| Page concerning a tube for Mr Royce's inspection. | 26th Aug 1913 | Box 75 \ 3 scan0261 | |
| Instructions to Mr. Royce regarding the adaptation of an accelerator pedal for wider frame side members. | 26th Aug 1913 | Box 75 \ 3 scan0262 | |
| Telegram copy detailing the heat treatment procedure for frames made of 3% nickel steel. | 10th Feb 1913 | Box 75 \ 3 scan0263 | |
| Tests on heat-treated frame ends for a revolving rig. | 23th Jun 1913 | Box 75 \ 3 scan0264 | |
| Feedback and suggested modifications for an accelerator pedal design based on blueprint F.3654. | 1st Sep 1913 | Box 75 \ 3 scan0265 | |
| Welding and drilling of the box section front end of a frame. | 15th Sep 1913 | Box 75 \ 3 scan0266 | |
| Experimental Department 'B' weekly report detailing tests on frame deflection, steering wobbles, and heat treatment. | 22th Sep 1913 | Box 75 \ 3 scan0267 | |
| Heat treatment procedures and impact testing for frames to improve uniformity and prevent breakage. | 24th Sep 1913 | Box 75 \ 3 scan0268 | |
| Results of tests on nickel steel side members and proposing future heat treatment processes. | 3rd Nov 1913 | Box 75 \ 3 scan0269 | |
| Experiment with side plates for a new radiator suspension on a frame. | 4th Oct 1913 | Box 75 \ 3 scan0270 | |
| Responding to a query about proceeding with the production of side plates for a frame's front end. | 6th Oct 1913 | Box 75 \ 3 scan0271 | |
| Instruction memo to Mr. Royce regarding an incorrect frame curvature, enclosing a print for approval. | 24th Oct 1913 | Box 75 \ 3 scan0272 | |
| Instruction sheet to Mr Wormald regarding the despatch of an E.A.F. distribution and a blue print. | 24th Oct 1918 | Box 75 \ 3 scan0273 | |
| Design and curvature of the front end of frame X. 880. | 29th Oct 1913 | Box 75 \ 3 scan0274 | |
| Technical description of the vehicle's pressed steel frame, its stiffening, and engine mounting. | 24th Nov 1913 | Box 75 \ 3 scan0275 | |
| Weekly report from the Experimental Department detailing progress on various vehicle components and tests. | 25th Nov 1913 | Box 75 \ 3 scan0276 | |
| The bumping test of a frame with box section front horns. | 27th Nov 1913 | Box 75 \ 3 scan0277 | |
| Log of component failures and breakages recorded during a durability test run. | 27th Nov 1913 | Box 75 \ 3 scan0278 | |
| Log sheet detailing component failures and breakages recorded against engine running hours. | 27th Nov 1913 | Box 75 \ 3 scan0279 | |
| Test report detailing multiple component failures during a running test, with analysis and proposed modifications. | 27th Nov 1913 | Box 75 \ 3 scan0280 | |
| Description of a modification to a stub, recessing it between journals to reduce weight. | 1st Dec 1913 | Box 75 \ 3 scan0281 | |
| Bumping test failure on a frame with box section front horns and proposed design improvements. | 1st Dec 1913 | Box 75 \ 3 scan0282 | |
| Modifications to a vehicle frame, axle, and springs. | 12th Dec 1913 | Box 75 \ 3 scan0283 | |
| Advisability of shortening cantilever springs and compensating with a spiral spring. | 12th Dec 1913 | Box 75 \ 3 scan0284 | |
| Dispatching blueprints for a front cross member with wider side channels and end bracket riveting schemes. | 24th Dec 1913 | Box 75 \ 3 scan0285 | |
| Comparing the deflection and stiffness of an existing 6' frame with a proposed 8' frame. | 7th Jan 1914 | Box 75 \ 3 scan0286 | |
| Continued note on frame deflection, modifications, and component repositioning. | 7th Jan 1914 | Box 75 \ 3 scan0287 | |
| Frames, attaching a blueprint and another memo in reply to notes from Mr. Royce. | 8th Jan 1914 | Box 75 \ 3 scan0288 | |
| Proposed modifications to a vehicle's wheelbase and frame to manage deflection and stresses. | 23th Jan 1914 | Box 75 \ 3 scan0289 | |
| Preference for a 6-inch frame over an 8-inch frame for new cars. | 16th Mar 1914 | Box 75 \ 3 scan0290 | |
| Confirming the satisfactory test results for some newly obtained step irons. | 13th Sep 1927 | Box 75 \ 3 scan0291 | |
| Increase to the internal diameter of bracket N.471 for the fourth cross member on the small chassis. | 1st May 1919 | Box 75 \ 3 scan0292 | |
| Increase in the length of tubing for the Underframe members of the 20 HP Chassis. | 1st Jul 1919 | Box 75 \ 3 scan0293 | |
| To the Experimental Department confirming receipt of parts from Vickers Ltd. and Accles & Pollock. | 10th Oct 1919 | Box 75 \ 3 scan0294 | |
| To Mr. Clark regarding the receipt of various parts for experiments from multiple suppliers. | 3rd Dec 1919 | Box 75 \ 3 scan0295 | |
| Record of received parts and materials from various suppliers with corresponding stores sheet numbers. | 16th Jun 1920 | Box 75 \ 3 scan0296 | |
| Continuation of a stores sheet listing tubes and solid drawn steel tubing. | 24th Jun 1920 | Box 75 \ 3 scan0297 | |
| Extract detailing an issue with a flexible steering support on the Goshawk I car, causing side member twist. | 7th Feb 1921 | Box 75 \ 3 scan0298 | |
| Clarifying the numbering of the Goshawk 11 frame cross member. | 8th Mar 1921 | Box 75 \ 3 scan0299 | |
| Instruction to process blueprints for a revised Goshawk X Frame. | 2nd Dec 1920 | Box 75 \ 3 scan0300 | |
| Alterations for the revised 'Goshawk' chassis, including wheelbase, body, and seating specifications. | 4th Dec 1920 | Box 75 \ 3 scan0301 | |
| Continuation of instructions regarding a new drawing to allow for steering elbow room. | 4th Dec 1920 | Box 75 \ 3 scan0302 | |
| Technical memo discussing design options and suggestions for the 'Kite' frame, specifically concerning spring anchorage, cross members, and frame width adjustments. | 17th Dec 1920 | Box 75 \ 3 scan0303 | |
| The design and detailing of the 'Kite' Frame Side Members and dumb irons. | 17th Dec 1920 | Box 75 \ 3 scan0304 | |
| Alterations to the Goshawk II frame. | 19th Jan 1921 | Box 75 \ 3 scan0305 | |
| Alterations to the front spring, floorboards, bump stops, and frame gauge. | 19th Jan 1921 | Box 75 \ 3 scan0306 | |
| Modifications to the 'Goshawk II' frame and the particulars of Rudge-Whitworth and Dunlop wheels. | 24th Jan 1921 | Box 75 \ 3 scan0307 | |
| Alterations to the 'Goshawk 11' side channel to suit 36' front springs. | 24th Jan 1921 | Box 75 \ 3 scan0308 | |
| The width of the back axle and frame for the 'Goshawk 11' chassis. | 25th Jan 1921 | Box 75 \ 3 scan0309 | |
| Continuation page discussing frame width specifications. | 25th Jan 1921 | Box 75 \ 3 scan0310 | |
| Alterations to the 'Goshawk 11' third cross member, scheme 671, based on a drawing from Mr. Royce. | 26th Jan 1921 | Box 75 \ 3 scan0311 | |
| Manufacturing process for the front and rear dumb irons for the 'Goshawk 11' project. | 27th Jan 1921 | Box 75 \ 3 scan0312 | |
| With sketch detailing required modifications to a front axle, spring pad, and rear dumb irons. | 27th Jan 1921 | Box 75 \ 3 scan0313 | |
| The design and modeling of the Goshawk II bonnet and radiator. | 28th Jan 1921 | Box 75 \ 3 scan0314 | |
| Alterations to the Goshawk II's 3rd cross member, referencing a print of 'N' Scheme 748. | 1st Feb 1921 | Box 75 \ 3 scan0315 | |
| Modifications to the 'Goshawk II' front dumb irons, comparing riveting and liquid brazing. | 16th Feb 1921 | Box 75 \ 3 scan0316 | |
| From Mr. Royce suggesting a revised manufacturing process for Goshawk 11 front dumb irons. | 5th Mar 1921 | Box 75 \ 3 scan0317 | |
| Mr Royce's approved modifications to the rear cross member for the Goshawk II frames and fittings. | 17th Mar 1921 | Box 75 \ 3 scan0318 | |
| The positioning of the No. 2 frame rear cross member and spare wheel on the 'Goshawk II' model. | 3rd May 1921 | Box 75 \ 3 scan0319 | |
| Mr. Royce's design feedback on the Goshawk 11 rear engine support. | 26th May 1921 | Box 75 \ 3 scan0320 | |
| Interview with John Thompson Motor Pressings Ltd. regarding the production of 'Goshawk 11' side members. | 9th Sep 1932 | Box 75 \ 3 scan0321 | |
| Cost comparison and proposal for producing side members for the 'Goshawk 11' frame. | 9th Sep 1921 | Box 75 \ 3 scan0322 | |
| Selection of steel material for Goshawk 11 frames. | 12th Oct 1921 | Box 75 \ 3 scan0323 | |
| Revised method for attaching the front dumb iron for the Goshawk 11 and requesting an opinion from the Tool Dept. | 19th Nov 1921 | Box 75 \ 3 scan0324 | |
| The results of a bump test on a Goshawk 11 chassis which resulted in a broken frame. | 1st Dec 1921 | Box 75 \ 3 scan0325 | |
| Results of a bump test on a Goshawk 11 chassis frame, noting bending and cracking failures. | 6th Dec 1921 | Box 75 \ 3 scan0326 | |
| The Goshawk 11 bumping test detailing a cracked radiator fixing gusset plate. | 7th Dec 1921 | Box 75 \ 3 scan0327 | |
| Goshawk 11 chassis bump test failure, attributing it to material quality and torsion, and recommending increased frame thickness. | 9th Dec 1921 | Box 75 \ 3 scan0328 | |
| Analysis of frame and spring breakage on Goshawk models during bump tests, proposing to thicken the frame metal as a solution. | 13th Dec 1921 | Box 75 \ 3 scan0329 | |
| Bump test on a Goshawk 11 frame, which failed twice at different points. | 28th Dec 1921 | Box 75 \ 3 scan0330 | |
| Extract discussing the pressing of side channels for frames, suggesting material thickness and perforation for sports chassis. | 30th Dec 1921 | Box 75 \ 3 scan0331 | |
| Goshawk radiator fixing with set-up springs, including instructions on frame riveting and the design of gusset plates. | 4th Jan 1922 | Box 75 \ 3 scan0332 | |
| Quality of riveting on Goshawk frames for an upcoming Bump Test. | 9th Jan 1922 | Box 75 \ 3 scan0333 | |
| Suggestion to lengthen the Goshawk 11 front dumb iron attachment to the frame. | 10th Jan 1922 | Box 75 \ 3 scan0334 | |
| Request for the inspection of newly received Goshawk Side Members made from Nickel Steel. | 14th Jan 1922 | Box 75 \ 3 scan0335 | |
| Bump tests of riveted versus bolted front dumb irons, recommending the use of bolts for safety. | 23th Jan 1922 | Box 75 \ 3 scan0336 | |
| Drawings for a longer front dumb iron fixing for the Goshawk 11 model. | 26th Jan 1922 | Box 75 \ 3 scan0337 | |
| Mr. Royce's decision on standardizing bolt schemes, specifically using a taper bush. | 28th Jan 1922 | Box 75 \ 3 scan0338 | |
| Drawing No.LeC.1528 for a parallel front dumb iron fixing on the Goshawk 11. | 28th Jan 1922 | Box 75 \ 3 scan0339 | |
| Blueprint for a Goshawk 11 dumb iron, which has been made 30% longer and includes a comparison to a Fiat part. | 11th Apr 1922 | Box 75 \ 3 scan0340 | |
| Drawing for a longer Goshawk 11 front dumb iron, retaining the bolting scheme due to riveting issues. | 27th Apr 1922 | Box 75 \ 3 scan0341 | |
| Design of the Goshawk 11 dumb iron, using larger bolts and rivets. | 10th May 1922 | Box 75 \ 3 scan0342 | |
| Mr. Royce's conclusions on different methods for fixing the Goshawk 11 front dumb iron. | 8th May 1922 | Box 75 \ 3 scan0343 | |
| Proposed schemes N.sch.1288 and N.sch.1292 for strengthening the Goshawk front cross member. | 25th May 1922 | Box 75 \ 3 scan0344 | |
| Design changes and repairability for the Goshawk front cross member. | 26th May 1922 | Box 75 \ 3 scan0345 | |
| Goshawk II frames and fittings, agreeing to soften parts and discussing production issues due to axle troubles and the lack of a standardisation sheet. | 4th Jan 1923 | Box 75 \ 3 scan0346 | |
| Chassis frame deflections on a 20 HP model and proposing experiments to improve rigidity. | 28th Aug 1923 | Box 75 \ 3 scan0347 | |
| The requirement for rear wing stays and fittings for a 5-Goshawk-11 car at Bromley. | 14th Sep 1923 | Box 75 \ 3 scan0348 | |
| Confirming the accuracy of figures relating to G11 frame deflection. | 20th Sep 1923 | Box 75 \ 3 scan0349 | |
| Blueprint showing frame deflection measurements for a 20-HP chassis, with and without tie-rods. | 17th Sep 1925 | Box 75 \ 3 scan0350 | |
| Clarifying figures on the Goshawk II frame deflection chart. | 20th Sep 1923 | Box 75 \ 3 scan0351 | |
| Frame deflections on the Goshawk II, questioning measurements and proposing modifications. | 20th Sep 1923 | Box 75 \ 3 scan0352 | |
| Blueprint showing tests on a 20 HP chassis frame with and without tie-rods. | 22th Sep 1923 | Box 75 \ 3 scan0353 | |
| Frame deflection and body mounting on the 20 HP and Goshawk 11 chassis. | 29th Sep 1923 | Box 75 \ 3 scan0354 | |
| Improvements to car body stiffness, scuttle insulation, and isolation from engine vibration. | 1st Oct 1923 | Box 75 \ 3 scan0355 | |
| Load distribution for experiments on Goshawk tie-bars. | 1st Oct 1923 | Box 75 \ 3 scan0356 | |
| Measuring the frame deflection on a 20 HP frame with a static load. | 10th Oct 1923 | Box 75 \ 3 scan0357 | |
| Diagram and chart showing frame deflections under load with different tie rod and stiffener configurations for a 20 HP chassis. | 17th Oct 1923 | Box 75 \ 3 scan0358 | |
| Unexpected deflection curves in Goshawk tie-bars and suggesting further tests. | 12th Oct 1923 | Box 75 \ 3 scan0359 | |
| Tests at Hooper's Works investigating body rattles and frame stiffness on 40/50 and Goshawk models, detailing defects and proposed redesigns. | 12th Oct 1923 | Box 75 \ 3 scan0360 | |
| | | | |