Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2167 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Slow progress on the Bensport engine supercharger project and potential suppliers.4th Oct 1932Box 179b \ 1  img100
Technical discussion on Bensport brakes, considering increased drum size and automatic adjustment for high-speed cars.4th Oct 1932Box 179b \ 1  img101
Lockheed braking system's intensifier and the potential for adding a forward-only servo.1st Oct 1932Box 179b \ 1  img102
Overheating exhaust valve guides and suggesting salt cooling as a remedy.1st Oct 1932Box 179b \ 1  img103
Testing of three modified clutches, resolving faults like pedal vibration, and proposing a patent for the improved mechanism.4th Oct 1932Box 179b \ 1  img104
Semi-hydraulic brake system for motorcars for patent purposes.1st Oct 1932Box 179b \ 1  img105
Modifications for 'C', 'D', 'E', and 'F' type chassis prints.26th Oct 1932Box 179b \ 1  img106
Obsolescence of certain body drawing prints and requesting new ones.7th Oct 1932Box 179b \ 1  img107
Car body life, the removal of the body subframe, and its impact on chassis rigidity.7th Oct 1932Box 179b \ 1  img108
Outlining the causes for a delay in delivering a car body and a revised delivery date.7th Oct 1932Box 179b \ 1  img109
Design changes and specifications for the Bentcroft radiator.10th Oct 1932Box 179b \ 1  img110
Drawing for a radiator matrix and a request to test an alternative Harrison Matrix design.12th Oct 1932Box 179b \ 1  img111
Design changes to the sloping footboard for the Bensport model.12th Oct 1932Box 179b \ 1  img112
Communication breakdown and responsibilities concerning coachwork by Park Ward & Co.12th Oct 1932Box 179b \ 1  img113
Modifications to the 25HP clutch to align with improvements for the Peregrine and P.2 models.17th Oct 1932Box 179b \ 1  img114
Cause of rattles in Peregrine bodies, attributing it to hydraulic shock dampers and debating chassis rigidity vs. body construction.13th Oct 1932Box 179b \ 1  img115
Car body strength, weight, and construction, comparing them to American equivalents and debating future modifications.17th Oct 1932Box 179b \ 1  img116
Alterations and approvals for a chassis dynamo vibrator regulator and its components.17th Oct 1932Box 179b \ 1  img117
Merits and procurement options for different types of engine blowers.17th Oct 1932Box 179b \ 1  img118
Modifications and specifications for the Bensport radiator and shutters.21th Oct 1932Box 179b \ 1  img119
Modification of a Bensport bonnet fitting to be located at the dash.19th Oct 1932Box 179b \ 1  img120
Properties and potential uses of zinc die casting metal for car parts.21th Oct 1932Box 179b \ 1  img121
Design work and patents for a semi-expanding carburetter and a shock damper.22th Oct 1932Box 179b \ 1  img122
Novel brake system design for the Bensport model, considering hydraulic transmission and patentability.10th Oct 1932Box 179b \ 1  img123
Novel clutch actuation system and proposed future work on an epicyclic gearbox for the 'Spectre' project.24th Oct 1932Box 179b \ 1  img124
Issues with Kelloch brakes and proposing new schemes for hydraulically operated brakes to prevent fluid leaks.24th Oct 1932Box 179b \ 1  img125
Various engine options for a chassis, comparing the J.1, Peregrine, and a supercharged variant.24th Oct 1932Box 179b \ 1  img126
Technical memorandum discussing the design of a blower, gear types, and drive mechanisms.30th Apr 1940Box 179b \ 1  img127
'Spectre' engine's 3.250' bore and making its parts interchangeable with the Bensport (J.1.) engine.24th Oct 1932Box 179b \ 1  img128
Alternate proposals for a torsionally flexible coupling, comparing rubber and fabric types.27th Oct 1932Box 179b \ 1  img129
Different scheme for hydraulically operated brakes, comparing it to a Lockheed system.27th Oct 1932Box 179b \ 1  img130
Technical memorandum regarding the Bensport change gear tower and lever.28th Oct 1932Box 179b \ 1  img131
Modifications to a brake system for 14-inch diameter brake drums.28th Oct 1972Box 179b \ 1  img132
Investigation of a higher ratio gear for the Peregrine casing rear axle.1st Oct 1932Box 179b \ 1  img133
Modifications to the 14' front brake drums and associated components.29th Oct 1932Box 179b \ 1  img134
Proposal to strengthen the gearbox's 3rd motion shaft following a failure, detailing modifications.2nd Nov 1932Box 179b \ 1  img135
Development, testing, and commercial strategy for the Bensport engine.2nd Nov 1932Box 179b \ 1  img136
Development of governor-controlled shock dampers, patent considerations, and design interchangeability.2nd Nov 1932Box 179b \ 1  img137
Design considerations for the Bensport hydraulic brake transmission system.2nd Nov 1932Box 179b \ 1  img138
Methods for returning oil from actuating cylinders using engine vacuum.2nd Nov 1932Box 179b \ 1  img139
Confirming a conversation about the coachwork and testing of experimental cars.2nd Nov 1932Box 179b \ 1  img140
Proposed revisions to the Bensport clutch and flywheel for the J.1. engine.24th Nov 1932Box 179b \ 1  img141
Revised layout and modifications for installing a J.1 engine into a Bensport frame.24th Nov 1932Box 179b \ 1  img142
Proposing modifications to the Bensport cross steering levers and suggesting the removal of the leather cover.24th Nov 1932Box 179b \ 1  img143
Memo discussing progress on Peregrine bodies, outlining delivery dates, and requesting a sample wheel nut from Park Wards.5th Nov 1932Box 179b \ 1  img144
The design and specifications of the Bentsport gearbox, including its servo, governor, and speedometer.5th Nov 1932Box 179b \ 1  img145
Need for hydraulic presses of 5 to 25 tons capacity for production economy.27th Nov 1932Box 179b \ 1  img146
Technical analysis on the design and performance considerations for starter motors.7th Nov 1932Box 179b \ 1  img147
Oil temperature issues and potential cooling solutions for the Peregrine engine.7th Nov 1932Box 179b \ 1  img148
Listing drawings for three crossmembers, with a note that further information on brake linkage will follow.27th Nov 1932Box 179b \ 1  img149
Two alternative designs for the Bensport (J.1.) rear engine suspension.7th Nov 1932Box 179b \ 1  img150
Scheme 3583, concerning the arrangement of the starting handle and front crossmembers.1st Nov 1932Box 179b \ 1  img151
Proprietary servo system design with two freewheels and its patentability.7th Nov 1932Box 179b \ 1  img152
Design and layout of the instrument board for a new car programme, including a sketch.10th Nov 1932Box 179b \ 1  img153
Modifications to the Bensport gearbox to fix the excessive overhang of the 2nd speed slider.12th Nov 1932Box 179b \ 1  img154
The design of a Bensport hand brake lever, focusing on sealing the floorboards and preventing rattles.12th Nov 1932Box 179b \ 1  img155
Final design and suspension of the B.3. radiator bottom tank.12th Nov 1932Box 179b \ 1  img156
Design for an instrument board, including speedometer, tachometer and shock damper controls.14th Feb 1932Box 179b \ 1  img157
Confirming layout dimensions for B.3, including the dash, gearbox, and distribution box.15th Nov 1932Box 179b \ 1  img158
Design considerations for aero engines, including cylinder blocks, crankshafts, and balance weights.15th Nov 1932Box 179b \ 1  img159
Engine improvements, materials, reliability, and performance ratings for various aircraft.16th Nov 1932Box 179b \ 1  img160
The strengthening of the Bensport Gearbox 1st and 3rd motion shafts.16th Nov 1932Box 179b \ 1  img161
Expressing a preference for the stroke proportions on a 5.5 engine, referencing the Kestrel engine.16th Nov 1932Box 179b \ 1  img162
Design recommendations and considerations for torque reaction dampers.16th Nov 1932Box 179b \ 1  img163
Bensport brake differentials and the use of an aluminum outer casing.16th Nov 1932Box 179b \ 1  img164
Modifications to the Bensport clutch operation for the J.1 engine.16th Nov 1932Box 179b \ 1  img165
Outlining further ideas for a hydraulic brake operation system, including patentable features, with reference to accompanying diagrams.16th Nov 1932Box 179b \ 1  img166
Vacuum servo diagram for patent investigation.16th Nov 1932Box 179b \ 1  img167
Outlining three design suggestions for a forward-only servo mechanism.16th Nov 1932Box 179b \ 1  img168
Alternative method for a hydraulic brake actuating cylinder with automatic adjustment.16th Nov 1932Box 179b \ 1  img169
Modifications to the Bensport Radiator to resolve clearance issues with the brake levers.16th Nov 1932Box 179b \ 1  img170
Improvements to dampers, flywheel pulleys, and hubs.17th Nov 1932Box 179b \ 1  img171
Agreement on the 5.5' X 6' engine dimensions, establishing the Griffon engine with a 30% capacity increase over the Kestrel.17th Nov 1932Box 179b \ 1  img172
On the hydraulic operation of brakes, concerning a separate valve for replenishment and thermal relief.17th Nov 1932Box 179b \ 1  img173
Moving the suspension and brake levers to prevent them fouling the radiator.18th Nov 1932Box 179b \ 1  img174
The search for a new tradesman and equipment requirements for the Coachwork Department in Derby.19th Nov 1932Box 179b \ 1  img175
Request for a copy of a document concerning the valve arrangement for J.3. shock dampers.19th Nov 1932Box 179b \ 1  img176
Layout and selection of instruments for the first Bensport instrument board.19th Nov 1932Box 179b \ 1  img177
Arrangements for the collection and mounting of a Peregrine car body with coachbuilder Park Ward.19th Nov 1932Box 179b \ 1  img178
Brake and servo scaling issues and proposed solutions for Peregrine and Bensport models.19th Nov 1932Box 179b \ 1  img179
Design decisions for a new servo mechanism, weighing options and detailing improvements over previous models.3rd Nov 1922Box 179b \ 1  img180
Aero engine design choices for a new model, including bore/stroke ratios, cylinder construction, and liners.19th Nov 1932Box 179b \ 1  img181
Advantages of hard surface liners and comparing different reduction gear types.30th Apr 1914Box 179b \ 1  img182
Potential improvements and tests for a vibrator control system.19th Nov 1932Box 179b \ 1  img183
Slight modification to the Bensport gearbox hand brake lever fulcrum pin.22th Nov 1972Box 179b \ 1  img184
Design of the front floorboards and gearbox tower cover for a 'Benspoilt (B.3)' model.22th Nov 1932Box 179b \ 1  img185
Modifications to the floorboard and gearbox layout due to an engine change, referencing specific drawings.24th Nov 1932Box 179b \ 1  img186
Dimensions and positioning of the gear and brake levers for a Bensport model with side levers.24th Nov 1932Box 179b \ 1  img187
Responding to a request for chassis and body specifications, detailing various drawing numbers and corrections.25th Nov 1932Box 179b \ 1  img188
Design changes and specifications for various car components.25th Nov 1932Box 179b \ 1  img189
Specification document detailing the components and assembly instructions for the first car of a model.25th Nov 1932Box 179b \ 1  img190
Five observations and difficulties regarding a proposed modification to the Peregrine II steering column.29th Feb 1932Box 179b \ 1  img191
Modifications to the Bensport gearbox's 2nd motion shaft and layshaft.29th Nov 1932Box 179b \ 1  img192
Design change for the Bentsport Gearbox, from brazed to hydraulically pressed levers on actuating shafts.29th Nov 1932Box 179b \ 1  img193
Design, features, and potential modifications of a Bensport shoe-type servo.30th Nov 1932Box 179b \ 1  img194
Design, adjustments, and modifications for the Bensport gearbox.30th Nov 1932Box 179b \ 1  img195
The arrangement of the Bensport brake servo and balancer lever.30th Nov 1932Box 179b \ 1  img196
Restriction at the governor release valve and sending a schedule for the revised damper control unit.30th Nov 1932Box 179b \ 1  img197
Naming conventions and identity of different sized aero engines.30th Nov 1932Box 179b \ 1  img198
Unsuitability of a shoe type servo and proposing a two-plate servo for the Peregrine gearbox.30th Nov 1932Box 179b \ 1  img199


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙