Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2100 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Estimate for the cost and production start for extra jigs, tools, and equipment for the 'B' series chassis.21th Aug 1936Box 171 \ 2  img241
Standardisation of Phantom III brake drums from R.R. Cylinder Iron instead of Millerite to reduce cost.7th Sep 1936Box 171 \ 2  img242
Proposal for the standardization of parts for the Phantom III 'B' series chassis, noting nil cost for extra equipment.21th Aug 1936Box 171 \ 2  img243
Standardisation of a large rear spring front anchorage bracket suitable for conversion to rubber shackles.23th Sep 1936Box 171 \ 2  img244
Cost comparison and analysis for a new part to be introduced on the 'B' series chassis.27th Aug 1936Box 171 \ 2  img245
Standardisation of the rubber part between the rear springs and rear axle to reduce tyre noise.7th Sep 1936Box 171 \ 2  img246
Cost analysis document for the standardization of a part for the 'B' series chassis.27th Aug 1936Box 171 \ 2  img247
Standardisation of Tinman's headed solid copper rivets for fixing Ferodo to brake shoes.18th Nov 1936Box 171 \ 2  img248
Standardization of parts proposal for Phantom III, including an estimated cost for extra jigs and equipment.26th Nov 1936Box 171 \ 2  img249
Standardisation of a modified H.T. rotor on the distributor for the Phantom III.26th Nov 1936Box 171 \ 2  img250
Estimate for the cost of new tools for the 'CW' series chassis.29th Nov 1935Box 171 \ 2  img251
Standardisation report for the Phantom III 'Concertina' 3rd speed coupling.26th Nov 1936Box 171 \ 2  img252
Estimated cost of extra jigs, tools and equipment for the 'C' series chassis.20th Nov 1936Box 171 \ 2  img253
Standardisation of Phantom III exhaust system to replace Staybrite exhaust lag with nickel-plated mild steel to save cost.27th Nov 1936Box 171 \ 2  img254
Standardisation of parts for the Phantom III model, detailing nil new tool costs and order series.23th Nov 1933Box 171 \ 2  img255
Standardisation of a dynamo cut-out with double contacts for the Phantom III, to reduce volt-drop and overheating.15th Jan 1937Box 171 \ 2  img256
Cost estimation for the standardisation of parts on the Phantom III chassis.29th Jan 1938Box 171 \ 2  img257
Standardisation of leather washers on the rear brake bell crank levers for the Phantom III.15th Jan 1937Box 171 \ 2  img258
Cost estimation for new tools related to the standardization of parts for the Phantom III 'D' Series chassis.12th Jan 1931Box 171 \ 2  img259
Standardisation of a split upper ball pad in the cross steering tube joint for the Phantom III to prevent low speed wobbles.15th Jan 1937Box 171 \ 2  img260
Standardisation of parts for the Phantom III, instructing new parts for the 'B' Series.28th Jan 1922Box 171 \ 2  img261
Standardisation of Parts form for the Phantom III, detailing the addition of holes in the cross frame.22th Jan 1937Box 171 \ 2  img262
Standardisation parts list for the Phantom III 'C' series chassis.28th Jul 1937Box 171 \ 2  img263
Standardisation of parts form for carbon graphitic bearings on the Phantom III electric petrol gauge.15th Feb 1937Box 171 \ 2  img264
Standardisation of parts document for the Phantom III chassis, noting no extra tool cost for 'C' series production.22th Sep 1936Box 171 \ 2  img265
Standardisation of parts regarding the clearance between inlet valves and guides.16th Mar 1937Box 171 \ 2  img266
Production note for a 'C' series chassis part, stating no new tool cost is required.27th Feb 1935Box 171 \ 2  img267
Standardisation of parts for the Phantom III, concerning 1' extra clutch pedal travel to lighten clutch pedal pressure.16th Mar 1937Box 171 \ 2  img268
Cost estimation for new tools and production notes for the 'D' series chassis.22th Mar 1926Box 171 \ 2  img269
Standardisation of K.L.G. 'Corundite' plugs (Type FE.30X) for the Phantom III.13th Apr 1937Box 171 \ 2  img270
Standardization of parts directive for the Phantom III model.11th Apr 1939Box 171 \ 2  img271
Standardisation of a stiffener plate for the copper contacts on the Phantom III starter switch to prevent failure.12th Apr 1937Box 171 \ 2  img272
Standardisation of parts document for the Phantom III, detailing tool costs and production implementation.26th Feb 1935Box 171 \ 2  img273
Standardisation of parts form for a filter gauze between the radiator bottom tank outlet and pump.16th Apr 1937Box 171 \ 2  img274
Assessment for implementing a change on the 'C' series chassis at no extra tool cost.26th Aug 1938Box 171 \ 2  img275
Standardisation of a hand brake lever with increased travel for the Phantom III.16th Apr 1937Box 171 \ 2  img276
Cost estimate for new tools for the 'D' series chassis production.11th Apr 1938Box 171 \ 2  img277
Standardisation of bell cranks with increased travel for the Phantom III front brake operation.10th May 1937Box 171 \ 2  img278
Parts standardisation document for the Phantom III, estimating the cost of new tools for the 'C' series chassis.10th Sep 1936Box 171 \ 2  img279
Standardisation of Phantom III water connections, changing the water joint washer material to Klingerite.11th Apr 1937Box 171 \ 2  img280
Parts standardisation document for the Phantom III, detailing a production change with no extra tool cost.16th Feb 1937Box 171 \ 2  img281
Standardisation of parts report for a Phantom III non-return ball valve and oil relief valve housing.3rd May 1937Box 171 \ 2  img282
Standardisation of parts document for the Phantom III, detailing a modification to a valve.28th Mar 1936Box 171 \ 2  img283
Standardisation of the Phantom III Tappet Oil Filter to resolve dismantling difficulties.30th Apr 1937Box 171 \ 2  img284
Cost estimation for new tools related to the standardisation of parts for the Phantom III.22th Sep 1936Box 171 \ 2  img285
Standardisation of stiffer rear axle shafts for the Phantom III to improve the clutch.27th May 1937Box 171 \ 2  img286
Cost estimation and production planning document for the standardization of parts on the Phantom III.20th May 1936Box 171 \ 2  img287
Standardisation of a spring for cross steering tube ball joints to exert a higher load.23th Jun 1937Box 171 \ 2  img288
Assessment for the standardization of parts for the Phantom III, noting zero tool cost.10th Apr 1939Box 171 \ 2  img289
Standardisation of Phantom III R.R.36 Main Bearing Shims.17th Jun 1937Box 171 \ 2  img290
The estimated cost of new tools for the Phantom III series.17th Jun 1937Box 171 \ 2  img291
Standardisation of parts report for the Phantom III concerning an ignition ballast resistance.17th Jun 1937Box 171 \ 2  img292
Standardization of parts document detailing estimated tool costs and production schedules.23th Apr 1937Box 171 \ 2  img293
Standardisation of a steady bracket for the ignition control tube on the Phantom III.3rd Aug 1937Box 171 \ 2  img294
Cost estimation for new tools for the Phantom III 'D' series chassis production.2nd Sep 1935Box 171 \ 2  img295
Standardisation of parts report for the Phantom III, regarding the ventilation of the ignition governor to prevent corrosion.7th Jun 1937Box 171 \ 2  img296
Cost estimation for new tools related to the standardization of Phantom III parts.17th May 1938Box 171 \ 2  img297
Standardisation of screw threaded synchromesh cones for the Phantom III.10th Jul 1937Box 171 \ 2  img298
Cost estimate for new tooling for 'E' series chassis production.2nd Aug 1937Box 171 \ 2  img299
Standardisation of an ignition coil with reversed primary connections for the Phantom III.2nd Aug 1937Box 171 \ 2  img300
Standardisation of parts form for the Phantom III 'D' series chassis.10th Aug 1936Box 171 \ 2  img301
Standardisation of Phantom III front suspension fulcrum pins and Bijur pipe coil to simplify machining and reduce costs.3rd Aug 1937Box 171 \ 2  img302
Estimate for the cost of new tools for production on the 1st chassis in the 'E' series.15th Aug 1933Box 171 \ 2  img303
Standardisation of parts for the Phantom III, concerning the propellor shaft sliding joint at the rear of the shaft.3rd Aug 1937Box 171 \ 2  img304
The standardisation of parts for the Phantom III, confirming no extra tool cost is required.9th Mar 1937Box 171 \ 2  img305
Standardisation of Phantom III filter body, filter gauze, and filter chamber plug.17th Jun 1937Box 171 \ 2  img306
Standardization of parts proposal for the Phantom III, including tool cost estimate and production notes.29th Dec 1937Box 171 \ 2  img307
Standardisation of Phantom III shock absorber rod controls to replace the 'Arens' control.11th Jun 1937Box 171 \ 2  img308
Cost estimate and production plan for new tooling for standardisation of parts on the Phantom II 'C' series chassis.11th Jun 1921Box 171 \ 2  img309
Standardisation of parts for the Phantom III, 4 port cylinder head.16th Jul 1937Box 171 \ 2  img310
Estimate for the cost of new tools for the 'D' series chassis production.25th Aug 1935Box 171 \ 2  img311
Specification document for the standardisation of a 4 port head, detailing alterations.2nd Mar 1937Box 171 \ 2  img312
Standardisation of parts for a Phantom III throttle control spring.2nd Aug 1937Box 171 \ 2  img313
Cost estimation for new tools for the 'L' series chassis production.29th May 1935Box 171 \ 2  img314
Standardisation of parts for the Phantom III, concerning hydraulic jacks, rams with loose rubbers, and standard D.W.S. pump.23th Aug 1937Box 171 \ 2  img315
Standardisation of parts for the Phantom III, regarding production of the 26th 'D' series chassis.14th Aug 1936Box 171 \ 2  img316
Standardisation of Johnson & Phillip's 'Neoprene' ozone-resisting H.T. ignition cable for the Phantom III.7th Jul 1937Box 171 \ 2  img317
Zero extra tool cost for part standardisation on the Phantom III 'E' series chassis.12th May 1937Box 171 \ 2  img318
Standardisation of the water temperature thermometer with flexible capillary for the Phantom III.16th Aug 1937Box 171 \ 2  img319
Cost and production analysis for the standardization of parts for the Phantom III Z series chassis.14th Dec 1938Box 171 \ 2  img320
Standardisation of Phantom III parts, specifically springs and steering components to improve performance and reduce cost.18th Jun 1937Box 171 \ 2  img321
Cost-saving modification recommendation for the Phantom III 'E' series chassis, reducing tool costs.12th Aug 1931Box 171 \ 2  img322
Standardisation of parts for Phantom III rear road springs.23th Aug 1937Box 171 \ 2  img323
Cost analysis and production decision regarding clips for the 'D' series chassis.6th Sep 1937Box 171 \ 2  img324
Standardisation report for a Phantom III stay between the gearbox and engine to reduce chunking.31th Aug 1937Box 171 \ 2  img325
Standardisation of parts for the Phantom III, concerning modifications to the engine and gearbox mountings.9th Dec 1936Box 171 \ 2  img326
Standardisation of parts report for a cheaper hydraulic jack tank on the Phantom III.18th Sep 1937Box 171 \ 2  img327
Standardisation proposal for Phantom III chassis hydraulic damper arms to reduce cost.19th Aug 1938Box 171 \ 2  img328
Standardisation of parts for Phantom III large differential thrust washers.24th Sep 1937Box 171 \ 2  img329
Standardisation of a water thermometer with a scale reading up to 90°C for the Phantom III.24th Sep 1937Box 171 \ 2  img330
Cost analysis for a printing cliche to be used on 'E' Series Phantom III chassis.13th Jan 1937Box 171 \ 2  img331
Standardisation of parts for the Phantom III, specifically the Clutch Driven Plate with 'Long' type compound cushion and Thermoid facings.9th Sep 1937Box 171 \ 2  img332
Cost analysis and production update for introducing a new clutch plate and associated tooling for the 'D' Series Chassis.17th Feb 1927Box 171 \ 2  img333
Standardisation of parts for a Lucas P.100 open type headlamp for the Phantom III.7th Oct 1937Box 171 \ 2  img334
The standardisation of parts for the Phantom III 'C' series chassis.9th Oct 1937Box 171 \ 2  img335
Standardisation of parts for the Phantom III rear brake intermediate shaft, lengthening the output lever by 20%.24th Sep 1937Box 171 \ 2  img336
Cost estimation and production planning for a standardized rear brake intermediate shaft.2nd Nov 1911Box 171 \ 2  img337
Standardisation of parts for an engine flexible steel coupling on a Phantom III.25th Aug 1937Box 171 \ 2  img338
Estimated cost for new tools and production details for the 'L' series chassis.10th May 1938Box 171 \ 2  img339
Standardisation of parts for the Phantom III, concerning the adjustment of side steering tube springs to prevent rattles.27th Oct 1937Box 171 \ 2  img340


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙