DescriptionDateIdentifier
Explaining the operation of the Goshawk II double throttle controls, referencing drawing No. Lec.1454.23th Mar 1921West Wittering \ G \ September1921  Scan28
Telegram inquiring about results for a cowling over the radiator on a 40/50 chassis.2nd Aug 1920West Wittering \ G \ September1921  Scan29
The revision of drawing No. LeC.M55 for the 'Goshawk II' carburettor.26th Sep 1921West Wittering \ G \ September1921  Scan30
Directive regarding the standardisation of iridio-platinum contact points and condenser capacity to reduce sparking.9th Sep 1921West Wittering \ G \ September1921  Scan31
The 'Goshawk II' switchbox drawing.29th Sep 1921West Wittering \ G \ September1921  Scan32
Results of comparative tests on Bakelite and 'ELO' mouldings.9th Sep 1921West Wittering \ G \ September1921  Scan33
Issues with the petrol tank, spring drive, and radiator on the Goshawk 11 model.9th Sep 1931West Wittering \ G \ September1921  Scan34
On the experimental testing and analysis of a U.S.A. Bosch battery ignition system's coil and condenser.15th Sep 1931West Wittering \ G \ September1921  Scan35
Technical memo comparing condenser capacities and various battery ignition systems, including Goshawk II and Bosch.5th Sep 1921West Wittering \ G \ September1921  Scan36
Experiences with Peto & Radford batteries and procuring a new battery for the Goshawk.1st Sep 1921West Wittering \ G \ September1921  Scan37
Pre-ignition issues caused by over-heated Champion ignition plugs, their failures, and potential design flaws.9th Sep 1921West Wittering \ G \ September1921  Scan38
Spark plug selection, balancing heat characteristics, and engine distribution improvements.1st Sep 1921West Wittering \ G \ September1921  Scan39
The leakage of charge test for the latest standard Chloride 6RXE5 12-volt battery after standing for six months.16th Sep 1921West Wittering \ G \ September1921  Scan40
Battery discharge capacity test to diagnose the cause of capacity loss.16th Sep 1921West Wittering \ G \ September1921  Scan41
Performance of a standard starter motor with a specific field coil arrangement.8th Sep 1921West Wittering \ G \ September1921  Scan42
Analysis of engine starting performance, comparing two series two parallel winding schemes and the impact of battery and cable resistance.1st Sep 1921West Wittering \ G \ September1921  Scan43
Comparison of battery performance under high-rate discharge, listing various tested models.8th Sep 1921West Wittering \ G \ September1921  Scan44
Broken valve spring washer and engine gear noise on a Goshawk 11 engine, suggesting modifications based on the 40/50 engine design.13th Sep 1921West Wittering \ G \ September1921  Scan45
Investigation into clutch jagger and top speed gear issues by testing a second Goshawk engine and gearbox unit.9th Sep 1921West Wittering \ G \ September1921  Scan46
Suitability and modification of dynamos and motors from various manufacturers for the Goshawk II electrical system.13th Sep 1921West Wittering \ G \ September1921  Scan47
The performance and testing of C.A.V. dynamos and motors, including issues with commutators.13th Sep 1921West Wittering \ G \ September1921  Scan48
Testing a high-current motor for the 40/50 chassis and necessary modifications.13th Sep 1921West Wittering \ G \ September1921  Scan49
Notes on batteries, starter cables, and starter motors.13th Sep 1921West Wittering \ G \ September1921  Scan50
Defining a limit for the virtual internal resistance of a battery for operating the starter motor.13th Sep 1921West Wittering \ G \ September1921  Scan51
Continued page detailing battery discharge testing procedures and specifications.13th Sep 1921West Wittering \ G \ September1921  Scan52
Continued report discussing battery and starter motor characteristics, referencing previous notes and S.A.E. standards.13th Sep 1921West Wittering \ G \ September1921  Scan53
Starter motor performance, comparing its battery system to American 12-volt systems and evaluating alternative batteries.13th Sep 1921West Wittering \ G \ September1921  Scan54
Results of starter motor brake tests and the merits of plotting data on a torque base versus an ampere base.13th Sep 1921West Wittering \ G \ September1921  Scan55
Tests and pricing of iridio-platinum contact points with a reduced platinum content.14th Sep 1921West Wittering \ G \ September1921  Scan56
The testing of irido-platinum contact points, detailing wear, misfiring, and rusting issues.9th Sep 1921West Wittering \ G \ September1921  Scan57
Sparking, rusting, and testing of iridio-platinum distributor points.11th Aug 1920West Wittering \ G \ September1921  Scan58
Cover note for an attached report on the comparative tests of Bakelite and 'Elo' mouldings.15th Sep 1921West Wittering \ G \ September1921  Scan59
Comparative tests of Bakelite and Elo mouldings, detailing fracture, absorption, and heat resistance.7th Jul 1921West Wittering \ G \ September1921  Scan60
Continued report on materials testing, comparing the properties of Bakelite and Elo in sulphuric acid.11th Aug 1920West Wittering \ G \ September1921  Scan61
Recommending the reconsideration of the Goshawk 11 petrol level indicator due to unreliability from rusting.15th Sep 1921West Wittering \ G \ September1921  Scan62
Request for the return of a Marmon switch, a Bosch switch, and a Speedometer Drive due to high costs and immediate need.15th Sep 1921West Wittering \ G \ September1921  Scan63
Testing and adoption of Bakelite-Micarta bushes for magnetos in place of fibre bushes.16th Sep 1921West Wittering \ G \ September1921  Scan64
Recommendation to immediately obtain and fit Bakelite-micarta bushes to magnetos on all cars in hand.6th Sep 1921West Wittering \ G \ September1921  Scan65
Modification scheme for existing axles to overcome failing single thrust bearings.17th Sep 1921West Wittering \ G \ September1921  Scan66
The modification and testing of journal and thrust bearings for axles.17th Sep 1921West Wittering \ G \ September1921  Scan67
The importance of maintaining an efficient oil film and the problems of using thick oil in winter.17th Sep 1921West Wittering \ G \ September1921  Scan68
Diagrams and functionality of the 'Goshawk II' electrical system, focusing on the switchbox and fuse arrangement.19th Sep 1921West Wittering \ G \ September1921  Scan69
Continued discussion on dynamo fuses, voltage rise, and protection of the electrical system.19th Sep 1921West Wittering \ G \ September1921  Scan70
The merits of using a series-operated buzzer and main fuse for electrical protection.19th Sep 1921West Wittering \ G \ September1921  Scan71
Cover memo for an assistant's report on comparative tests of insulating varnishes.20th Sep 1921West Wittering \ G \ September1921  Scan72
Comparative tests of standard insulating varnishes with Asiatic varnish.16th Sep 1921West Wittering \ G \ September1921  Scan73
The properties of asiatic varnish, including its inflammability, characteristics, and corrosive effects.28th Feb 1921West Wittering \ G \ September1921  Scan74
Reporting on the superior performance of American-supplied front springs in testing.20th Sep 1921West Wittering \ G \ September1921  Scan75
The performance issues of an experimental exhaust-heated throttle, particularly regarding poor fuel distribution in cold conditions.1st Sep 1921West Wittering \ G \ September1921  Scan76
Continued memorandum detailing throttle testing issues and a delay in sending model pieces to Springfield.20th Sep 1921West Wittering \ G \ September1921  Scan77
The excessively strong springs and a noisy gearbox bearing on the Goshawk 11.20th Sep 1921West Wittering \ G \ September1921  Scan78
The bench testing of a Rotax AT.4 dynamo sample for the Goshawk II engine, detailing its mechanical and electrical performance.19th Feb 1931West Wittering \ G \ September1921  Scan79
Performance test results and physical specifications of a machine compared to its design specification.21th Sep 1921West Wittering \ G \ September1921  Scan80
Performance test results for a dynamo, concluding its heating performance is reasonable and it is available for the Goshawk II chassis.21th Sep 1921West Wittering \ G \ September1921  Scan81
Graph of ampere output versus speed curves for a Rotax A.T.4 Dynamo for the Goshawk engine.21th Sep 1921West Wittering \ G \ September1921  Scan82
The back of a document with a company stamp and handwritten reference.21th Sep 1921West Wittering \ G \ September1921  Scan83
Sourcing and various types of Bakelite products and similar materials.21th Sep 1921West Wittering \ G \ September1921  Scan84
Comparison of insulating materials such as Bakelite, Beldalite, and Hightensite from various suppliers.21th Sep 1921West Wittering \ G \ September1921  Scan85
Deflection test results for a Goshawk 11 crankshaft.22th Sep 1921West Wittering \ G \ September1921  Scan86
Comparing the capacity and construction of various condensers for battery ignition systems.27th Sep 1921West Wittering \ G \ September1921  Scan87
Report comparing the capacity, volume, and performance of various ignition condensers.27th Sep 1921West Wittering \ G \ September1921  Scan88
Condenser capacity experiments for Goshawk and 40/50 chassis ignition systems.27th Sep 1921West Wittering \ G \ September1921  Scan89
Test report on the squeaking of thick leaf springs, concluding that forming a radius on the leaf edges is an improvement but not a permanent cure.28th Sep 1921West Wittering \ G \ September1921  Scan90
Issues with screwed exhaust joints and recommending a design similar to the 40/50 HP chassis.29th Sep 1921West Wittering \ G \ September1921  Scan91
The receipt and testing of a sample Lucas E.5RR dynamo for the Goshawk.20th Sep 1921West Wittering \ G \ September1921  Scan92
Technical discussion on dynamo switchbox equipment for the Goshawk, comparing two vs. three conductor switching.30th Sep 1921West Wittering \ G \ September1921  Scan93
The bench testing and performance analysis of a dynamo, including its physical specifications.30th Sep 1921West Wittering \ G \ September1921  Scan94
The results of a heating test for a machine, detailing temperature and performance findings.30th Sep 1921West Wittering \ G \ September1921  Scan95
Graph of ampere output vs. RPM speed curves for a Lucas E.G.R.R. Dynamo for Goshawk under cold and hot conditions.29th Sep 1921West Wittering \ G \ September1921  Scan96
On the requirements for the Goshawk 11 practical wiring diagram, its purpose, and recent alterations.3rd Apr 1922West Wittering \ H \ April1922  Scan0
Sending a preliminary arrangement drawing (LeC 1541) for the Peregrine engine, showing leading dimensions.1st Apr 1922West Wittering \ H \ April1922  Scan1
Instructions for the Peregrine engine's piston and connecting rod.4th Jan 1922West Wittering \ H \ April1922  Scan2
Request for competitor information on dynamo and starter motors for comparison with a new design for the Peregrine engine.4th Apr 1922West Wittering \ H \ April1922  Scan3
Drawings for the Peregrine Gearbox, noting a design detail is undecided pending completion of the dynamo drive.1st Apr 1922West Wittering \ H \ April1922  Scan4
Suggesting a reduction in the diameter of lubrication holes for the Peregrine crankshaft.8th Apr 1922West Wittering \ H \ April1922  Scan5
Sending of drawings LeC 1554 and 1555 for the Peregrine change speed and brake levers.20th Apr 1922West Wittering \ H \ April1922  Scan6
Design of the Peregrine rear springs, shackles, and frame fittings.25th Apr 1922West Wittering \ H \ April1922  Scan7
Design and model creation for the Peregrine chassis and phaeton body.26th Apr 1922West Wittering \ H \ April1922  Scan8
Lubrication solution for the Goshawk 11 low tension make and break component.4th Apr 1922West Wittering \ H \ April1922  Scan9
Changing the Peregrine crankcase depth dimension and related forthcoming drawings.5th Apr 1922West Wittering \ H \ April1922  Scan10
Modification to the de-clutching shaft and ball race housing for the Peregrine clutch, referencing drawing LeC 1544.1st Apr 1922West Wittering \ H \ April1922  Scan11
Design and specifications of Goshawk 11 steering levers.6th Apr 1922West Wittering \ H \ April1922  Scan12
Design modifications and stress analysis of a steering lever.6th Apr 1922West Wittering \ H \ April1922  Scan13
Improvements to the Goshawk 11 side steering tube to eliminate side kicks by substituting balanced springs.6th Apr 1922West Wittering \ H \ April1922  Scan14
Page 2 of a letter requesting results before proceeding with alterations to the side steering tube end design.8th Mar 1922West Wittering \ H \ April1922  Scan15
Quoting Mr. Royce's opinion on the modification of the cross steering tube changeover procedure.7th Apr 1922West Wittering \ H \ April1922  Scan16
Scheme for a carrier to support the wheel on the running boards of the Goshawk 11 model.8th Apr 1922West Wittering \ H \ April1922  Scan17
Proposed modifications to the Goshawk 11 front shock absorber.10th Apr 1922West Wittering \ H \ April1922  Scan18
Standardisation of batteries and starter motors, questioning the need for a larger battery.12th Apr 1922West Wittering \ H \ April1922  Scan19
Proposed modifications to the Goshawk 11 rear shock absorber to prevent toggling.12th Apr 1922West Wittering \ H \ April1922  Scan20
Typed document, page 2, suggesting modifications to a shock absorber to reduce toggling.13th Apr 1922West Wittering \ H \ April1922  Scan21
Goshawk II engine's ignition advance curve and governor modifications.13th Apr 1922West Wittering \ H \ April1922  Scan22
Design of a starting shaft cover with a pip for correct positioning.13th Apr 1922West Wittering \ H \ April1922  Scan23
Improvements to the shock damper and steering joints for the No.4 Goshawk vehicle.19th Apr 1922West Wittering \ H \ April1922  Scan24
Findings and suggestions for improving spring shackles and front horns.19th Apr 1922West Wittering \ H \ April1922  Scan25
Carburation issues on the No.4 Goshawk engine and a note on the fan.20th Apr 1922West Wittering \ H \ April1922  Scan26
Proposal to modify the pendulum lever slot on the Goshawk 11 undershield, referencing drawing Lec 1553.20th Apr 1922West Wittering \ H \ April1922  Scan27
Calculations for modifying the Goshawk 11 carburetter.20th Apr 1922West Wittering \ H \ April1922  Scan28
New inverted arrangement for the Goshawk 11 rear shock absorber.20th Apr 1922West Wittering \ H \ April1922  Scan29
Position of the wheel on the running board for Goshawk 11 cars.24th Apr 1922West Wittering \ H \ April1922  Scan30


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙