Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2334 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Drawing of a Chrysler rubber engine mounting system, showing rear feet and front anchorage.15th Jun 1929West Wittering \ T \ 2January1929-June1929  Scan265
Graph of Chrysler valve lift curves for the exhaust and inlet valves, plotted against crankshaft degrees.5th Jun 1928West Wittering \ T \ 2January1929-June1929  Scan266
Sketch for a proposed sheet metal bracket to support an exhaust system silencer.3rd Jul 1928West Wittering \ T \ 2July1928-December1928  Scan001
Complaints of excessive wheel arch clearance on the 20HP model and requesting tests on suggested new clearances.3rd Jul 1928West Wittering \ T \ 2July1928-December1928  Scan002
The approved colour scheme for a Barkerlite Coupe Limousine and arranging for the bonnet to be sent for painting.3rd Jul 1928West Wittering \ T \ 2July1928-December1928  Scan003
Modification of intermediate and rear step-irons, specifically requesting a length increase for 20HP pressings.1st Jul 1928West Wittering \ T \ 2July1928-December1928  Scan004
The centralised chassis lubrication system for Phantom and India models.7th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan005
Providing feedback and criticism on a car's performance, covering the engine, seats, and handling.9th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan006
Agreeing to revert to a solid lug design for the 'India 3' cast dashboard.11th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan007
Dashboard pump position for the centralised chassis lubrication system on 'India 3' models.11th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan008
Necessity of fitting low pressure tyres to the 20HP model to remain competitive.12th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan009
Design change from a three to a two bolter flange for the India 3 cylinder block water pipe connection.13th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan010
Querying discrepancies in diagrams related to hydraulic shock dampers and pressure theories.13th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan011
Directive to halt work on 'B' steering for the Phantom G.2.B series and to reduce overall car height.13th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan012
Modifications to be made to a cast dashboard for an 'India 3' car, model 12.G.4.13th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan013
Drawing for an induction pipe for India 3, to be adapted for vertical type carburettors.14th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan014
Alternative arrangements for the 'SS' rear shock damper and related modifications.14th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan015
Main switch for the EAC.10 Sequence Starter and initial production methods.14th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan016
Strengthening the 20HP piston and a specific taller version required for 'India 3'.14th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan017
Telegram discussing the replacement and strengthening of Phantom pistons due to potential breakage.16th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan018
Post Office Telegram from Royce regarding an issue with the alloy for rings.16th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan019
Requirements for fitting a Stephan Grebel spot light, a smaller headlamp, and Chrysler type wing lamps to a vehicle.16th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan020
Connection points and visual representations on a Phantom wiring diagram for a green light.16th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan021
20HP piston breakage and proposals for new piston ring designs.17th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan022
New schedules for the Phantom's centralised chassis lubrication system, specifically for a new pedal and distance pieces.17th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan023
Arrangement of headlamps, wiring, and switches for model 12.G.4 and India cars.17th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan024
Requesting a sketch of a part for a Hobson Petrol Gauge to be fitted to a new instrument patch.17th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan025
Modifications to the 'SS' battery suspension and its rear box.18th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan026
Design of 'SS' shock damper connecting rods, comparing solid versus tube construction.18th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan027
Lubrication method for the 'SS' rear damper connecting rod and the potential issue of intermingling oils.19th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan028
Decision not to take action on a fracture due to changes in the centralised chassis lubrication system.19th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan029
Responding to a query about a universal joint, detailing omissions and proposed changes to its rings and threads.19th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan030
Proposing changes to the scuttle isolation for the Phantom G.2.B. series vehicle.19th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan031
The riding qualities of Phantom and 20Hp cars, focusing on tyres and road springs.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan032
Adjustments to shock dampers and springs to improve ride quality and address complaints.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan033
The design and development of experimental pistons for 20HP and Phantom engines, focusing on new features to reduce knocking and oil consumption.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan034
Scuttle isolation for chassis 12.G.4, enclosing a marked-up blueprint and suggesting modifications.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan035
Wiring scheme for an accumulator switch and green light indicator, and the design of a delicate field fuse.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan036
Corrections to a diagram for an accumulator switch and green light scheme, and issues with a delicate field fuse.20th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan037
New scheme for the Phantom's centralised chassis lubrication system to address filter choking.21th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan038
Scheme 2660 for scuttle isolation on the 'India 3' model and requesting a dashboard alteration.21th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan039
Confirmation of a telegram requesting an urgent order for wheels, tyres, and rims.23th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan040
Modifications to Phantom piston rings to increase cylinder wall pressure.23th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan041
Report outlining potential improvements to vehicle riding qualities, focusing on tyres, springs, and shock dampers.23th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan042
Design, testing, and grinding instructions for a Pedestal Piston for India 3.24th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan043
Lubrication of the 'SS' axle control ball end and its potential application to the Phantom model.25th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan044
Clarifying design alterations to the 20HP carburetter.25th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan045
Increasing the width of cams for the valve gear.25th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan046
Modifications and protection options for the sequence starter main switch.25th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan047
Modifications and protection options for the sequence starter main switch contacts.25th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan048
Modifications to a distribution board fitted with a green lamp switch, focusing on its dimensions, materials, and component placement.26th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan049
Scheme 2665, detailing a solid cast lug to replace experimental sheet metal brackets at the bottom of the India 3 cast dash.26th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan050
Halting investigation on hydraulic shock dampers as they are functioning satisfactorily.26th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan051
Modifications to a distribution board fitted with a green lamp switch.26th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan052
The artistic and manufacturing quality of radiator mascots and filler caps for the Phantom and 20HP models, with proposed modifications.27th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan053
Correspondence regarding a drawing for exhaust pipes for the Indian market, designed to avoid compound bends.28th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan054
Secret memo detailing modifications to the 'SS' brake differentials and associated components.28th Jul 1928West Wittering \ T \ 2July1928-December1928  Scan055
Inquiry about the performance of a Zenith 60.DJ double carburetter for a 500HP engine.14th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan056
Paint and fabric mismatch on Coupe Limousine X5830 / X5260.14th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan057
Reduction of wheel arch height on a 20HP car.14th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan058
Various properties and manufacturing considerations for road springs, comparing different types.14th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan059
Expressing satisfaction with the performance of the modified new contact maker LeC. 2460.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan060
Suggesting that the project for altered cylinder construction be shelved due to its complexity.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan061
Performance and design of piston rings, comparing 'perfect circle' and 'L' shaped rings.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan062
Mr. Hall's light alloy, discussing casting difficulties and high-temperature performance.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan063
Issues with finishing a scuttle with cellulose paint and proposing alternative body mounting schemes.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan064
Performance assessment report on a vehicle, detailing issues and recommendations for various components.20th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan065
Typed evaluation report on various vehicle components and design features.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan066
Painting error on a limousine for Mr. Royce and issues with coachbuilding supervision.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan067
Division of responsibility for vehicle body design and construction between W.W. and Derby.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan068
Improving the accessibility of the Phantom's rear wheel carrier fixing bolt, with a design suggestion from Mr. Royce.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan069
Weight of a Coupe Limousine body and the added weight from various chassis modifications.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan070
Omission of tie-bars from the India 3 model frame, referencing experiments on the 'Twenty' model.22th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan071
Stock of 40/50 rear road springs and the plan to send a revised pad.24th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan072
Steering 'shiver' issues and proposed modifications for a new front axle for the India 3 model.24th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan073
Poor slow-running performance of the 20HP engine and suggesting a test with a Zenith carburettor.24th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan074
Trouble with and revised designs for the mixture adjustment on the 20HP and Phantom models.24th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan075
Proposing a change to the brake countershaft cantilever bearing on the gearbox, switching to forgings for cost reduction.28th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan076
Design and cancellation of different types of 'S.S.' pedals.28th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan077
Suggestion to change the manufacturing process for Super Sports Engine timing gears.28th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan078
Parts availability, body style proposals, and specific radiator and dash design considerations.28th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan079
Features of driving seat positions for 'C', 'D', and 'E' type steering on the 'S.S' model.28th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan080
Design changes and alternative schemes for the 'SS' radiator and cross member suspension.29th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan081
Instructions for altering EAC.10 engine timing with two new camshaft options and diagrams.30th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan082
New, larger diameter steering wheel schemes for various models.30th Aug 1928West Wittering \ T \ 2July1928-December1928  Scan083
Agreeing to a suggested alteration for the Phantom Green Light Scheme, requesting a new wiring diagram.1st Sep 1928West Wittering \ T \ 2July1928-December1928  Scan084
Different methods of headlamp dipping, specifically comparing a three-lamp system with bifocal dipping using a two-filament bulb.1st Sep 1928West Wittering \ T \ 2July1928-December1928  Scan085
'SS' starting handle gear, referencing schedule 2684 and proposing a simpler spring arrangement.5th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan086
Wheel and tyre specifications for a new 'SS' model to lower its frame height for French conditions.6th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan087
Discrepancy in 40/50 suspension test results related to shock dampers and tyre pressures.9th Oct 1928West Wittering \ T \ 2July1928-December1928  Scan088
Design and production of bodies and subframes for two EAC.10 cars.10th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan089
Technical note regarding the insulation and wiring for a green light magnet.11th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan090
Drawing and the production of models for Square Collar Nuts.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan091
Scheme 2697 for the 'SS' Front Dumb Iron and Front Horn.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan092
Scheme 2696 for passing the starting handle shaft through the 'SS' radiator.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan093
Arrangement and construction of the 'SS' front rubber buffer, referencing various N. schemes.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan094
Modifications to the operating gear for the 'SS' exhaust cutout.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan095
Alterations to the induction pipes and cylinder head for exhaust or water heating.12th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan096
Dispatch of design schemes for the 'SS' Frame, including cross members and general arrangement.13th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan097
Altering the drilling on the 'X' shaped cross member for a revised silencer support.13th Sep 1928West Wittering \ T \ 2July1928-December1928  Scan098


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙