1923West Wittering \ J \ February1923  Scan25
Testing and failure analysis of a Bijur starter drive.1st Feb 1923West Wittering \ J \ February1923  Scan26
Comparing the Bijur and Bendix starter drives, noting future application to the 'Seagull' and 'Goshawk' projects.1st Feb 1923West Wittering \ J \ February1923  Scan27
Investigation into the cause of carburettor whistle and two proposed lines of action to eliminate the noise.1st Feb 1923West Wittering \ J \ February1923  Scan28
Continuation of a report on carburetter noise tests, comparing different throttle types and air inlet configurations.7th Feb 1923West Wittering \ J \ February1923  Scan29
Successful induction pipe experiments and suggestions for further tests on Seagull and Marmon engines.2nd Feb 1923West Wittering \ J \ February1923  Scan30
Proposing a replacement driver, T. Maddocks, for the car '4.GOSHAWK.11' and outlining the travel plan to France.2nd Feb 1923West Wittering \ J \ February1923  Scan31
Extensive alterations and subsequent delays in preparing the Goshawk I car.5th Feb 1923West Wittering \ J \ February1923  Scan32
Outlining necessary improvements and features for the magneto on the 20 HP car.6th Feb 1925West Wittering \ J \ February1923  Scan33
The unsuitability of fibre washers for petrol joints and a proposal to use cork or leather instead.6th Feb 1923West Wittering \ J \ February1923  Scan34
Modifications to reduce carburetter suction noise.6th Feb 1923West Wittering \ J \ February1923  Scan35
Achieving silence with a baffle for a long hot air pipe and sending a standardisation sheet.7th Feb 1923West Wittering \ J \ February1923  Scan36
Scheme for a spring control on the butterfly valve of an exhaust pipe to prevent throttle stickiness.7th Feb 1923West Wittering \ J \ February1923  Scan37
Proposed scheme for a stay to be fitted to the 40/50 swan neck.2nd Feb 1923West Wittering \ J \ February1923  Scan38
Design considerations for the Seagull Dynamo, particularly regarding a reduction in carcase diameter.17th Feb 1923West Wittering \ J \ February1923  Scan39
Excessive wear on the 40/50 HP water pump rotor and a proposal for a new design.7th Feb 1923West Wittering \ J \ February1923  Scan40
Road test results comparing standard radiator tubes with new indented tubes for improved cooling efficiency.2nd Feb 1923West Wittering \ J \ February1923  Scan41
From Hs. to R. regarding the delivery of the 'Goshawk 1' car and a planned meeting.9th Feb 1923West Wittering \ J \ February1923  Scan42
Testing of a thermostat for a 5-Goshawk-11 engine.10th Feb 1923West Wittering \ J \ February1923  Scan43
Cover letter for two reports comparing the wear of different rubbing blocks and testing tungsten contact points.2nd Feb 1923West Wittering \ J \ February1923  Scan44
Endurance test report on the Goshawk Distributor, focusing on the wear of the bakelite rubbing block.30th Oct 1922West Wittering \ J \ February1923  Scan45
Instruction sheet detailing a test to measure the wear on various distributor components.30th Oct 1922West Wittering \ J \ February1923  Scan46
Instruction sheet detailing wear and corrosion on a distributor head, spring, and rubbing block.30th Oct 1922West Wittering \ J \ February1923  Scan47
Endurance test report for parts fitted to the Goshawk ignition system.29th Jan 1923West Wittering \ J \ February1923  Scan48
Testing contact points and comparing the wear of a grey fibre rubbing block with a bakelite block.29th Jan 1923West Wittering \ J \ February1923  Scan49
Test report detailing fibre wear creating dust that covered components, leading to corrosion and wear on ignition parts.29th Jan 1923West Wittering \ J \ February1923  Scan50
Comparative test report on Raybestos and Ferodo clutch fabrics for a 20 HP clutch.16th Feb 1923West Wittering \ J \ February1923  Scan51
The loss of friction coefficient in brake liners and clutch material from supplier Ferodo Ltd.30th Jan 1923West Wittering \ J \ February1923  Scan52
Letter from Ferodo Ltd. detailing the test results of a 20 HP plate clutch lining.30th Jan 1923West Wittering \ J \ February1923  Scan53
Test results for Ferodo Bonden Asbestos plate clutch linings against different plate materials.30th Jan 1923West Wittering \ J \ February1923  Scan54
Letter from Ferodo Ltd. regarding test results and recommendations for a 20.HP plate clutch lining.30th Jan 1923West Wittering \ J \ February1923  Scan55


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙