Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2253 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Modifications to the Goshawk 11 'B' type accelerator pedal.25th Apr 1922West Wittering \ H \ April1922  Scan31
Drawing No. LeC 1557 for a larger air valve for the Goshawk 11 carburetter.25th Apr 1922West Wittering \ H \ April1922  Scan32
Design of the Peregrine hand and foot brake equalising mechanism.25th Apr 1922West Wittering \ H \ April1922  Scan33
Design changes for the Goshawk 11 distribution box cover, including materials and lining.27th Apr 1922West Wittering \ H \ April1922  Scan34
Modifications to a broken front spring for a Goshawk 11.27th Apr 1922West Wittering \ H \ April1922  Scan35
Issue of flats forming on Goshawk 11 valve rockers and proposing a new design with a larger roller.28th Apr 1922West Wittering \ H \ April1922  Scan36
Design changes for the Goshawk 11 cross steering tube.28th Apr 1922West Wittering \ H \ April1922  Scan37
Design of a shock absorber ball joint connecting rod.29th Apr 1922West Wittering \ H \ April1922  Scan38
Response clarifying the average speed of the Goshawk chassis on a bumper, assuming specific tyres are fitted.6th Apr 1922West Wittering \ H \ April1922  Scan39
Ignition advance curve for the Goshawk II engine governor.20th Apr 1922West Wittering \ H \ April1922  Scan40
Continued note discussing an ignition modification, governor operation, and communication with Mr. Hives.20th Apr 1922West Wittering \ H \ April1922  Scan41
Sending an advance blueprint for the Goshawk Condenser materials question.1st Dec 1921West Wittering \ H \ December1921  Scan0
Goshawk 11 starter switch, pedal, brushes, and related drawings.1st Feb 1922West Wittering \ H \ February1922  Scan0
Return and testing of a Weyman Exhaust Feed Tank on a Goshawk chassis.2nd Feb 1922West Wittering \ H \ February1922  Scan1
Proposal for a 2-seater, boat-shaped speed body for the 'Swallow'/'Peregrine' model, detailing a staggered seating layout.1st Feb 1922West Wittering \ H \ February1922  Scan2
Alterations to the Goshawk 11 'B' type pedals to improve driver comfort.3rd Feb 1922West Wittering \ H \ February1922  Scan3
Requesting modifications to the Goshawk 11 distribution board diagram.14th Feb 1922West Wittering \ H \ February1922  Scan4
Drawing Lec 1531 for the Goshawk 11 starter motor cable connection.4th Feb 1922West Wittering \ H \ February1922  Scan5
Requesting further details about a specimen steering wheel and conveying Mr. Royce's instructions for the Goshawk steering wheel.6th Feb 1922West Wittering \ H \ February1922  Scan6
Relaying Mr. Royce's decision against adding a stop on the back shackle for the rear springs.7th Feb 1922West Wittering \ H \ February1922  Scan7
Suggestion for lubricating the back shackle on Goshawk 11 rear springs.7th Feb 1922West Wittering \ H \ February1922  Scan8
Complaints and proposed modifications regarding the accelerator pedal cutting into the body runner.8th Feb 1922West Wittering \ H \ February1922  Scan9
Scheme number for a revised connecting rod for the 40/50 front shock absorber.2nd Feb 1922West Wittering \ H \ February1922  Scan10
Recommendation to fit Hartford pattern double acting shock dampers to the rear of the 40/50 chassis to address issues with rear springs and cord tyres.10th Feb 1922West Wittering \ H \ February1922  Scan11
Page 2 of a letter advising on the use of Hartford pattern shock dampers and flexible springs for maximum damping effect.10th Feb 1922West Wittering \ H \ February1922  Scan12
The arrangement of the magneto control gear for the Goshawk II engine.10th Feb 1922West Wittering \ H \ February1922  Scan13
Letter discussing the reduction of lever parts on an engine in Derby and arranging for magneto wiring drawings.10th Feb 1922West Wittering \ H \ February1922  Scan14
Request for a specimen of a tele-gauge for a proposed new petrol level gauge, for Mr. Royce's inspection.10th Feb 1922West Wittering \ H \ February1922  Scan15
Drawing LeC 1533 for the Goshawk 11 engine, detailing a test double valve spring and a modified valve gear cover nut.1st Feb 1922West Wittering \ H \ February1922  Scan16
Suggestion for standard body models for the Peregrine and Goshawk cars to be sold as complete vehicles.14th Feb 1922West Wittering \ H \ February1922  Scan17
Suggesting standard body types for the Peregrine and Goshawk cars and a liaison for coachbuilders.4th Feb 1922West Wittering \ H \ February1922  Scan18
Outlining the requirements for a battery ignition system for the Goshawk engine.14th Feb 1922West Wittering \ H \ February1922  Scan19
Telegram from Royce to Hives querying the status of the D7P chassis.14th Feb 1922West Wittering \ H \ February1922  Scan20
Logistics for a car, including collecting it, fitting a seat in Derby, and acquiring the chassis.4th Feb 1922West Wittering \ H \ February1922  Scan21
Confirmation of a telegram from Royce to Hives concerning a D.F.P. chassis.14th Feb 1922West Wittering \ H \ February1922  Scan22
Proposed change to the tail-light and number-plate for the Goshawk 11.14th Feb 1922West Wittering \ H \ February1922  Scan23
Gear ratio selection for the Goshawk back axle, concerning the crown wheel and pinion teeth count.15th Feb 1922West Wittering \ H \ February1922  Scan24
Confirmation of a wire regarding testing procedures for Goshawk engine components.15th Feb 1922West Wittering \ H \ February1922  Scan25
Provision for fitting a shorter thermometer bulb to a Goshawk 11 cylinder head.16th Feb 1922West Wittering \ H \ February1922  Scan26
Trial and standardisation of a stronger valve tappet spring for the Goshawk engine.16th Feb 1922West Wittering \ H \ February1922  Scan27
Mr. Evernden's role as a liaison to avoid errors between the design department and coachbuilding supervisors.17th Feb 1922West Wittering \ H \ February1922  Scan28
On the recommendation to make Goshawk 11 slipper flywheels in steel.17th Feb 1922West Wittering \ H \ February1922  Scan29
Proceeding with a C.A.V. starter for pre-war cars, with modifications for a slower speed.18th Feb 1922West Wittering \ H \ February1922  Scan30
Position of the motor terminal for a Goshawk II engine.22th Feb 1922West Wittering \ H \ February1922  Scan31
Mr. Royce's decision not to add a feature to prevent starter switch terminals from rotating.23th Feb 1922West Wittering \ H \ February1922  Scan32
The measurement of a Telegauge part, with results sent to Mr. Bailey.28th Feb 1922West Wittering \ H \ February1922  Scan33
Sketch for a new boss on the gearbox to accommodate revised 'D' pedals.2nd Jan 1922West Wittering \ H \ January1922  Scan0
Query from Mr. Royce regarding the effectiveness of rounded edges on fly-wheel teeth for the Goshawk starter.5th Jan 1922West Wittering \ H \ January1922  Scan1
Urgent telegram requesting dimensions and particulars for a C.A.V. Lucas dynamo and coupling.4th Jul 1921West Wittering \ H \ January1922  Scan2
Modifications to the Goshawk 11 'D' pedals to increase leg room.4th Jan 1922West Wittering \ H \ January1922  Scan3
The Goshawk radiator fixing with set-up springs.14th Jan 1922West Wittering \ H \ January1922  Scan4
Alterations to the Goshawk II engine's crank-case for the dynamo drive, referencing scheme LeC 1514.1st Jan 1922West Wittering \ H \ January1922  Scan5
Exhaust heated throttle, pilot jet, and instrument board lettering for the 40/50 chassis.10th Jan 1922West Wittering \ H \ January1922  Scan6
Requesting a relocation of the Goshawk 11 oil filler for exhaust pipe clearance.10th Jan 1922West Wittering \ H \ January1922  Scan7
Modifications to the crankcase, oil filler, breather connection, and magneto drive.10th Jan 1922West Wittering \ H \ January1922  Scan8
Starter pinion and adapting engines for an independent dynamo gear wheel mounting.26th Apr 1917West Wittering \ H \ January1922  Scan9
The development of a strengthened camshaft wheel for better high-speed running, referencing drawing Lec1515.11th Jan 1922West Wittering \ H \ January1922  Scan10
Development progress and priority of a petrol level indicator for the Goshawk 11.17th Jan 1922West Wittering \ H \ January1922  Scan11
Proposed improvement to the lubrication method for the Goshawk 11 dynamo bearings.8th Oct 1935West Wittering \ H \ January1922  Scan12
Mechanical condition of a specimen vacuum feed tank and a proposal to test it.19th Jan 1922West Wittering \ H \ January1922  Scan13
Issues and potential improvements for Goshawk engine brakes, focusing on materials and mechanical design.19th Jan 1922West Wittering \ H \ January1922  Scan14
Alterations to brake levers, the effect on wire rope travel, and the elimination of footbrake squeak.26th Apr 1917West Wittering \ H \ January1922  Scan15
Wiring specifications for the Goshawk 11, detailing colour and numbering schemes for cables.19th Jan 1922West Wittering \ H \ January1922  Scan16
Query about sourcing an alternative for a specified 61/25 cable from Glover's make for drawing LeC 1044.26th Apr 1917West Wittering \ H \ January1922  Scan17
Cover note for the unfinished drawing LoC 1517 of the Goshawk 11 electric starter switch and control.20th Jan 1922West Wittering \ H \ January1922  Scan18
The Goshawk 11 Distribution Board, detailing its construction and requesting wiring instructions.21th Jan 1922West Wittering \ H \ January1922  Scan19
Drawing No. LeC 1520, which details an improved plunger for the Goshawk 11 Bendix Pinion.8th May 1933West Wittering \ H \ January1922  Scan20
Two fixing schemes for the Goshawk 11 longer front dumb iron, referencing drawings LeC.1524 and LeC.1525.26th Jan 1922West Wittering \ H \ January1922  Scan21
'E' to 'Hs' regarding Mr. Royce's schedule, the Goshawk project, and car 6.EX.31th Jan 1922West Wittering \ H \ January1922  Scan22
Telegram regarding the readiness of a 1921 experimental chassis and required spring improvements.24th Nov 1920West Wittering \ H \ January1922  Scan23
Outlining chief dimensions for the 'Swallow' model and considering a French D.F.P. chassis as a guide.16th Jan 1922West Wittering \ H \ January1922  Scan24
Particulars of a 10.HP Peugeot chassis and comparing back axle gear ratios.8th Jan 1922West Wittering \ H \ January1922  Scan25
Engine specification, comparing 4 versus 6 cylinders, for the 'Swallow' model.8th Jan 1922West Wittering \ H \ January1922  Scan26
Acquisition of a D.F.P. car chassis for evaluation and developing new coachwork.26th Jan 1922West Wittering \ H \ January1922  Scan27
Proposal and justification for using a 6-cylinder engine in the new 'Swallow'/'Peregrine' model.28th Jan 1922West Wittering \ H \ January1922  Scan28
Design philosophy and specifications for a new small car model, comparing it to the Fiat and Goshawk.4th Jan 1922West Wittering \ H \ January1922  Scan29
Typed memorandum discussing car models, including the 40/50 and 12.HP, in relation to 'lady drivers' and market strategy.3rd Jan 1922West Wittering \ H \ January1922  Scan30
The specifications and construction of a Lucas motor for the Goshawk II.3rd Jan 1922West Wittering \ H \ January1922  Scan31
Page 2 of a report detailing motor specifications and performance analysis from a brake test, referencing a Goshawk engine and Lucas motor.3rd Jan 1922West Wittering \ H \ January1922  Scan32
Performance comparison of Lucas and C.A.V. motors, detailing figures for torque, speed, power, and efficiency.3rd Jan 1922West Wittering \ H \ January1922  Scan33
Comparison of Lucas and C.A.V. motors, noting battery performance and suggesting further tests on an engine.3rd Jan 1922West Wittering \ H \ January1922  Scan34
Blueprint graph showing starter motor brake efficiency for a Lucas starter motor on a Goshawk chassis.5th Jan 1922West Wittering \ H \ January1922  Scan36
Drawings for Lucas & C.A.V. Goshawk dynamos.5th Jan 1922West Wittering \ H \ January1922  Scan37
The rounded teeth on the 'Goshawk' starter for Goshawk II engines.6th Jan 1932West Wittering \ H \ January1922  Scan38
Model of a Goshawk 11 vacuum tank, suggesting a lighter construction.12th Jan 1922West Wittering \ H \ January1922  Scan39
Fitting a Klaxon horn to the Goshawk 11 dashboard, referencing drawing Lec 1526.28th Jan 1922West Wittering \ H \ January1922  Scan40
Printing and modifications for the Goshawk 11 wiring diagram.30th Jan 1922West Wittering \ H \ January1922  Scan41
Appropriate wiring gauge for the Goshawk starter motor compared to the 40/50 model.28th Jan 1922West Wittering \ H \ January1922  Scan42
Booklet on the Midgley-Scholey chassis electrical equipment and its control method.30th Jan 1922West Wittering \ H \ January1922  Scan43
Continued critique of an electrical system, discussing issues with the dynamo, vibrator regulator, Midgley-Scholey system, and junction box.30th Jan 1922West Wittering \ H \ January1922  Scan44
Methodology for a special battery efficiency test under starter motor conditions.31th Jan 1928West Wittering \ H \ January1922  Scan45
Experiment to determine the efficiency of recharging a car battery after multiple discharge cycles.1st Jan 1922West Wittering \ H \ January1922  Scan46
Battery efficiency tests concluding a 70% figure is correct based on replacement charge data.1st Jan 1922West Wittering \ H \ January1922  Scan47
With a sketch concerning the position of the steering wheel and front seats for the 10 HP D.F.P. car.10th Mar 1922West Wittering \ H \ March1922  Scan0
Telegram regarding the postage of an ignition switch and an enquiry about a starter switch.22th Mar 1922West Wittering \ H \ March1922  Scan1
Clarifying that a voltmeter was fitted to a 40/50 chassis for experimental purposes only, not as standard equipment.15th Mar 1922West Wittering \ H \ March1922  Scan2
Forwarding a letter about a new lubricant and suggesting a sample be obtained for testing.15th Mar 1922West Wittering \ H \ March1922  Scan3
Letter from Alexander Duckham & Co. to F.H. Royce regarding a new lubricating oil discovery.10th Mar 1922West Wittering \ H \ March1922  Scan4
Jamming issues with the Goshawk 11 Bendix Pinion and proposing solutions.15th Mar 1922West Wittering \ H \ March1922  Scan5
Page 2 of a document describing a mechanism's disengagement by the engine and the timing requirements for its teeth and threads.10th Dec 1920West Wittering \ H \ March1922  Scan6


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙