| Description | Date | Identifier | |
| Sending a scheme with slight modifications for the J. 3. frame. | 12th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan417 | |
| Scheme 3341, which modifies the shape of the rear dumb iron, spring shackle, and frame side member. | 12th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan418 | |
| General construction scheme for the J.3. oil pump, distributor drive, and oil relief unit. | 12th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan419 | |
| J.3 front engine suspension and radiator mounting. | 12th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan420 | |
| Design change to the J.3. oil base end filter's suction pipe arrangement. | 12th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan421 | |
| The 'Peregrine' engine's full-scale drawing (LeC. 2954), its bore size, and a modification to the cylinder and crankcase design. | 14th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan422 | |
| Alterations to the 'China' crankshaft for future series. | 9th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan423 | |
| Modifications to the 'China' crankshaft, increasing web width and altering oilway drilling. | 16th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan424 | |
| Sticking and concentricity of cones in a synchro-mesh gearbox, referencing Buick's lapping instructions. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan425 | |
| Recommendation to trial a bronze stirrup to reduce friction in a gear mechanism. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan426 | |
| Sending a revised quarter-scale layout and skeleton specification for the Peregrine 2 chassis. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan427 | |
| Frame stiffness, torsional rigidity, and engine mounting, comparing approaches with Packard and Lancia. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan428 | |
| Specification sheet for the Peregrine 2 (Revised) vehicle layout. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan429 | |
| Specification sheet for vehicle components, coachwork, and suggested body styles. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan430 | |
| Making the revised Peregrine 2 chassis suitable for modern coachwork with a new six light saloon body. | 19th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan431 | |
| J.3. crankcase cover, its associated dynamo, water pump suspension, and drive coupling. | 21th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan432 | |
| Standardization of front spring pin diameters to reduce the multiplicity of parts. | 21th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan433 | |
| Alternative designs for the rear axle tube and brake gear. | 23th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan434 | |
| Scheme for a 'Locomotive Type Drake' for a J.3 model, being sent for storage. | 23th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan435 | |
| J. 3. Valve Rocker Calculation of Lift. | 23th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan436 | |
| Problem with the float for twin carburetters being too heavy and instructions for alterations. | 24th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan437 | |
| Successful development of a new synchromesh gearbox with a silent 3rd gear. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan438 | |
| Imperative use of flexible springs and adjustable shock dampers. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan439 | |
| Modifications to the 20/25 balance weights for existing forgings to reduce stress. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan440 | |
| Design of a J.3. oil level indicator for use on the Peregrine engine. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan441 | |
| Letter about a blueprint for crankshaft and crankcase modifications for a starter motor. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan442 | |
| Change in the battery and suspension arrangement for the 20/25 model. | 26th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan443 | |
| Conclusions on car engine performance, focusing on valve timing, cam design, and lift. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan444 | |
| Riding qualities of motor cars, focusing on springs and controllable dampers. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan445 | |
| Proposal for improving ride quality using a dual-valve damper system with a replenishing pipe. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan446 | |
| Conclusions on balance weights, flywheel vibrations, and crankchamber deflections. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan447 | |
| Carburettor trials and future development plans for various designs, including up-draught and down-draught types. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan448 | |
| Suggestion and cost-benefit of using Austenitic steel for car cylinder liners. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan449 | |
| Dispatch of drawings for a redesigned J.3 crankcase and an attached print for the dynamo drive and lubrication. | 28th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan450 | |
| Prints for a crankcase, detailing the oil pump, suspension, and starter motor. | 29th Sep 1931 | West Wittering \ V \ March1931-September1931 Scan451 | |
| Modifications and improvements to the engine cooling system, including shutters, radiator, and louvres. | 1st Oct 1930 | West Wittering \ V \ October1930-February1931 Scan001 | |
| Various schemes and problems related to gearbox design. | 1st Oct 1930 | West Wittering \ V \ October1930-February1931 Scan002 | |
| Comparison and critique of various gearbox designs, including epicyclic, Wilson, Salerni, and spool gears. | 1st Oct 1930 | West Wittering \ V \ October1930-February1931 Scan003 | |
| Confidential memo discussing car body booming issues, the potential of all-steel bodies, and comparisons to American manufacturers. | 1st Oct 1930 | West Wittering \ V \ October1930-February1931 Scan004 | |
| Confidential memo detailing solutions for crankshaft vibration in the 25HP engine at high speed. | 1st Oct 1930 | West Wittering \ V \ October1930-February1931 Scan005 | |
| Conference report outlining the accuracy limits and specifications for a vehicle subframe. | 2nd Oct 1930 | West Wittering \ V \ October1930-February1931 Scan006 | |
| Specifications and procedures for chassis, subframe, and body assembly. | 2nd Oct 1930 | West Wittering \ V \ October1930-February1931 Scan007 | |
| Suitability of French Marchel headlamps over Lucas lamps, in light of a new French law. | 2nd Oct 1930 | West Wittering \ V \ October1930-February1931 Scan008 | |
| Outlining the objectives and current status of various vehicle improvements. | 22th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan009 | |
| Visit to the Pressed Steel Body Co. to investigate three different types of all-steel body construction. | 4th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan010 | |
| Investigation into all-steel car bodies, specifically the Budd system, for potential use on the 25HP model. | 10th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan011 | |
| Modifications to the 'C' steering system to improve body space and comfort. | 10th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan012 | |
| Alternative layouts for the N. 2 Series instrument board on different chassis types. | 10th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan013 | |
| Modifications to the scuttle of a body to fit a revised radiator and bonnet on a Phantom II. | 10th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan014 | |
| Cover memo for an enclosed print showing the 25HP clutch. | 11th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan015 | |
| The construction of a specimen 3rd speed epicyclic train for testing a revised gearbox. | 14th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan016 | |
| Requesting a progress update on experiments related to pedal stems and bonnets. | 10th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan017 | |
| Proposal for a new louvred bonnet design, scheme 3153, with improvements over the 14-EX model. | 11th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan018 | |
| Instructions to stop the 25HP flywheel job and modify the bonnet louvres. | 11th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan019 | |
| Short memo regarding sending drawings (LeCs. 2830/1) for the 25HP Clutch. | 13th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan020 | |
| Revised epicyclic 3rd speed gearbox and associated drawings. | 13th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan021 | |
| Improvements to radiators and bonnets, including square tubes, overflow valves, and bonnet vents. | 14th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan022 | |
| Schemes for a revised epicyclic 3rd speed gearbox. | 16th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan023 | |
| Modification to the P.2. Bonnet side panel to create a continuous body line, addressing criticisms from Sales and coachbuilders. | 16th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan024 | |
| Confidential memo on Motor Show impressions, discussing design costs, manufacturing efficiency, and supplier quality. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan025 | |
| Engine performance, future design considerations including a 12-cylinder engine, and proposals for future car models. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan026 | |
| Engine mounting options, superchargers, gearboxes, and the 25HP model. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan027 | |
| Reduction of flywheel vibration on a 25HP engine. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan028 | |
| Cost-saving measures by discontinuing part number stamping and simplifying drawing dimensions. | 23th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan029 | |
| Modifications to the wheels of the Phantom II. | 24th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan030 | |
| Scheme 3157 for vacuum control and operation of top and 3rd gear jaw clutches, which supersedes scheme 3151. | 25th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan031 | |
| Criticisms and potential improvements for bonnets and radiators. | 25th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan032 | |
| Design elements including the crankcase oil filler cap, mascot, and bonnet louvres. | 25th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan033 | |
| Revised drawing for an epicyclic third speed gearbox, noting a design change and a delay with previous prints. | 25th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan034 | |
| Instrument board layout for 'C' and 'D' type steering. | 27th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan035 | |
| Thermostat modifications and their effect on engine performance and petrol consumption. | 27th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan036 | |
| Log of temperature readings from a 25EX thermostat test. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan037 | |
| Test results for a 24 EX thermostat, including temperature readings and radiator shutter operation points. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan038 | |
| Test report for a thermostat marked 'A', with temperature readings and radiator shutter operation points. | 20th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan039 | |
| Operating temperatures for the 25EX Thermostat. | 21th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan040 | |
| Hand-drawn sketch of a tube/pipe cross-section with a circled feature, alongside handwritten valve timing notes. | 5th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan041 | |
| Acceleration test results for vehicle 19EX at water temperatures of 60°C and 70°C. | 5th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan042 | |
| Modification to the jaw clutches in the revised epicyclic third speed gearbox. | 29th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan043 | |
| Specifications for a 'Car for R', covering body track, bonnet, chassis, lamps, and delivery schedule for France. | 29th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan044 | |
| Superseded internal memo indicated by a 'RECEIVED' stamp and handwritten notes. | 31th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan045 | |
| Modification to the 1st speed dogs for the all-epicyclic gearbox, scheme 3159. | 29th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan046 | |
| New untarnishable metal called 'Silveroid' for body fittings, noting its use by Crossley's. | 29th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan047 | |
| Required design features for future 25HP models regarding axle, springing, engine mounting, and bodywork. | 29th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan048 | |
| Vehicle ride characteristics, performance, and body design considerations. | 30th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan049 | |
| Proposal for a combined direct, electric, and mechanically geared change gear system. | 30th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan050 | |
| List of required accessories and specifications for car 27-EX. | 30th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan051 | |
| The revised Epicyclic 3rd speed gearbox and the experimental arrangement of its oil pump and lubrication jet. | 31th Oct 1930 | West Wittering \ V \ October1930-February1931 Scan052 | |
| Modifications and specifications for the Epicyclic 3rd speed gearbox. | 11th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan053 | |
| Various novel gear changing mechanisms and transmission technologies. | 11th Mar 1930 | West Wittering \ V \ October1930-February1931 Scan054 | |
| Evaluation of various gearbox and transmission schemes, including historical attempts and future plans. | 11th Mar 1930 | West Wittering \ V \ October1930-February1931 Scan055 | |
| The design of a new 4-speed gearbox, detailing its semi-silent, easy-change features. | 13th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan056 | |
| Three schemes for the revision of the 25HP 'Japan' engine. | 13th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan057 | |
| Proposed re-arrangement of the 25HP frame, cross members, and brake gear per scheme 3162. | 1st Nov 1930 | West Wittering \ V \ October1930-February1931 Scan058 | |
| Modifications and additions to a revised epicyclic third speed gearbox. | 14th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan059 | |
| Letter to Park Ward & Co. detailing the final finish and interior specifications for Sir Henry Royce's car, 27EX. | 5th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan060 | |
| Car interior fittings and design specifications, including sketches. | 6th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan061 | |
| Chassis 27-EX for Sir Henry Royce, coordinating body mounting with Park Ward and component fitting. | 6th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan062 | |
| Revised epicyclic 3rd speed gearbox and the feasibility of fitting an 8.5' fabric coupling. | 7th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan063 | |
| Revisions to the epicyclic 3rd speed gearbox and modifications to the servo and brake arrangements. | 10th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan064 | |
| From DA to HS requesting remarks on criticisms regarding reduced controls on the steering column. | 7th Nov 1930 | West Wittering \ V \ October1930-February1931 Scan065 | |
| | | | |