Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2292 of 2367        Sort by   Box   Date   Description

Filter      From        To        Search Hints      Identifier   [all]
DescriptionDateIdentifier
Modifications to the 20HP steering system to reduce road shock.1st Oct 1925West Wittering \ N \ October1925-December1925  Scan1
Requesting comparative weights for the India front axle against the old axle and stating the weight of a new forging.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan2
Design changes to the India front axle pivot and requesting a 10,000 miles bumping test.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan3
Device for curing squeaking brakes on 20.HP cars.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan4
Defects in an India Front Axle forging that are causing it to twist.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan5
Modifications to the Phantom petrol tank, specifically abandoning the weir system for a new level device and enlarging filters.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan6
The manufacturing difficulty of whitemetal lined steering nuts and a proposed solution.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan7
Mr. Royce's request to machine down a Phantom front axle to test how light it can be before becoming weak.3rd Oct 1925West Wittering \ N \ October1925-December1925  Scan8
Design modifications for the Phantom petrol tank.3rd Oct 1925West Wittering \ N \ October1925-December1925  Scan9
Potential weight-saving improvements to the brake system for the 10,000 miles Phantom car.1st Oct 1925West Wittering \ N \ October1925-December1925  Scan10
DA to HS regarding modifications for the India 10,000 miles car.3rd Oct 1925West Wittering \ N \ October1925-December1925  Scan11
Correspondence agreeing to a proposed method for fitting India rear squeak dampers.5th Oct 1925West Wittering \ N \ October1925-December1925  Scan12
With sketches proposing modifications to the India front brake dust cover.5th Oct 1925West Wittering \ N \ October1925-December1925  Scan13
Modifications and design ideas for Phantom silencers.1st Oct 1925West Wittering \ N \ October1925-December1925  Scan14
List of modifications for the Phantom Engine 'Z' series and the next car for France.6th Oct 1925West Wittering \ N \ October1925-December1925  Scan15
List of modifications for the 'Z' Series Phantom Frame and the next car destined for France.6th Oct 1925West Wittering \ N \ October1925-December1925  Scan16
List of specifications and proposed modifications for vehicle components, numbered 13 to 19.6th Oct 1925West Wittering \ N \ October1925-December1925  Scan17
List of modifications for the 'Z' Series Phantom Frame and the next car to run in France.6th Oct 1925West Wittering \ N \ October1925-December1925  Scan18
List of vehicle component specifications and design proposals, continued on page 2.2nd Oct 1925West Wittering \ N \ October1925-December1925  Scan19
Issues with Rapson tyres, their balance and contribution to steering wobble.10th Oct 1925West Wittering \ N \ October1925-December1925  Scan20
New louvered bonnet design for the Phantom, referencing scheme 2064 and car 7-EX.7th Oct 1925West Wittering \ N \ October1925-December1925  Scan21
Comparing the quietness of American Bosch, Smith, and Peerless windscreen wipers.12th Oct 1925West Wittering \ N \ October1925-December1925  Scan22
Insufficient heating on a Phantom induction pipe, proposing modifications and requesting temperature tests.12th Oct 1925West Wittering \ N \ October1925-December1925  Scan23
Modifications to the Phantom silencer, including material changes and a suggestion from Mr. Royce.12th Oct 1925West Wittering \ N \ October1925-December1925  Scan24
New design for a large worm outside pendulum lever type steering for the Goshawk model.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan25
Proposing to shorten wire wheel hubs, similar to what was done for steel artillery wheels.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan26
New design for the Phantom front axle, stub axles, and steering levers to save weight.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan27
Benefits of using a stepped dashboard for the Phantom & Goshawk models.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan28
Potential purchase of competitor cars, the Austro-Daimler and the Bentley, for analysis.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan29
Bentley 40HP car's engine and chassis compared to their own.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan30
Weight-saving campaign for the New Phantom, comparing performance to competitors, and suggesting duralumin main bearing caps.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan31
Supply difficulties with duralumin pressings for the brake carrier and suggesting proceeding with an aluminium casting.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan32
Expressing doubt about the necessity and effectiveness of air cleaners for cars on English roads.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan33
The dilution of oil with petrol, suggesting a scheme to trap it before it reaches the cylinders.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan34
Improvement of the Phantom exhaust system and a trial of a smaller aluminium silencer.10th Oct 1925West Wittering \ N \ October1925-December1925  Scan35
Implementation of a lubrication piping system to inaccessible points for owner-drivers.13th Oct 1925West Wittering \ N \ October1925-December1925  Scan36
Proposed modifications for the New Phantom chassis.15th Oct 1925West Wittering \ N \ October1925-December1925  Scan37
The delayed delivery of a New Phantom car chassis to the coachbuilders.15th Oct 1925West Wittering \ N \ October1925-December1925  Scan38
With sketches discussing modifications to Phantom pistons to resolve knocking issues.15th Oct 1925West Wittering \ N \ October1925-December1925  Scan39
Design sketch and discussion of a horizontally-slit, one-piece aluminium piston with two-bolt steel pedestals.11th Aug 1920West Wittering \ N \ October1925-December1925  Scan40
Potential overstressing of springs in the Phantom's side steering tube due to deflection allowances.17th Oct 1925West Wittering \ N \ October1925-December1925  Scan41
Letter from 'R.' to 'CJ.' regarding the decision to use a 4-speed gearbox over a 3-speed, due to buyer preference and overcoming design issues.19th Oct 1925West Wittering \ N \ October1925-December1925  Scan42
Questioning the proposed experimental work on a three-speed gearbox for the 40/50 HP chassis.16th Oct 1925West Wittering \ N \ October1925-December1925  Scan43
From R. to H.S. regarding a change to the New Phantom exhaust cutout.19th Oct 1925West Wittering \ N \ October1925-December1925  Scan44
Outlining Mr. Royce's decision not to use a multiple plate clutch arrangement for the India Front Axle.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan45
Potential modifications to the Phantom four-wheel brake system to adjust friction and prevent thumping.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan46
Proposal for a revised method of manufacturing 'India Front Springs' to increase their lifespan by adding an extra plate.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan47
Revised seating positions, pedals, and steering columns for a chassis.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan48
Sending drawings for a modified hollow dashboard, its specifications, and steering adaptations.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan49
Preliminary layout and advantages of the modified EAC.8 Phantom chassis.22th Oct 1925West Wittering \ N \ October1925-December1925  Scan50
Aero engine and chassis matters, including superchargers, engine names and magnetos.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan51
On gear reduction for aero engines, contrasting epicyclic and spur gears, and detailing the Eagle XVI design.28th Oct 1932West Wittering \ N \ October1925-December1925  Scan52
Use of artillery wheels, comparing their weight and strength to alternatives.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan53
Supplying a drawing for boxing in the change gear system on Phantom and India models to prevent fumes in bodies.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan54
Alteration to the 4-wheel brake servo spring arrangement for the Phantom & India models.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan55
The reasons for moving towards a shorter chassis and the associated design modifications.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan56
Design decisions regarding the gearbox suspension, frame, radiator, and other chassis components.19th Oct 1928West Wittering \ N \ October1925-December1925  Scan57
Internal memorandum detailing impressions from a motor show and proposed improvements for the Phantom I chassis.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan58
Results of testing Shell super light racing oil and its performance compared to thicker oils.24th Oct 1925West Wittering \ N \ October1925-December1925  Scan59
Running experience of Phantom cars, chassis weight reduction, and the development of hydraulic shock absorbers.27th Oct 1925West Wittering \ N \ October1925-December1925  Scan60
Proposal for revised springs in a side steering tube, comparing the stress levels of the existing and proposed designs.27th Oct 1925West Wittering \ N \ October1925-December1925  Scan61
Expressing opinions on car body design, specifically avoiding heavy, top-heavy, and cramped bodies.27th Oct 1925West Wittering \ N \ October1925-December1925  Scan62
Scheme 2066 for 'India Steering', detailing layout, limitations, and a proposed experimental steering lever for the New Phantom.28th Oct 1925West Wittering \ N \ October1925-December1925  Scan63
Strategies for reducing the weight of various chassis and engine components for the EAC. 8. model.29th Oct 1925West Wittering \ N \ October1925-December1925  Scan64
Expressing disapproval of a trial car body's weight and the use of a smaller-than-standard steering wheel.29th Oct 1925West Wittering \ N \ October1925-December1925  Scan65
Confirmation to use screwed-in valve seats from the RR. F.X. design for the Eagle 16 cylinder head.30th Oct 1925West Wittering \ N \ October1925-December1925  Scan66
Factors affecting Phantom braking distances, such as pedal operation speed and its influence on the servo system.31th Oct 1925West Wittering \ N \ October1925-December1925  Scan67
With sketches requesting tests on four different induction pipe and carburettor systems for the EAC engine.1st Nov 1925West Wittering \ N \ October1925-December1925  Scan68
From 'R' to 'HS' outlining the progress and expected completion of various design and experimental projects.2nd Nov 1925West Wittering \ N \ October1925-December1925  Scan69
Scheme N. 2077 for a radiator with integral shutters, comparing it to the previous 'W' series.3rd Nov 1925West Wittering \ N \ October1925-December1925  Scan70
Modifications to the radiator suspension, cross member, and engine supporting arms for scheme 2076.3rd Nov 1925West Wittering \ N \ October1925-December1925  Scan71
Accelerator pedal layout for 'C' and 'D' type models, noting a control rod modification.11th Nov 1925West Wittering \ N \ October1925-December1925  Scan72
Scheme 2084, a full-sized layout confirming engine position in the frame.4th Nov 1925West Wittering \ N \ October1925-December1925  Scan73
Layout of 'B' type pedals with reference to scheme 2072.4th Nov 1925West Wittering \ N \ October1925-December1925  Scan74
Different positions of the 'W' series accelerator pedal, referencing scheme 2078.5th Nov 1925West Wittering \ N \ October1925-December1925  Scan75
Alternative radiator suspension design, N.scheme 2086, using spherical supports.7th Nov 1925West Wittering \ N \ October1925-December1925  Scan76
Proposal for a new hydraulic shock damper for the Phantom model, detailing necessary modifications.7th Nov 1925West Wittering \ N \ October1925-December1925  Scan77
Modification to the F.10 engine specification, increasing the stroke, capacity, and power output.7th Nov 1925West Wittering \ N \ October1925-December1925  Scan78
Request for various parts to be sent to Barkers for an Experimental Cabriolet, including a suggestion for an electric screen wiper.7th Nov 1925West Wittering \ N \ October1925-December1925  Scan79
Instructions for oil fittings and piping on the Eagle 16 test engine.9th Nov 1925West Wittering \ N \ October1925-December1925  Scan80
Carburetter options for the Eagle 16 engine.1st Nov 1925West Wittering \ N \ October1925-December1925  Scan81
Postponing instructions for the Eagle 16 engine's ignition wire fittings and screening.9th Nov 1925West Wittering \ N \ October1925-December1925  Scan82
Proposing the standardization of a new switchbox design for 40/50 & 20HP models.10th Nov 1925West Wittering \ N \ October1925-December1925  Scan83
Parts required to complete chassis 9-PK, an Enclosed Limousine, at Hoopers coachbuilders.11th Nov 1925West Wittering \ N \ October1925-December1925  Scan84
On the reasoning for introducing a stepped dashboard and its impact on the steering column, scuttle, and bonnet length.11th Nov 1925West Wittering \ N \ October1925-December1925  Scan85
Observations on seating arrangements for passenger and driver comfort, and personal notes on tyre preferences.12th Nov 1925West Wittering \ N \ October1925-December1925  Scan86
Scheme 2087, showing the outline for an India front axle side steering lever with an experimental ball end.12th Nov 1925West Wittering \ N \ October1925-December1925  Scan87
The mounting of a new hydraulic shock absorber for the 40/50 model.13th Nov 1925West Wittering \ N \ October1925-December1925  Scan88
Layout and shortening of the side steering tube.13th Nov 1925West Wittering \ N \ October1925-December1925  Scan89
Standard steering wheel and seat dimensions, with a proposal for a new trial wheel design.16th Nov 1925West Wittering \ N \ October1925-December1925  Scan90
New front axle design for the Phantom to reduce steering wobbles.16th Nov 1925West Wittering \ N \ October1925-December1925  Scan91
From R. to EFC requesting a report on the Sequence Starter.17th Nov 1925West Wittering \ N \ October1925-December1925  Scan92
Cold weather testing in France, focusing on carburation, induction pipes and the viscosity of lubricating oil.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan93
Proposal to delete ribs from Phantom brake drums for a weight reduction campaign.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan94
Awaiting the results of modified pistons designed to increase skirt flexibility and prevent knocking.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan95
Drawing LeC. 2169 for a crankcase breather.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan96
Steering, tyre pressures, and proposed improvements to axle and suspension.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan97
Design adjustments and component specifications for a chassis.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan98
Confidential memorandum detailing the features and improvements of a new chassis, EAC. 1.24th Nov 1925West Wittering \ N \ October1925-December1925  Scan99
Testing an increased diameter tie-rod to improve frame stiffness and considering a redesign of the 40/50 gearbox.18th Nov 1925West Wittering \ N \ October1925-December1925  Scan100


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙