Design and implementation of a spare wheel carrier in the tail of the Phantom model.17th Oct 1927Box 68 \ 3  scan0133
Design of a Phantom spare wheel carrier at the rear.20th Oct 1927Box 68 \ 3  scan0134
Supply and design of a Phantom rear wheel carrier.22th Oct 1927Box 68 \ 3  scan0135
New schedule for a rear wheel carrier, including material options and alterations.27th Oct 1927Box 68 \ 3  scan0136
Design change note about the removal of the sheet aluminium cover forward of the spare wheel.1st Nov 1927Box 68 \ 3  scan0137
Rattling issue with the spare wheel carrier and proposing a solution involving a clip and rubber pad.16th Nov 1927Box 68 \ 3  scan0138
Arranging for sales officials to view a new Phantom rear wheel carrier and luggage grid design.21th Nov 1927Box 68 \ 3  scan0139
Examination of a Phantom wheel carrier and narrower radiator before export to France.28th Nov 1927Box 68 \ 3  scan0140
Development and production of the Phantom Sports Chassis, including radiator and spare wheel carrier modifications.17th Dec 1927Box 68 \ 3  scan0141
Progress report on part improvements and testing for a Phantom car, including the radiator and rear wheel carrier.30th Dec 1927Box 68 \ 3  scan0142
Inquiry regarding the availability of the 'Phantom' Wheel Carrier and Luggage Grid.30th Dec 1927Box 68 \ 3  scan0143
Sending a car fitted with a rear wheel carrier to London for a visit to Faireys and Stag Lane Aerodrome.30th Dec 1927Box 68 \ 3  scan0144
The removal and reallocation of spare wheel fittings from Chassis No. 7-EX.7th Feb 1928Box 68 \ 3  scan0145
Use of rear spare wheel carriers for F.2B and G.2 series models.24th Feb 1928Box 68 \ 3  scan0146
Knocking issue with the spare wheel carrier on the Phantom model, its causes, and a suggested solution.9th Mar 1928Box 68 \ 3  scan0147
The issues with the rear spare wheel carrier and proposed modifications.9th Mar 1928Box 68 \ 3  scan0148
Page describing measurements of relative movement between the body and frame at the rear of a vehicle.13th Mar 1928Box 68 \ 3  scan0149
Issues with an elusive knock and proposed changes to the Phantom spare wheel carrier.13th Mar 1928Box 68 \ 3  scan0150
Rigidity and accessibility issues of rear wheel carriers for the Phantom and 20 HP models.20th Apr 1928Box 68 \ 3  scan0151
Sending a picture of a combined spare wheel and travel-trunk carrier.23th May 1928Box 68 \ 3  scan0152
Design and rattling issues of the Phantom's rear wheel and luggage carrier.19th Jun 1928Box 68 \ 3  scan0153
The inaccessible fixing bolt on the Phantom rear wheel carrier and a suggested design improvement.1st Aug 1928Box 68 \ 3  scan0154
Incompatibility of the 40/50 HP spare wheel carrier with various tyre makes and proposing a modification.24th Oct 1929Box 68 \ 3  scan0155
Cover for a report on an Epicyclic Reduction Gear.8th May 1925Box 68 \ 3  scan0156
Details on the reduction gear ratios for the EAC.II starter motor.29th Sep 1924Box 68 \ 3  scan0157
New parts and alterations for a Starter Motor Drive Reduction Gear.3rd Dec 1924Box 68 \ 3  scan0158
Modification to the Reduction Gear EAC.II and halting the production of specific parts.11th Dec 1924Box 68 \ 3  scan0159
Alterations to drawings for the EAC.II reduction gear.24th Dec 1924Box 68 \ 3  scan0160
Secret memorandum detailing modifications to a fabric engine coupling and epicyclic starter gear for the 'V' series.9th Jan 1925Box 68 \ 3  scan0161
Design modifications to gears, shafts, and bearings to improve strength and accommodate increased loads.13th Jan 1925Box 68 \ 3  scan0162
Query regarding a potential modification to the helix angle on a modified EAC.II Starter Motor Bendix Shaft.13th Jan 1925Box 68 \ 3  scan0163
The gear reduction ratios for an EAC starter motor.19th Jan 1925Box 68 \ 3  scan0164
Requesting a comparative trial for a starter epicyclic gear with alternative threads and a specific helix angle.28th Jan 1925Box 68 \ 3  scan0165
Outlining the revised arrangement and construction plans for the EAC Silent Starter Motor Scheme, including switchgear and mechanical parts.23th Oct 1925Box 68 \ 3  scan0166
Modifications to the New Phantom starter drive, including a change in reduction ratio.30th Dec 1925Box 68 \ 3  scan0167
File cover for a 28 Slot Armature.18th Jan 1927Box 68 \ 4  scan0001
Statement concerning the adoption of an armature with 28 slots and 56 coils, with one of the coils being a lap coil.18th Jan 1927Box 68 \ 4  scan0002
The calculation of conductor pitch and commutator connections for coils.1st Apr 1927Box 68 \ 4  scan0003
Instruction to experimentally make two 28 slot armatures for a 40/50 HP dynamo to address a noise issue.1st Apr 1927Box 68 \ 4  scan0004
Proposal to trial a new 28 slot armature for the Phantom Dynamo to reduce noise.25th Apr 1927Box 68 \ 4  scan0005
The performance and testing of the 40/50 N.B. type dynamo with an altered brush arrangement.9th May 1927Box 68 \ 4  scan0006
Recommendation for machine re-arrangement and standardisation of brushes.9th May 1927Box 68 \ 4  scan0007
Extract discussing issues and experiments with N.B. machines, armatures, and dynamos.4th Jun 1927Box 68 \ 4  scan0008
New 28-slot armature for the Phantom dynamo, requesting a noisy machine for preliminary testing.9th Jun 1927Box 68 \ 4  scan0009
Request to fit a 28 slot armature to a faulty 40/50 dynamo.13th Jun 1927Box 68 \ 4  scan0010
The required alteration to a Phantom Dynamo 28 slot armature.17th Jun 1927Box 68 \ 4  scan0011
Instruction to minimise the milling depth of dynamo armature slots to improve the magnetic circuit.27th Jun 1927Box 68 \ 4  scan0012
Trial of a modified, less noisy TH65 dynamo for Phantom models.27th Jun 1927Box 68 \ 4  scan0013
Responding to a report on a Phantom Dynamo with a 28 slot armature, discussing noisy brushes and high output.27th Jun 1927Box 68 \ 4  scan0014
Instructions and test results for a 28-slot armature in a dynamo.11th Jul 1927Box 68 \ 4  scan0015
Instruction concluding that for a 28-slot armature in a standard carcase, the B angle must be 9.5 degrees.29th Jun 1920Box 68 \ 4  scan0016
Required alteration to the commutator position on a 40/50 HP dynamo 28-slot armature.12th Jul 1927Box 68 \ 4  scan0017
From EFC to RHC requesting alterations to two 40/50 dynamos.1st Aug 1927Box 68 \ 4  scan0018
Test results for a 28 slot armature for a 40/50 Dynamo, detailing adjustments and performance at different 'B angles'.8th Aug 1927Box 68 \ 4  scan0019
Urgent requirement for the 28 slot armature for the Phantom dynamo.18th Aug 1927Box 68 \ 4  scan0020
Requesting two 28 slot armatures for a 40/50 dynamo be slightly skimmed due to unevenness.20th Aug 1927Box 68 \ 4  scan0021
Performance curve graph for a 40/50 HP Dynamo, plotting ampere output and operating voltage against dynamo RPM.18th Oct 1927Box 68 \ 4  scan0022
Instructions detailing tests performed on a 28 slot armature in a standard (NB) machine.18th Oct 1927Box 68 \ 4  scan0023
Instruction sheet detailing performance test results for three different armatures.8th Dec 1924Box 68 \ 4  scan0024
Graph plotting Dynamo ampere output and operating voltage against Dynamo RPM and chassis MPH.3rd Nov 1927Box 68 \ 4  scan0025
Standardising 28 slot armatures for 20 HP and 40/50 HP dynamos to cure noise issues.3rd Nov 1927Box 68 \ 4  scan0026
Technical memorandum discussing noise and heating improvements in N.B. machines.3rd Nov 1927Box 68 \ 4  scan0027
Standardization and production of the N.B. type dynamo for the 40/50 chassis, detailing testing and noise issues.3rd Nov 1927Box 68 \ 4  scan0028
Experimental proof for the use of 28 slot armatures on 40/50 HP dynamos.16th Nov 1927Box 68 \ 4  scan0029
The dynamos for the 40/50 HP chassis, focusing on the commutator and a narrow brush machine.21th Nov 1927Box 68 \ 4  scan0030
Programme of work for testing a 28 slot armature on an N.B. machine.10th Jan 1928Box 68 \ 4  scan0031
Alteration of 28 slot armatures for 40/50 NB machines.26th Jan 1928Box 68 \ 4  scan0032
The alteration of three 28-slot armatures.28th Jan 1928Box 68 \ 4  scan0033
Amended specification and test for an N.B. type dynamo for EAC.7th Mar 1928Box 68 \ 4  scan0034
Requesting an experimental N.B. dynamo I be fitted to chassis 9-EX, replacing dynamo RE.25.11th Apr 1928Box 68 \ 4  scan0035
Requesting the standardisation sheet for the Phantom Dynamo Armature to be issued upon completion of tests.18th Jun 1928Box 68 \ 4  scan0036
Query regarding the suitability of a 28 slot armature for a narrow brush machine, originally specified for a wide brush machine.5th Jul 1928Box 68 \ 4  scan0037
Standardisation sheet and recommended control brush angle for the Phantom dynamo's 28 slot armature.19th Jul 1928Box 68 \ 4  scan0038
List of angles for different configurations of the Phantom 28 slot dynamo.20th Jul 1928Box 68 \ 4  scan0039
Electrical experimental record sheet for a 28-slot armature, detailing tests, modifications, and mileage.19th Apr 1926Box 68 \ 4  scan0040
Standardisation and 10,000-mile test of a Phantom Dynamo 28 slot armature.20th Sep 1928Box 68 \ 4  scan0041
10,000 mile test report on a 28 slot armature.19th Sep 1928Box 68 \ 4  scan0042
Standardisation of a 40/50 HP. Dynamo 28 slot armature to improve silence and commutation.20th Jul 1928Box 68 \ 4  scan0043
Questionnaire detailing the introduction of a new part for a chassis series.28th Jan 1929Box 68 \ 4  scan0044
Instruction to supersede a Commutator End Bracket with a new design for the Phantom Dynamo due to a change in hole position.17th Oct 1928Box 68 \ 4  scan0045
Electrical experimental record sheet for a 28-slot armature.19th Apr 1926Box 68 \ 4  scan0046
The specification for the inspection and test of an R.R. EAC. Dynamo with a 28 slot armature.19th Dec 1928Box 68 \ 4  scan0047
Specification for the inspection and test of the N.B. type Dynamo with 28 slot armature.19th Dec 1928Box 68 \ 4  scan0048
Continuation of instructions for dynamo testing and brush bedding procedures.19th Dec 1928Box 68 \ 4  scan0049
Instructions for testing and running a dynamo, detailing brush bedding and performance checks.19th Dec 1928Box 68 \ 4  scan0050
Inspection and testing procedures for machine components including armatures, bearings, and insulation.30th Jan 1929Box 68 \ 4  scan0051
Correcting the angle for the control brush on a Phantom dynamo with a 28 slot armature.30th Jan 1929Box 68 \ 4  scan0052
Electrical experimental record sheet for a 28 slot armature.19th Apr 1926Box 68 \ 4  scan0053
Request to have a 40/50 dynamo armature commutator skimmed for testing a special grade of brush.9th Feb 1929Box 68 \ 4  scan0054
Request to borrow two Phantom dynamo machines built with thinner armature stampings for performance testing.13th Feb 1929Box 68 \ 4  scan0055
Optimal number of slots and conductor sizes for an intermediate output armature to reduce noise.21th Feb 1929Box 68 \ 4  scan0056
Recommendations for an experimental 24-slot Phantom armature design, comparing it to 28 and 32-slot versions.10th Apr 1929Box 68 \ 4  scan0057
Specification for production inspection and testing of R.R. Phantom and S.S. type dynamos with 28 slot armatures and thinner armature stampings.10th Apr 1929Box 68 \ 4  scan0058
Specification of Inspection and Test for Phantom & S.S. dynamos with 28 slot armatures.10th Apr 1929Box 68 \ 4  scan0059
Page of procedures for testing and bedding the brushes of a dynamo.10th Apr 1929Box 68 \ 4  scan0060
Page of test procedures for a dynamo, detailing final brush bedding and various running tests.10th Apr 1929Box 68 \ 4  scan0061
Inspection and testing procedures for an electrical machine, focusing on insulation and mechanical condition.10th Apr 1929Box 68 \ 4  scan0062
Production test results log for PI type dynamos with 28 slot armatures.10th Apr 1929Box 68 \ 4  scan0063
From EFC to Mr. Brock regarding the return of two dynamos borrowed for performance testing with thinner armature stampings.10th Apr 1929Box 68 \ 4  scan0064
Reference note for correspondence regarding a 40/50 N.B. dynamo with 28 slot armature.10th Apr 1929Box 68 \ 4  scan0065