Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1419 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Inquiry regarding the performance and further testing of Merlin thin shell bearings produced by Vandervell's Ltd.20th Nov 1940Box 115 \ 4  scan0107
The development and testing of Vandervell main bearings, comparing them to standard silver alloy and lead-bronze types.14th Oct 1940Box 115 \ 4  scan0108
The performance of flangeless blade rod bearings and camshaft bushes.14th Oct 1940Box 115 \ 4  scan0109
The running experience and tests of Vandervell bearings on Merlin engines.14th Oct 1940Box 115 \ 4  scan0110
Analysis of bearing and camshaft bush performance and condition following engine testing.10th Sep 1940Box 115 \ 4  scan0111
The development and mechanical testing of Vandervell thin shell tri-metal main bearings.10th Sep 1940Box 115 \ 4  scan0112
Description of a test rig, test procedures, and results of tests on Vandervell bearings.10th Sep 1940Box 115 \ 4  scan0113
Bearing tests, comparing white-metal and Vandervell bearings to standard RR alloy bearings for the Merlin engine.10th Sep 1940Box 115 \ 4  scan0114
Report page detailing further tests and conclusions on Vandervell bearings, comparing tri-metal and lead-bronze types.10th Sep 1940Box 115 \ 4  scan0115
Comparison of a Vandervell tri-metal bearing with lead bronze and standard R.R. bearings.10th Sep 1940Box 115 \ 4  scan0116
Test report on the fatigue series of Vandervell bearings.10th Sep 1940Box 115 \ 4  scan0117
Log of bearing composition tests detailing performance, temperature, and failure modes.10th Sep 1940Box 115 \ 4  scan0118
Test report on Vandervell bearings, detailing performance and failure analysis under various conditions.4th Dec 1940Box 115 \ 4  scan0119
Letter to The Hoffmann Manufacturing Co., Ltd. requesting 24 No. 117.FS bearings.4th Dec 1940Box 115 \ 4  scan0120
Letter to Vandervell Products Ltd. discussing a choice between tri-metal and lead bronze bearings.30th Nov 1940Box 115 \ 4  scan0121
Letter to Vandervell Products Ltd. regarding revised prints for engine bearings and washers.26th Mar 1941Box 115 \ 4  scan0122
Request to issue an official order to Hoffmann Manufacturing Co. to cover bearings.22th May 1941Box 115 \ 4  scan0123
Copy of a letter to The Hoffmann Manufacturing Co. urgently requesting a list of ball and roller bearings for an experimental project.3rd Mar 1941Box 115 \ 4  scan0124
Letter to Wellworthy Piston Rings Ltd. regarding AC.9 bearing failures and a request for a test set of pistons for a tank engine.28th May 1941Box 115 \ 4  scan0125
Bearing finishes, engine component seizing, and the potential use of aluminium and chromium plating.1st Dec 1942Box 115 \ 4  scan0126
Letter to Wellworthy Ltd. discussing experience and precautions with Aluminium-tin bearing alloys.2nd Feb 1938Box 115 \ 5  scan0001
Providing recommendations for bearing interference fit, working clearances, and crankshaft hardness.2nd Feb 1938Box 115 \ 5  scan0002
Oil filtration recommendations and updates on connecting-rod bearings supplied to various manufacturers.2nd Feb 1938Box 115 \ 5  scan0003
Letter to Wellworthy Ltd. regarding the supply of bearings and bearing blanks for A.E.C. Ltd.2nd Feb 1938Box 115 \ 5  scan0004
Letter from Wellworthy Piston Rings Ltd. regarding the performance of the new R.R. A.C. 6 bearing and requesting blueprints to commence production.3rd Feb 1938Box 115 \ 5  scan0005
Letter from Wellworthy Piston Rings Ltd. concerning A.C. Bearing Alloys.4th Feb 1938Box 115 \ 5  scan0006
Letter from Wellworthy Piston Rings regarding R.R.A.C.6 bearing material and supply from High Duty Alloys.7th Feb 1938Box 115 \ 5  scan0007
Letter to a supplier regarding the production of trial bearings and potential compatibility issues with engines.9th Feb 1938Box 115 \ 5  scan0008
Letter to Ariel Motors Ltd. regarding the composition and properties of two bearing material alloys, RR.AC.6 and RR.AC.7.16th Mar 1938Box 115 \ 5  scan0009
Report to Ariel Motors Ltd. on a modified bearing alloy, its composition, and application guidance.16th Mar 1938Box 115 \ 5  scan0010
Letter from Wellworthy Piston Rings Ltd. to Ariel Motors Ltd. providing recommended bearing clearances.21th Mar 1938Box 115 \ 5  scan0011
Letter from Wellworthy Piston Rings Ltd. to High Duty Alloys Ltd. regarding progress on casting dies and bearings for the RR AC.6 and AC.7.21th Mar 1938Box 115 \ 5  scan0012
Letter from Wellworthy Piston Rings discussing the manufacture and supply of Aluminium-tin bearings for E.R.A. cars.11th Feb 1938Box 115 \ 5  scan0013
Cover letter from Wellworthy Piston Rings Ltd. enclosing a copy of a letter about A.C.6 material.28th Mar 1938Box 115 \ 5  scan0014
Letter to High Duty Alloys Ltd. concerning materials for a main floating bearing trial.28th Mar 1938Box 115 \ 5  scan0015
Letter from Wellworthy Piston Rings Ltd. regarding an A.C.S. Bearing.2nd Apr 1938Box 115 \ 5  scan0016
Letter from Wellworthy Piston Rings Ltd. to Ariel Motors Ltd. regarding the supply of trial bearings.2nd Apr 1938Box 115 \ 5  scan0017
Letter to The Excelsior Motor Co. Ltd. concerning the composition and application of AC.6. bearing material.2nd Apr 1938Box 115 \ 5  scan0018
Technical letter from Wellworthy Piston Rings Ltd. detailing bearing specifications for interference fit, nip, and working clearances.22th Apr 1938Box 115 \ 5  scan0019
Letter concerning Ariel big end bearings and arranging a meeting with Ariel Motors.22th Apr 1938Box 115 \ 5  scan0020
Letter from Wellworthy Piston Rings discussing potential collaboration on bearing applications with various firms.27th Apr 1938Box 115 \ 5  scan0021
Continuation of a letter from Wellworthy Piston Rings discussing a meeting and a design for a main bearing bush.2nd May 1938Box 115 \ 5  scan0022
Correspondence with Wellworthy Piston Rings Ltd. regarding bearing alloy development and production.2nd May 1938Box 115 \ 5  scan0023
Letter from Wellworthy Piston Rings Ltd. discussing the demand, experimentation, and proposed use of bearings for soft shafts.5th May 1938Box 115 \ 5  scan0024
Letter to W. A. Robotham regarding difficulties producing A.C.6 material and arrangements for castings.5th May 1938Box 115 \ 5  scan0025
Letter discussing the performance and production of A.C.6 and A.C.9 bearing alloys with hard and soft shafts.6th May 1938Box 115 \ 5  scan0026
Letter to J. Howlett, Esq. discussing the development, performance, and lubrication of various engine bearing alloys.9th May 1938Box 115 \ 5  scan0027
Letter from the Personal Secretary at Wellworthy Piston Rings Ltd. acknowledging a letter sent to Mr. Howlett.10th May 1938Box 115 \ 5  scan0028
Letter from Wellworthy Piston Rings Ltd. discussing Aluminium-tin bearings and material specifications.16th May 1938Box 115 \ 5  scan0029
Continuation letter from supplier Wellworthy Piston Rings Ltd. regarding a misunderstanding over 'L' section ring specifications.17th May 1938Box 115 \ 5  scan0030
Telegram received by telephone regarding a proposed visit to AEC.17th May 1938Box 115 \ 5  scan0031
Letter to Messrs. Wellworthy Ltd. confirming a visit to the A.E.C.17th May 1938Box 115 \ 5  scan0032
Telegram correcting a prior letter regarding a meeting with AEC, proposing Thursday instead of Friday.4th Mar 1938Box 115 \ 5  scan0033
Telex message concerning a change of appointment time with AEC.18th May 1938Box 115 \ 5  scan0034
Letter from Wellworthy Piston Rings Ltd. regarding the production and testing of RR.AC.6. bearings.6th May 1938Box 115 \ 5  scan0035
Letter from Wellworthy Piston Rings Ltd. to Morris Commercial Cars Ltd. regarding crankshaft steel specifications and hardness.10th May 1938Box 115 \ 5  scan0036
Letter to Ricardo & Co. detailing the composition and properties of the AC.9 aluminium-tin bearing material.23th May 1938Box 115 \ 5  scan0037
Bearing specifications, lubrication, fit, and clearances for connecting rods and main bearings.23th May 1938Box 115 \ 5  scan0038
Letter from Wellworthy Piston Rings Ltd. to Messrs. Ricardo & Co. regarding bearing clearances and production delays.15th Aug 1938Box 115 \ 5  scan0039
Letter to Wellworthy Piston Rings Ltd. regarding the applications and performance of an aluminium bearing alloy.15th Aug 1938Box 115 \ 5  scan0040
Letter from Wellworthy Piston Rings Ltd. enclosing correspondence from other firms about aluminium-tin bearing material.2nd Jun 1938Box 115 \ 5  scan0041
Letter from Wellworthy Piston Rings Ltd. concerning a change in material for Aluminium-tin bushes from AC.6 to AC.9.2nd Jun 1938Box 115 \ 5  scan0042
Letter to Dennis Bros, Ltd. regarding blueprints, pricing, and production of Aluminium-tin alloy bearings.1st Jun 1938Box 115 \ 5  scan0043
Correspondence from Wellworthy Piston Rings Ltd. regarding difficulties with the AC.6 bearing and an oil groove.31th May 1938Box 115 \ 5  scan0044
Letter to Bristol Aero Co. Ltd. clarifying the supply of rough-machined connecting rod bush castings.31th May 1938Box 115 \ 5  scan0045
Letter to Albion Motors Ltd. detailing the composition and characteristics of AC.9 Aluminium-tin bearing material.27th May 1938Box 115 \ 5  scan0046
Bearing materials, lubrication, fitting, and clearance specifications.27th May 1938Box 115 \ 5  scan0047
The composition and performance of alternative bearing and valve seat insert materials.27th May 1938Box 115 \ 5  scan0048
Letter from Wellworthy Piston Rings Ltd. discussing the composition and performance of different valve seats.30th May 1938Box 115 \ 5  scan0049
Letter from Wellworthy Piston Rings Ltd. regarding a supply delay for modified bearings.30th May 1938Box 115 \ 5  scan0050
Letter from Wellworthy Pistonrings Ltd regarding the production of a centre main bearing for a 4 cylinder engine.20th May 1938Box 115 \ 5  scan0051
Letter from Wellworthy Piston Rings Ltd. to The Excelsior Motor Co. Ltd. regarding a production delay for Aluminium-tin bearings due to material improvements.25th May 1928Box 115 \ 5  scan0052
Letter from Wellworthy Piston Rings Ltd. to Leyland Motors Ltd. regarding a delay in an order for bearing shells.11th May 1938Box 115 \ 5  scan0053
Letter to High Duty Alloys Ltd. regarding a change in bearing metal specification from A.C.6 to A.C.9.23th May 1938Box 115 \ 5  scan0054
Letter from Wellworthy Piston Rings Ltd. regarding a delivery delay for bearings made from RR. AC.6 material.19th May 1938Box 115 \ 5  scan0055
Letter to J.W. Howlett regarding the urgent supply of bearings for Leyland cub engines.28th Jun 1938Box 115 \ 5  scan0056
Letter discussing the pricing of bearings and asking for a decision on whether to make a formal offer.28th Jun 1938Box 115 \ 5  scan0057
Letter to Wellworthy Piston Rings regarding a visit to Dennis Motors and the supply of lead bronze bearings.28th Jun 1938Box 115 \ 5  scan0058
Visit to Dennis Bros. to inspect the performance of A.C.6 connecting rod bearings.28th Jun 1938Box 115 \ 5  scan0059
Visit to Dennis Bros. regarding engine bearing material issues and a potential filtration solution.28th Jun 1938Box 115 \ 5  scan0060
Letter from Wellworthy Piston Rings Ltd. discussing bearing production for Leyland engines, delays due to a high number of orders, and pricing strategy.30th Jun 1938Box 115 \ 5  scan0061
Letter discussing competitive strategy for bearings, specification changes, price policy, and production status.30th Jun 1938Box 115 \ 5  scan0062
Cost breakdown for the production of half bearing castings.2nd Jul 1938Box 115 \ 5  scan0063
Letter to Wellworthy Ltd. proposing prices for the production of bearing blanks for Leyland Motors.30th Jun 1938Box 115 \ 5  scan0064
Cover letter forwarding a copy of a letter from Mr. Howlett regarding bearing alloys.30th Jun 1938Box 115 \ 5  scan0065
Letter from Wellworthy Piston Rings Ltd. providing a progress report on the production of bearings.28th Jun 1938Box 115 \ 5  scan0066
Letter from John Howlett to R. B. Wilson regarding production scheduling, tooling, and delivery priorities for various customers.28th Jun 1938Box 115 \ 5  scan0067
List of customer parts, corresponding internal part numbers, and descriptions for jobs in the shops.28th Jun 1938Box 115 \ 5  scan0068
Parts list for various engine bearings, cross-referencing manufacturer part numbers.1st Jul 1938Box 115 \ 5  scan0069
Letter from Wellworthy Piston Rings Ltd. forwarding a copy of correspondence regarding a works visit.1st Jul 1938Box 115 \ 5  scan0070
Letter to High Duty Alloys, Ltd. discussing heat treatment and hardness testing procedures for bearings.1st Jul 1938Box 115 \ 5  scan0071
Page two of a letter addressed to W.C. Devereux Esq. regarding a recent visit from a Mr. Richards.1st Jul 1938Box 115 \ 5  scan0072
Letter to J. Howlett of Wellworthy Piston Rings Ltd. to arrange a meeting to discuss a bearing situation.2nd Jul 1938Box 115 \ 5  scan0073
Letter from Wellworthy Piston Rings specialists regarding Aluminium-tin bearings.6th Jul 1938Box 115 \ 5  scan0074
Letter to Scammell Lorries Ltd. regarding specifications and tolerances for RR. AC9 bearings.5th Jul 1938Box 115 \ 5  scan0075
Clearances for connecting rod and main bearings.5th Jul 1938Box 115 \ 5  scan0076
Letter from Wellworthy Piston Rings Ltd. detailing connecting rod and main bearing clearances.4th Jul 1938Box 115 \ 5  scan0077
Letter detailing the composition and properties of the new AC.9 bearing material.4th Jul 1938Box 115 \ 5  scan0078
From Wellworthy Piston Rings Ltd. detailing recommended working clearances and nip for connecting rod and main bearings.7th Jul 1938Box 115 \ 5  scan0079
Letter from Wellworthy Piston Rings Ltd. forwarding a memorandum and I.A.E. research list regarding bearings.7th Jul 1938Box 115 \ 5  scan0080


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙