Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2332 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Carburetion and cold weather performance of the SS model, comparing it to the Phantom.24th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan065
Issues with the reserve petrol supply system and proposed solutions.24th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan066
Petrol reserve arrangements and a recommendation to remove the feature entirely.24th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan067
The condition of stiffer big end bearings after a seven-hour engine test on an F.XLV.MS.27 engine.24th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan068
Laboratory starter rig for observing and investigating gear jamming during engagement.26th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan069
Analysis of the cause of jamming between pinion and wheel teeth due to the design of their corners.26th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan070
Mechanical jamming issue, proposing solutions like a disengaging radius and backed-off teeth.26th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan071
Continued report page on studying a system weakness related to push button pressure and supply voltage.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan072
Comparative analysis of expanding and static type car carburettors to improve performance.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan073
List of advantages and disadvantages concerning carburettor operation and performance.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan074
Analysis of static carburettor performance and disadvantages, including a diagram of mixture at small throttle openings.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan075
Description of engine stalling due to fuel supply failure during rapid acceleration, comparing car and aero engines.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan076
Page describing the operation of the Phantom carburetter, focusing on low speed, acceleration, and the function of the automatic air valve, with an accompanying diagram.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan077
Page detailing carburetter performance, specifically comparing the Phantom carburetter to static carburetters like the Twin Solex.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan078
Overcoming high depression troubles in a carburetter by employing diffuser type jets.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan079
Carburetter operation with two illustrative diagrams.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan080
The design and advantages of a static, suction-controlled carburettor.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan081
Page discussing the benefits of a diffuser type jet and suction valve in a carburetter for potential future protection.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan082
Tests conducted on the 'SS' expanding carburetter, detailing induction pipe depression measurements on a Phantom engine.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan083
Carburettor tests on induction pipe depression related to choke and restrictor area.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan084
Page discussing modifications to improve air flow in an intake, involving the choke and float chamber.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan085
Graph plotting induction depressions against the area past the choke for an S.S. carburettor.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan086
Mostly blank document with a purple 'Print Room' stamp in the bottom right corner.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan087
Performance and issues with various headlamp schemes.28th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan088
Carburetter freezing issues on 'F' type 'Vee' engines and proposed solutions.29th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan089
Blueprint of a plate type fire proof air intake for R.R. F. Carburettors.30th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan090
Need to repeat a type test for a Moderate Supercharged F. Engine due to bearing failure caused by detonation, and the proposed solution of reducing the compression ratio.29th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan091
Engine endurance and detonation tests, with proposed modifications for future type testing.26th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan092
Comparative power curves for engine F.XIV-MS-27 with compression ratios of 5.3/1, 5.5/1, and 6/1.26th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan093
Page featuring a purple ink stamp from the Print Room.30th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan094
The testing of 'SS' road springs and a new lubrication scheme.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan095
Higher output dynamos, their charging rates, and the potential for premature battery deterioration.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan096
Battery overcharging, dynamo output curves, and the potential use of a green lamp charge indicator.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan097
Experiments with higher output dynamos and green lamp schemes on various car chassis.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan098
Anxiety from the Sales department regarding dynamo output and exploring potential improvements.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan099
Machine output by adding weight, and the justification for including a green lamp indicator in the chassis electrical system.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan100
General performance report on the Solex double choke carburetter fitted to a 12-EX chassis.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan101
Performance comparison report between a standard carburetter and a Solex carburetter, detailing acceleration and hill climb test results.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan102
Performance data from hill climb tests comparing R.R. and Solex carburettor configurations.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan103
Comparison of petrol consumption between a standard (R.R.) and a Solex carburettor at various speeds.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan104
Graph comparing the acceleration of a Phantom (12EX) with Solex and RR carburettors.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan105
The reverse of a document showing a company date stamp.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan106
Graph comparing the B.M.E.P. of a Phantom engine using a Solex twin carburetter versus the standard carburetter.30th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan107
Blueprint diagram for a Solex Diffuser Tube with dimensions.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan108
Sectional diagram of a Solex twin choke carburetter tested on a Standard Phantom.5th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan109
Graph comparing power curves of two Solex carburetter choke sizes against the standard Phantom carburetter.20th Jan 1929West Wittering \ T \ 2January1929-June1929  Scan110
Blank page with a date stamp.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan111
Successful trial of a Solex carburetter for the Phantom model.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan112
Tests conducted on a twin choke Solex carburetter fitted to a Phantom model, both on the test bed and on the road.7th Feb 1939West Wittering \ T \ 2January1929-June1929  Scan113
Test bed runs comparing the performance of Solex carburetors against the standard Phantom carburetor, focusing on B.M.E.P. gains.7th Feb 1939West Wittering \ T \ 2January1929-June1929  Scan114
Carburettor choke sizes and their effect on low-speed performance and driveability.7th Feb 1939West Wittering \ T \ 2January1929-June1929  Scan115
Page discussing engine induction systems, carburettor configurations, and fuel distribution improvements across various engine models.7th Feb 1939West Wittering \ T \ 2January1929-June1929  Scan116
Carburettor development, comparing single versus double carburettors, and suggesting tests for improved low speed torque.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan117
Recommending the standardisation of Morganite Grade EG2 brushes for Phantom and S.S. Dynamos following a 10,000-mile test.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan118
Test report on the 10,000-mile performance of Morganite EG2 brushes on a dynamo.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan119
Trials on a pinion for a sequence starter, observing jamming faults and comparing it to a Bosch design.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan120
Development of slackness in the R.R. pinion and its splines, comparing it with a Bosch design.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan121
Blueprint of an induction system for a Phantom, used for Solex carburetter experiments.7th Feb 1928West Wittering \ T \ 2January1929-June1929  Scan122
Comparison blueprint of different types of trunnion bearings.8th Feb 1928West Wittering \ T \ 2January1929-June1929  Scan123
Investigation into radiator movement issues on the 'SS' model.8th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan124
Tests on radiator movement and engine roughness under various body, subframe, and engine mounting conditions.8th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan125
Page 3 of a report detailing modifications and test results for body mounting and frame damping.8th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan126
Test report in table format detailing the results of 'SS' radiator movement under different engine and body mounting conditions.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan127
Secret test report on Hypoid gears and propeller shaft joints for the 'SS' chassis.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan128
The investigation of faults with joints and the testing of the gearbox and vacuum pump.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan129
Power curves comparing the SS and Phantom models, and an update on a new rear wheel carrier.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan130
Graph plotting Horse Power at the Road Wheels against Engine RPM for the Standard Phantom and S.S. Chassis models.7th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan131
Blank document page with a purple date stamp.8th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan132
Test results for the 'SS' model's cold start performance compared to the Phantom, resulting in a modification to the engine heating system.1st Feb 1929West Wittering \ T \ 2January1929-June1929  Scan133
Laboratory trials for an S.S. Sequence Starter, detailing tests on pinion engagement and jamming issues.15th Mar 1929West Wittering \ T \ 2January1929-June1929  Scan134
Experiments to fix motor engagement issues by testing additional torque, current, and different spring arrangements.15th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan135
Improvements and proposed modifications to a pinion mechanism, including test results and suggestions for new motors.15th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan136
Brief internal memorandum requesting remarks before escalating a matter to the D.O.15th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan137
Cover letter for the final report on the 18-EX car after a 10,000-mile test in France.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan138
18-EX car after a 10,000 miles test in France, detailing engine performance and component conditions.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan139
Condition and issues of various engine components following a 5000-mile test.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan140
Continued test report page detailing the condition of a radiator, shutters, bonnet, oil pump, fan, axle, brakes, and springs.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan141
Test report page detailing the performance and condition of various vehicle components including axles, steering, clutch, and brakes.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan142
The post-test condition of various vehicle components, including brakes, dampers, petrol tank, and subframe.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan143
Test report summary on the performance of the bodywork, windows, and semi-isolation scheme.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan144
Investigating bearing failures on 'F' engines, attributing the cause to faulty oil supply installation.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan145
F. engine installation issues, comparing service machines to an experimental machine.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan146
Experiments with 'SS' engine feet fitted to a 20-EX experimental car.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan147
Trials on the 'SS' Sequence Starter, concerning the effect of voltage on corner jamming failures.19th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan148
Standardisation of wheel rim sizes for 'SS' cars, comparing 20' and 21' options.20th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan149
Proposed improvements and ongoing tests for the 21-EX car, focusing on engine feet, frame twisting, and exhaust noise.27th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan150
Engine and exhaust noise issues and arrangements for the 21-EX car.20th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan151
Listing parts to be fitted to the 21-EX Car chassis before testing.20th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan152
Numbered list of vehicle modifications and features, continued from a previous page.28th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan153
The results of comparative life tests on switchbox and cut-out contacts.28th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan154
Life tests conducted on a 20 HP switchbox.23th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan155
Test report detailing the failure analysis of electrical cut-out points under different breaking conditions.23th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan156
Continuation page of a report detailing tests on switch contacts.1st Mar 1929West Wittering \ T \ 2January1929-June1929  Scan157
Laboratory test report on a sequence starter motor and its associated switches and components.1st Mar 1929West Wittering \ T \ 2January1929-June1929  Scan158
Electrical and operational tests on a starter motor, its armature, and teazer circuit.1st Mar 1929West Wittering \ T \ 2January1929-June1929  Scan159
Grinding down a parallel armature for a trial with a LeC. damper.6th Mar 1929West Wittering \ T \ 2January1929-June1929  Scan160
The development and faults of a sequence starter motor and its switches.6th Mar 1929West Wittering \ T \ 2January1929-June1929  Scan161
Analysis of noise issues related to gear engagement, disengagement, and damper performance.6th Mar 1929West Wittering \ T \ 2January1929-June1929  Scan162
Modifications to a motor arrangement to address gear noise and pinion engagement.22th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan163
Modifications and tests on electrical motor components and switches.22th Feb 1929West Wittering \ T \ 2January1929-June1929  Scan164


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙