Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2343 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Secret memo discussing an exhaust roar issue, proposing a new type of rear silencer, and mentioning a Bentley car.11th Jul 1929West Wittering \ T \ March1929-December1929  Scan181
Request from Mr. Royce to trial an experimental rubber-isolated rear gearbox suspension.13th Jul 1929West Wittering \ T \ March1929-December1929  Scan182
Sending a car to Derby for piston replacement and its subsequent performance.16th Jul 1929West Wittering \ T \ March1929-December1929  Scan183
Confirmation of a telegram arranging a meeting.22th Jul 1929West Wittering \ T \ March1929-December1929  Scan184
Modifications to the crankshaft and wheelcase for an improved slipper flywheel and spring drive.26th Jul 1929West Wittering \ T \ March1929-December1929  Scan185
Proposed modifications to an SS exhaust system, including a new silencer and pipe diameter reduction.26th Jul 1929West Wittering \ T \ March1929-December1929  Scan186
First drawings for an experimental epicyclic 3rd speed gearbox.26th Jul 1929West Wittering \ T \ March1929-December1929  Scan187
Effects of increasing the water space between radiator tubes.13th Aug 1929West Wittering \ T \ March1929-December1929  Scan188
Modifications to the SS exhaust system, including a new expansion box and reduced pipe diameter.15th Aug 1929West Wittering \ T \ March1929-December1929  Scan189
Failed modification to the clutch trunnion lubrication system and the dispatch of a replacement nozzle for a 20HP model.20th Aug 1929West Wittering \ T \ March1929-December1929  Scan190
List of required alterations and improvements for a 20HP car, model 16-G-4.20th Aug 1929West Wittering \ T \ March1929-December1929  Scan191
Design differences and suggestions for the 20HP side spare wheel carrier.22th Aug 1929West Wittering \ T \ March1929-December1929  Scan192
Requesting a report on the position of the freewheel in the sideshaft on the 20HP gearbox.22th Aug 1929West Wittering \ T \ March1929-December1929  Scan193
Design of the 20HP transmission, specifically the freewheel and clutch arrangement.24th Aug 1929West Wittering \ T \ March1929-December1929  Scan194
Modifications and suggestions for the 20HP side wheel carrier.28th Aug 1929West Wittering \ T \ March1929-December1929  Scan195
Design modifications for the 20HP side wheel carrier, including a sketch with dimensions.29th Aug 1929West Wittering \ T \ March1929-December1929  Scan196
Wheel arch clearance issues and fouling on 'WJ' series cars, with test results and proposed modifications.4th Sep 1929West Wittering \ T \ March1929-December1929  Scan197
Modifications to wheel arch clearances and revised instructions to coachbuilders.4th Sep 1929West Wittering \ T \ March1929-December1929  Scan198
Drawing showing a revised arch with notes on a new clearance for the axle.5th Sep 1929West Wittering \ T \ March1929-December1929  Scan199
Geometric investigation into rear wheel arch clearance issues on the new SS cars compared to the Phantom.5th Sep 1929West Wittering \ T \ March1929-December1929  Scan200
Wheel arch clearance, suspension oscillation, and rolling tests for the Phantom model.17th Sep 1929West Wittering \ T \ March1929-December1929  Scan201
Proposal to adapt existing 20HP and 45HP car dynamos into 1/4HP, 50-volt motors.17th Sep 1929West Wittering \ T \ March1929-December1929  Scan202
Modifications to the SS. Exhaust System and its spring anchorage.20th Sep 1929West Wittering \ T \ March1929-December1929  Scan203
Fitting of an epicyclic third speed gear to an experimental car, including required modifications.21th Sep 1929West Wittering \ T \ March1929-December1929  Scan204
Alterations to the epicyclic 3rd speed gear clutch.21th Sep 1929West Wittering \ T \ March1929-December1929  Scan205
Development of sports cars, specifically the Phantom II and 20HP models, including body type and power enhancements.24th Sep 1929West Wittering \ T \ March1929-December1929  Scan206
Modification to the dashboard pump to prevent oil leaks and improve assembly.27th Sep 1929West Wittering \ T \ March1929-December1929  Scan207
Recent 'Japan' improvements to the 20HP clutch.1st Oct 1929West Wittering \ T \ March1929-December1929  Scan208
Ongoing issues with rear wheel arch clearances on the Phantom II model.2nd Oct 1929West Wittering \ T \ March1929-December1929  Scan209
Requirements and proposed schemes for induction pipe heating on the Phantom II.4th Oct 1929West Wittering \ T \ March1929-December1929  Scan210
Scheme for thermostatically operated radiator shutters and modifications for the 20HP chassis.5th Oct 1929West Wittering \ T \ March1929-December1929  Scan211
Considerations and strategy for developing supercharged car engines, comparing different cylinder configurations and referencing competitors.10th Sep 1929West Wittering \ T \ March1929-December1929  Scan212
Comparison of the 20HP gearbox with a freewheel in the sideshaft against the De Lavaud scheme.11th Oct 1929West Wittering \ T \ March1929-December1929  Scan213
Phantom II's performance at Brooklands, focusing on achieving higher speeds through axle ratio changes and ride quality improvements.11th Oct 1929West Wittering \ T \ March1929-December1929  Scan214
Proposed performance improvements for the 20HP car engine and chassis.10th Oct 1929West Wittering \ T \ March1929-December1929  Scan215
New radiator filter designed to collect sediment from the cylinder block.14th Oct 1929West Wittering \ T \ March1929-December1929  Scan216
Inquiring about the status and approved position of a front numberplate.15th Oct 1929West Wittering \ T \ March1929-December1929  Scan217
Modification to the Phantom II clutch.15th Oct 1929West Wittering \ T \ March1929-December1929  Scan218
Confidential and secret memorandum regarding the future strategy and potential improvements for the 20HP chassis.17th Oct 1929West Wittering \ T \ March1929-December1929  Scan219
The Sports Phantom II rear axle, discussing a revision to the bevel axle and comparing it with a hypoid axle design.23th Oct 1929West Wittering \ T \ March1929-December1929  Scan220
Sending N. scheme 2972, detailing the 13/41 hypoid gears required for the Sports Phantom rear axle.25th Oct 1929West Wittering \ T \ March1929-December1929  Scan221
Wheel arch clearances concerning rear seats, tyre rubbing, and potential modifications.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan222
Report from Paris comparing the acceleration of American versus British chassis.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan223
Proposing tests on frames with increased vertical stiffness for the Phantom II and 25HP models to improve radiator steadiness and steering.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan224
Potential modifications to the 25HP radiator and lowering the transmission line using a hypoid back axle.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan225
Required specifications for a hypoid gear on the back axle of the Phantom II Sports Car.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan226
Technical memorandum discussing the differences between American and English car springing and damping systems.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan227
Scheme 2974 for an SS Rear Axle with an 11/41 hypoid ratio.26th Oct 1929West Wittering \ T \ March1929-December1929  Scan228
Design options for the Phantom II exhaust heated throttle and silencer system.28th Oct 1929West Wittering \ T \ March1929-December1929  Scan229
Proposal to supercharge the 'twenty' model engine.29th Oct 1929West Wittering \ T \ March1929-December1929  Scan230
Fitment issues of a larger Dunlop tyre on a Phantom II spare wheel carrier.30th Oct 1929West Wittering \ T \ March1929-December1929  Scan231
Brake performance issues on the Phantom II, specifically pedal feel, sponginess, and clearances.30th Oct 1929West Wittering \ T \ March1929-December1929  Scan232
Quality and appearance of chromium plating on parts from Derby.30th Oct 1929West Wittering \ T \ March1929-December1929  Scan233
Arrangement of a 3-wire, 50V electrical system with a two-speed armature.31th Oct 1929West Wittering \ T \ March1929-December1929  Scan234
Proposal for an integrated starter protection and lubrication indicator system for the Phantom II model.31th Oct 1929West Wittering \ T \ March1929-December1929  Scan235
Modifications for the introduction of a larger 2' diameter crankpin for the 20HP engine.2nd Nov 1929West Wittering \ T \ March1929-December1929  Scan236
Power increase modifications for the 'China' 25HP engine, including timing, valve, and pipe specifications.4th Nov 1929West Wittering \ T \ March1929-December1929  Scan237
Particulars of a camshaft and valve spring.4th Nov 1929West Wittering \ T \ March1929-December1929  Scan238
Modified bonnet, radiator, and dash for the 25HP chassis.4th Nov 1929West Wittering \ T \ March1929-December1929  Scan239
Engine improvements for 'China' based on modifications previously made for 'Japan'.5th Nov 1929West Wittering \ T \ March1929-December1929  Scan240
Scheme for the automatic lubrication of the Phantom II clutch spigot bearing from the gearbox.6th Nov 1929West Wittering \ T \ March1929-December1929  Scan241
Modifications to the Phantom II clutch, including a proposal from Mr. Royce.6th Nov 1929West Wittering \ T \ March1929-December1929  Scan242
Modifications to the 20/25HP clutch, including the use of Ferodo lining.6th Nov 1929West Wittering \ T \ March1929-December1929  Scan243
Modifications for automatic lubrication of the 20/25HP 'JAPAN' clutch spigot bearing, suggesting experimental application.6th Nov 1929West Wittering \ T \ March1929-December1929  Scan244
20HP scuttle isolation and revised subframe for model 14-G.4, requesting prints for coachbuilders.7th Nov 1929West Wittering \ T \ March1929-December1929  Scan245
Modifications for dropping the 20HP radiator 2 inches into the frame.8th Nov 1929West Wittering \ T \ March1929-December1929  Scan246
Safety issue with the 20HP front axle control during braking.8th Nov 1929West Wittering \ T \ March1929-December1929  Scan247
Arguing against the purchase of a 2-litre Alfa Romeo to instead focus on improving the 20HP model.8th Nov 1929West Wittering \ T \ March1929-December1929  Scan248
Dispatch of an inlet and exhaust manifold, and a cylinder head for the 'China' project.9th Nov 1929West Wittering \ T \ March1929-December1929  Scan249
Schematics for a Hooper Faux Cabriolet Phantom II for the Riviera Trials.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan250
Designs for a 20-25HP Windover Open Touring Car for the 1930 Riviera season trials.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan251
Progress update on development projects codenamed 'China' and 'Japan', covering cylinder heads, valves, and a hypoid axle.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan252
Wiring modifications and alternative designs for a starter protection system.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan253
Drawings of two close-coupled body designs for a Phantom II European Propaganda Car.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan254
New replacement body for an experimental enclosed limousine on a 20-25HP long chassis.11th Nov 1929West Wittering \ T \ March1929-December1929  Scan255
Causes and potential solutions for brake clanking and sponginess.12th Nov 1929West Wittering \ T \ March1929-December1929  Scan256
Alternative schemes for a front expansion box for the China exhaust system.15th Nov 1929West Wittering \ T \ March1929-December1929  Scan257
From DA to HS regarding design challenges with the 20HP front axle control.15th Nov 1929West Wittering \ T \ March1929-December1929  Scan258
Modifications to a Phantom II vehicle for the Prince of Wales.15th Nov 1929West Wittering \ T \ March1929-December1929  Scan259
Opinion on the insufficient current output of the 20HP dynamo.16th Nov 1929West Wittering \ T \ March1929-December1929  Scan260
Analysis of test results comparing long and short duration cams on a Standard 20/25HP engine.16th Nov 1929West Wittering \ T \ March1929-December1929  Scan261
Trials of longer duration cams and greater tappet clearance on the 25HP 'CHINA' engine.16th Nov 1929West Wittering \ T \ March1929-December1929  Scan262
Drawing for an exhaust pipe related to immediate modifications for 'ChinaNAL'.18th Nov 1929West Wittering \ T \ March1929-December1929  Scan263
Alternative methods for modifying the leverage on the Phantom II brakes.18th Nov 1929West Wittering \ T \ March1929-December1929  Scan264
Modifications to the body subframe for the 20/25HP long chassis.19th Nov 1929West Wittering \ T \ March1929-December1929  Scan265
Modification options for a 25HP engine and the resulting horsepower outputs.19th Nov 1929West Wittering \ T \ March1929-December1929  Scan266
Letter to Park Ward & Co. commissioning an experimental enclosed limousine for Mr. Royce, detailing various design schemes.19th Nov 1929West Wittering \ T \ March1929-December1929  Scan267
Confidential letter regarding the subframe, floor, and body modifications for a car to be used personally by Mr. Royce.21th Nov 1929West Wittering \ T \ March1929-December1929  Scan268
Battery overcharging, dynamo output, the 'green light scheme', and the efficiency of various lighting systems.21th Nov 1929West Wittering \ T \ March1929-December1929  Scan269
Merits and processes of chromium plating versus nickel silver and Staybrite for various car parts.21th Nov 1929West Wittering \ T \ March1929-December1929  Scan270
Causes and potential solutions for radiator blockage.22th Nov 1929West Wittering \ T \ March1929-December1929  Scan271
Confidential memorandum discussing engine performance, chassis gearing, and modifications for the 20/25HP model.22th Nov 1929West Wittering \ T \ March1929-December1929  Scan272
Knocking in 20HP rear shock dampers and potential design changes.25th Nov 1929West Wittering \ T \ March1929-December1929  Scan273
Brief memo regarding a suggestion about Phantom II brakes.25th Nov 1929West Wittering \ T \ March1929-December1929  Scan274
Sketch for a new test radiator with cleanable passages and an intercepting self-cleaning filter.25th Nov 1929West Wittering \ T \ March1929-December1929  Scan275
Issue with lowering the springs on a 20HP front axle.26th Nov 1929West Wittering \ T \ March1929-December1929  Scan276
Short memo sending additional information regarding F-type carburettors in the Vee.26th Nov 1929West Wittering \ T \ March1929-December1929  Scan277
Design, manufacture, and cost of Phantom II road springs.26th Nov 1929West Wittering \ T \ March1929-December1929  Scan278
Lubrication system for the universal and sliding joints on a 20/25 HP experimental car chassis.26th Nov 1929West Wittering \ T \ March1929-December1929  Scan279
Design and standardisation of bonnet locks for the Phantom II.26th Nov 1929West Wittering \ T \ March1929-December1929  Scan280


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙