Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1797 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Manufacturing methods for chassis propeller shafts using welded tubes.14th Dec 1936Box 148 \ 4  scan0050
Comparing the propeller shaft designs of the Wraith, Bentley, and Phantom III models.17th Dec 1936Box 148 \ 4  scan0051
Modification to the Hardy Spicer type propeller shaft for the Phantom III, Wraith, and Bentley models.27th Jan 1937Box 148 \ 4  scan0052
Directive to continue with the original weldless tube propeller shaft due to failures with the experimental welded tube.5th Feb 1937Box 148 \ 4  scan0053
Examination and report on the microstructure and strength of a welded propeller shaft.24th Feb 1937Box 148 \ 4  scan0054
Standardising the Hardy Spicer propeller shaft instead of experimenting with a welded swaged tube.25th Feb 1937Box 148 \ 4  scan0055
Request to Hardy, Spicer & Co. for a shorter propeller shaft for testing purposes.24th May 1937Box 148 \ 4  scan0056
Letter from Hardy Spicer & Co. Limited confirming they are proceeding with a new Propeller Shaft and enclosing an official acknowledgment.28th May 1937Box 148 \ 4  scan0057
Acknowledgment of order from Hardy Spicer & Co. Limited for one set of parts.25th May 1937Box 148 \ 4  scan0058
Cost-reduction modification to the propeller shaft damper for the 25/30 and Bentley models.31th May 1937Box 148 \ 4  scan0059
Damper issues proposing an alternative bonded friction material instead of phosphor bronze.31th May 1937Box 148 \ 4  scan0060
Requesting a confirmatory order for a propeller shaft with a modified length from Hardy Spicer Ltd.29th May 1937Box 148 \ 4  scan0061
Letter to Hardy Spicer & Co. Ltd. regarding balance and noise issues with propeller shafts supplied for testing.3rd Aug 1937Box 148 \ 4  scan0062
Letter from Hardy Spicer & Co. regarding the balancing of shafts, fitting lubricators, and joint types.9th Aug 1937Box 148 \ 4  scan0063
Letter to Messrs. Hardy Spicer & Co. Ltd. regarding a replacement propellor shaft.10th Aug 1937Box 148 \ 4  scan0064
Supply and balancing of propeller shafts from Hardy Spicer, specifically concerning the fitting of grease nipples.16th Aug 1937Box 148 \ 4  scan0065
The supply of Hardy-Spicer grease nipples for propeller shafts.19th Aug 1937Box 148 \ 4  scan0066
The supply of Propeller Shaft Dampers for Bentley and 25/30 HP chassis.1st Sep 1937Box 148 \ 4  scan0067
Non-standard Hardy Spicer propeller shaft coupling nuts on Wraith III and Bentley models.2nd Sep 1937Box 148 \ 4  scan0068
Revised method for joining the universal joint to the propeller shaft after a failure.11th Mar 1938Box 148 \ 4  scan0069
Letter to Hardy Spicer & Co. Ltd. enquiring about the guarantee for their propeller shafts.24th May 1938Box 148 \ 4  scan0070
Letter from Hardy Spicer & Co. Ltd. discussing guarantee periods and enclosing a quotation form.26th May 1938Box 148 \ 4  scan0071
Blank quotation letterhead from Hardy Spicer & Co. Ltd for supplying parts.30th May 1938Box 148 \ 4  scan0072
Guarantee for Hardy Spicer propellor shafts.30th May 1938Box 148 \ 4  scan0073
Letter to J.A. Daniell of Messrs. Hardy, Spicer & Co., Ltd. regarding the acceptance of a one-year guarantee.31th May 1938Box 148 \ 4  scan0074
Letter to Hardy Spicer & Co. Ltd. regarding a propeller shaft failure during a dynamometer test.5th Jul 1938Box 148 \ 4  scan0075
Requesting a broken propeller shaft be forwarded to the Hardy Spicer Co. for examination after failure.5th Jul 1938Box 148 \ 4  scan0076
Letter from Hardy Spicer & Co. Ltd. discussing issues with a shaft following dynamometer tests.6th Jul 1938Box 148 \ 4  scan0077
Letter to Hardy Spicer & Co. Ltd. discussing a shaft failure during dynamometer testing due to heat and seizing.7th Jul 1938Box 148 \ 4  scan0078
Letter from Hardy Spicer & Co. Ltd. discussing joint performance in dynamometer tests for different engine types.8th Jul 1938Box 148 \ 4  scan0079
Letter to Hardy Spicer & Co. regarding the analysis of a star centre from a joint after a dynamometer test.14th Sep 1938Box 148 \ 4  scan0080
Requesting a Trunnion part be posted to the Hardy Spicer Company.14th Sep 1938Box 148 \ 4  scan0081
Letter from Hardy Spicer & Co. Limited acknowledging receipt of a letter and advising of a delay.15th Sep 1938Box 148 \ 4  scan0082
Letter from Hardy Spicer & Co. Ltd. discussing joint hardness specifications and measurements.6th Oct 1938Box 148 \ 4  scan0083
The second page of a typed letter to G. H. Grylls Esq. signed by a Director.6th Oct 1938Box 148 \ 4  scan0084
Letter from Hardy Spicer & Co. providing a layout for a Rubber Mounted Needle Bearing Midship Housing.12th Oct 1938Box 148 \ 4  scan0085
Suggestion to modify propeller shaft joints on B.111, B.50 and Silver Wraith models.14th Oct 1938Box 148 \ 4  scan0086
Letter from Hardy Spicer & Co. Ltd. discussing journal investigation and radial clearance tolerances.1st Nov 1938Box 148 \ 4  scan0087
Adoption of the RR universal joint with needle bearings, weighing its benefits against the increased cost.9th Nov 1938Box 148 \ 4  scan0088
Letter from Hardy Spicer & Co. discussing the case depth of a journal and a proposed new joint design.10th Nov 1938Box 148 \ 4  scan0089
Letter to Hardy Spicer & Co. Ltd. regarding drawing GCD.1011 for a 1350 type joint for the Wraith chassis, requesting three test shafts.10th Nov 1938Box 148 \ 4  scan0090
Letter from Bendix Limited concerning the Weiss constant velocity universal joint.11th Nov 1938Box 148 \ 4  scan0091
Requesting a hardness check on Hardy Spicer propeller shaft spiders and R.R. Ph.III outer races.15th Nov 1938Box 148 \ 4  scan0092
Letter from Hardy Spicer & Co. regarding a proposed change from 1300 to 1350 series splines and a discrepancy in Rockwell hardness tests.16th Nov 1938Box 148 \ 4  scan0093
Letter from Hardy, Spicer & Co. regarding the supply and testing of shafts and joints.16th Nov 1938Box 148 \ 4  scan0094
Letter from the Experimental Department to a supplier requesting a specific propeller shaft slip joint for a Bentley chassis.23th Nov 1938Box 148 \ 4  scan0095
Letter from Hardy Spicer & Co. Ltd. discussing the specifications and availability of different types of universal joints.25th Nov 1938Box 148 \ 4  scan0096
Testing and implementing a larger 1350 type joint for the Wraith propellor shaft.25th Nov 1938Box 148 \ 4  scan0097
Advice note from Hardy Spicer & Co. Ltd. for the dispatch of Spicer Joints and associated parts.26th Nov 1938Box 148 \ 4  scan0098
Letter to J.A. Daniell of Hardy Spicer & Co. regarding the supply and specification of joints.28th Nov 1938Box 148 \ 4  scan0099
Laboratory report on the results of Rockwell hardness tests for propeller shaft spiders and Phantom III outer races.29th Nov 1938Box 148 \ 4  scan0100
Letter from Hardy Spicer & Co. Ltd. regarding a joint with a 26-degree angle and an enclosed print.30th Nov 1938Box 148 \ 4  scan0101
Acknowledgment of order from Hardy Spicer & Co. Limited for a single part with a note about pricing.1st Dec 1938Box 148 \ 4  scan0102
Letter to Hardy Spicer & Co. Ltd. regarding the replacement of a wide-angle joint with a standard 1550 type joint.5th Jan 1939Box 148 \ 4  scan0103
Letter from Hardy Spicer & Co. Ltd. confirming an order modification for a joint layout.9th Jan 1939Box 148 \ 4  scan0104
Inquiry to Hardy Spicer & Co. about servicing the 1350 type propellor shaft on the Wraith chassis.18th Jan 1939Box 148 \ 4  scan0105
Letter from Hardy Spicer & Co. Ltd. explaining the use of pressings in nipple threads during transit.19th Jan 1939Box 148 \ 4  scan0106
Confirming a telephone order for a propeller shaft from supplier Hardy Spicers.5th Apr 1939Box 148 \ 4  scan0107
Telegram received by telephone concerning the arrival of a shaft in Derby.13th Apr 1939Box 148 \ 4  scan0108
Telegram confirming the arrival details for shaft 90071 in Derby.13th Apr 1934Box 148 \ 4  scan0109
Letter to a supplier regarding measurements and distortion of a joint.28th Apr 1939Box 148 \ 4  scan0110
Letter to Delco-Remy & Hyatt Ltd. requesting three New Departure Seal Bearings for immediate test.5th May 1939Box 148 \ 4  scan0111
Letter from Delco-Remy & Hyatt Ltd regarding the urgent supply of bearings for experimental purposes.6th May 1939Box 148 \ 4  scan0112
Trial and fitting of a new type of Propellor Shaft Centre Bearing following a failure.8th May 1939Box 148 \ 4  scan0113
Requesting a rig test on a propeller shaft centre bearing to compare grease retaining life.12th May 1939Box 148 \ 4  scan0114
Letter to a supplier clarifying manufacturing tolerances for propeller shaft universal joint components.12th May 1939Box 148 \ 4  scan0115
Letter to Messrs. Hardy Spicer & Co. Ltd. regarding the sending of universal joint parts for inspection against a drawing.12th May 1939Box 148 \ 4  scan0116
The correct fitting position of the propeller shaft sliding joint.6th Jun 1939Box 148 \ 4  scan0117
Instruction on fitting the sliding joint of the rear propeller shaft for B.V. B.50 & Silver Wraith models.6th Jun 1939Box 148 \ 4  scan0118
Confirming a request to hand over a new propeller shaft bearing for endurance testing.24th Jun 1939Box 148 \ 4  scan0119
Letter to Hardy Spicer & Co. Ltd. specifying the balance and run-out limits for divided propellor shafts.27th Jun 1939Box 148 \ 4  scan0120
Letter to Messrs. Hardy Spicer & Co. Ltd. regarding the return of divided shafts for corrective treatment.27th Jun 1939Box 148 \ 4  scan0121
Requesting the despatch of a B.V. propeller shaft to Messrs. Hardy Spicer & Co. Ltd. for re-balancing and straightening.27th Jun 1939Box 148 \ 4  scan0122
Unbalance issues with rationalised chassis propellor shafts and supplier coordination.29th Jun 1939Box 148 \ 4  scan0123
Instruction to return all shafts received for the fitting of new nose pieces with machining allowance and re-balancing.29th Jun 1939Box 148 \ 4  scan0124
Letter from Hardy Spicer & Co. regarding divided propeller shafts and revisions to the concentricity of midship bearing shafts.29th Jun 1939Box 148 \ 4  scan0125
Internal memorandum regarding the ordering and specification of propeller shaft centre bearings.30th Jun 1939Box 148 \ 4  scan0126
Request to add a balance tolerance note to the Intermediate Propeller Shaft drawing.1st Jul 1939Box 148 \ 4  scan0127
Brief review on the condition of the propellor shaft centre bearing G.C.D. 247 after a 90-hour test rig.3rd Jul 1939Box 148 \ 4  scan0128
Decision that suppliers will deliver finished machined intermediate propeller shafts due to machining difficulties.10th Jul 1939Box 148 \ 4  scan0129
Letter to supplier Hardy Spicer & Co. Ltd. regarding unsatisfactory welding and machining of the intermediate propeller shaft.18th Jul 1939Box 148 \ 4  scan0130
The improved lubrication of the propeller shaft centre bearing.19th Jul 1939Box 148 \ 4  scan0131
Drawing for a propellor shaft for the over-hung pinion axle on the Ripple car.21th Jul 1939Box 148 \ 4  scan0132
Request to Hardy Spicer & Co. Ltd. for drawings of joints smaller than the 1300 type for use in an experimental rig.11th Aug 1939Box 148 \ 4  scan0133
Proposal to use a gearbox with a single propeller shaft and the resulting body modifications.14th Nov 1939Box 148 \ 4  scan0134
Letter to Hardy Spicer & Co. Ltd. inquiring about a propeller shaft design seen on American cars.12th Mar 1940Box 148 \ 4  scan0135
Mandating the fitting of isolated propellor shaft bearings to all production B.V. cars following experimental tests.14th Mar 1940Box 148 \ 4  scan0136
Letter from Hardy Spicer & Co. Ltd. discussing the transfer of spline from the propeller shaft to the gearbox.14th Mar 1940Box 148 \ 4  scan0137
Confirmation memo regarding modifications to propeller shaft needle bearings and cages.21th Mar 1940Box 148 \ 4  scan0138
Letter to Hardy Spicer & Co. Ltd. regarding a propeller shaft sliding joint arrangement.28th Mar 1940Box 148 \ 4  scan0139
Cross-section diagram of a gearbox shaft featuring an oil retaining thread.2nd Apr 1940Box 148 \ 4  scan0140
Letter from Hardy Spicer & Co. Ltd. discussing the arrangement of splines on a propeller shaft compared to a sketch provided by Rolls Royce.2nd Apr 1940Box 148 \ 4  scan0141
Drawing illustrating stress or flow lines in a T-shaped component.6th Sep 1940Box 148 \ 4  scan0142
Blueprints for a modified propeller shaft for the Ripplet Chassis.6th Sep 1940Box 148 \ 4  scan0143
Request to arrange for an isolated centre bearing to be fitted to a propeller shaft on a car.22th Apr 1940Box 148 \ 4  scan0144
Requesting the handover of 12 sets of isolated propellor shaft bearing parts to Mr. Reid.24th Apr 1940Box 148 \ 4  scan0145
Confirming the completion of 12 sets of rubber-mounted support brackets for Bentley V Production Cars.12th Apr 1940Box 148 \ 4  scan0146
Project for a simplified propeller shaft centre bearing for the Senior Range.30th May 1940Box 148 \ 4  scan0147
On a project for a simplified propeller shaft centre bearing for the Senior Range.30th May 1940Box 148 \ 4  scan0148
Notes and calculations for propeller shaft specifications based on a formula from Vauxhall and Hardy Spicers.8th Jun 1940Box 148 \ 4  scan0149


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙