Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2132 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Status report on the 'Work in Hand' for the R.A.F. Launching Gear Section.21th Feb 1941Box 175 \ 2  img077
Proposal to submit an 8-cylinder aluminium block engine to the Air Ministry for an R.A.F. winch project.26th Feb 1941Box 175 \ 2  img078
Letter to Wing Commander Buxton confirming the use of a 1/4 inch cable on a winch and requesting the minimum satisfactory drum size.26th Feb 1941Box 175 \ 2  img079
Letter to Wing Commander Buxton requesting the minimum drum size for a 1/4 inch cable to be used on a winch.26th Feb 1941Box 175 \ 2  img080
Letter from the Royal Air Force discussing the specifications for a launching winch.1st Mar 1941Box 175 \ 2  img081
Letter to The Hoffmann Manufacturing Co. urgently requesting a list of ball and roller bearings for an experimental project.3rd Mar 1941Box 175 \ 2  img082
Acknowledgement of an enquiry from Hoffmann Manufacturing Co. Ltd.5th Mar 1941Box 175 \ 2  img083
Letter to Hydraulic Coupling & Engineering Co. Ltd. discussing installation details for hydraulic couplings.6th Mar 1941Box 175 \ 2  img084
Letter from the Ministry of Aircraft Production regarding a change in contact for a glider launching winch.6th Mar 1941Box 175 \ 2  img085
Letter to Hydraulic Coupling & Engineering Co. Ltd. regarding a fluid coupling installation and performance specifications.6th Mar 1941Box 175 \ 2  img086
Progress report on the development of launching gear, detailing completed work and work in hand.7th Mar 1941Box 175 \ 2  img087
Letter regarding the design of a 10-inch launching winch drum, inviting representatives to review drawings.8th Mar 1941Box 175 \ 2  img088
Letter from Hoffmann Manufacturing regarding a four-week lead time for bearings.10th Mar 1941Box 175 \ 2  img089
Letter from the Royal Air Force regarding a delayed visit concerning drawings for a launching winch.12th Mar 1941Box 175 \ 2  img090
Letter to Hoffmann Manufacturing Co. Ltd. requesting to proceed with an order for three sets of bearings.14th Mar 1941Box 175 \ 2  img091
Specification document detailing design instructions for a new 6-cylinder aluminium B.60 engine.15th Mar 1941Box 175 \ 2  img092
List of 15 requested design features for inclusion in a new specification.18th Mar 1941Box 175 \ 2  img093
Urgent request to repurchase a unique high-power Phantom III engine from a private owner for R.A.F. research during the war.18th Mar 1941Box 175 \ 2  img094
Necessary modifications for a launching winch following meetings with a Flying Officer.24th Mar 1941Box 175 \ 2  img095
List of required design alterations for a winch, including estimated timeframes for completion.24th Mar 1941Box 175 \ 2  img096
List of agreed modifications for a launching winch following meetings with Flying Officer Cronfeldt.24th Mar 1941Box 175 \ 2  img097
List of required design alterations for a winch, along with time estimates for each task.24th Mar 1941Box 175 \ 2  img098
Letter from Hoffmann Manufacturing confirming an order for bearings and outlining pricing terms due to current conditions.24th Mar 1941Box 175 \ 2  img099
Minutes of a production meeting regarding material supply, engine production, and personnel.24th Mar 1941Box 175 \ 2  img100
Letter detailing agreed modifications for a winch used for launching gliders.26th Mar 1941Box 175 \ 2  img101
List of required modifications and redesigns for a winch and cable system, including timelines.26th May 1941Box 175 \ 2  img102
Time requirements for various vehicle components and a statement on production quality.26th Mar 1941Box 175 \ 2  img103
Letter from the Royal Air Force confirming modifications to the specification for a launching winch.28th Mar 1941Box 175 \ 2  img104
List of numbered specifications for a winch, cable, brakes, and vehicle controls.28th Feb 1941Box 175 \ 2  img105
Telephone conversation with E. R. Hall about the sale of a Phantom III engine and a Wraith engine.28th Feb 1941Box 175 \ 2  img106
Brief typed note stating the location of a Phantom III engine.30th Mar 1941Box 175 \ 2  img107
Letter to Group Captain Harvey at R.A.F. Ringway regarding probable delay and a new design completion date.30th Mar 1941Box 175 \ 2  img108
Unfavorable impression regarding a profit attempt on Hall's engine.30th Sep 1941Box 175 \ 2  img109
Letter from Alvis Ltd forwarding a letter addressed to Group Captain Harvey that was found inside some blueprints.31th Mar 1941Box 175 \ 2  img110
Letter of apology to Group Captain Harvey for a delay in delivery due to an internal error.31th Mar 1941Box 175 \ 2  img111
Letter from the Royal Air Force regarding modifications to a winch design and an expected trial date.8th Apr 1941Box 175 \ 2  img112
Letter from a Royal Air Force Wing Commander to Mr. Robotham concerning the progress of winch drawings.20th Apr 1941Box 175 \ 2  img113
Letter to Wing Commander Buxton regarding a delay in the design of a winch due to specification changes.28th Apr 1941Box 175 \ 2  img114
Requesting prints of a Launching Winch project for record-keeping purposes as work is being held up.29th Apr 1941Box 175 \ 2  img115
Requesting prints of 'Launching Winch' designs be made for archival purposes due to the project being put on hold.29th Apr 1941Box 175 \ 2  img116
Letter to Squadron-Leader Brie postponing a visit until design work for a winch is completed.14th May 1941Box 175 \ 2  img117
Payment for two invoices for various bearings from the Hoffmann Manufacturing Co. Ltd.20th May 1941Box 175 \ 2  img118
Asking for and specifying a recommended material for production.26th May 1941Box 175 \ 2  img119
Letter from the Ministry of Aircraft Production confirming a request for the design of a glider launching winch.26th May 1941Box 175 \ 2  img120
Calculation for the weight per length of a 45 cwt. winch cable.30th May 1941Box 175 \ 2  img121
Letter to the Ministry of Aircraft Production regarding a winch design, project hours, and timeline.5th Jun 1941Box 175 \ 2  img122
Specification document for a launching gear, detailing the power unit, clutch, gears, and cable systems.5th Jun 1941Box 175 \ 2  img123
List of technical specifications for vehicle components including the throttle, clutch, fuel tank, and operator's cabin.5th Jun 1941Box 175 \ 2  img124
Winch drum diameters and suggested gear ratios, including performance calculations.5th Jun 1941Box 175 \ 2  img125
Explanation for why pull and speed curves are depicted as narrow bands.5th Jun 1941Box 175 \ 2  img126
Blueprint graph detailing launching performance for a 10-inch drum, showing cable speed versus distance for various gear ratios.5th Jun 1941Box 175 \ 2  img127
Graph plotting winch pull in cable (lbs) against different gear ratios.5th Jun 1941Box 175 \ 2  img128
Graph plotting speed and cable pull against distance for a launching system with a 12-inch drum.31th May 1941Box 175 \ 2  img129
Performance graph showing cable pull against distance for a winch with different gear ratios.31th May 1941Box 175 \ 2  img130
The cable drum diameters and gear ratios for a launching winch.21th May 1941Box 175 \ 2  img131
Page detailing the assumptions and calculations for cable speed and pull graphs, based on engine performance.31th May 1940Box 175 \ 2  img132
Specification document for launching gear.31th May 1940Box 175 \ 2  img133
Specification sheet detailing various vehicle components and systems.31th May 1940Box 175 \ 2  img134
Technical document detailing various winch drum diameters and gear ratios.31th May 1940Box 175 \ 2  img135
Note explaining why pull and speed curves are shown in narrow bands representing layers of cable.31th May 1940Box 175 \ 2  img136
Graph plotting cable pull against distance for various gear ratios and speed.1st Jan 1941Box 175 \ 2  img137
Graph plotting cable pull in pounds against run distance in feet for a gear ratio test.1st Jan 1941Box 175 \ 2  img138
Graph plotting cable speed and pull against distance for a 12' drum system at different ratios.31th May 1944Box 175 \ 2  img139
Graph plotting cable pull in pounds against distance in feet for various gear ratios.31th May 1944Box 175 \ 2  img140
Reviewing the man-hours and timeline required to complete the Launching Winch.5th Jun 1941Box 175 \ 2  img141
Launching winch scheme, providing blueprints and listing additional jobs required.5th Jun 1941Box 175 \ 2  img142
The design drawings for a launching winch and gear.18th Jun 1941Box 175 \ 2  img143
The flanges connecting driving and driven units to a fluid coupling for a launching winch.10th Jul 1941Box 175 \ 2  img144
Secret memo describing the screw gear for a drum winding carriage on a launching winch.10th Jul 1941Box 175 \ 2  img145
Design of a reduction gear for a winch, including gear ratios and materials.22th Jul 1941Box 175 \ 2  img146
New scheme for a cable drum for the Launching Gear.30th Jul 1941Box 175 \ 2  img147
Technical memorandum on the stresses and loading of a winch reduction gear.31th Jul 1941Box 175 \ 2  img148
Review of the winch programme for the launching gear, detailing completed schemes, work in hand, and outstanding designs.8th Aug 1941Box 175 \ 2  img149
Covering letter to Mr. Shackleton of the Ministry of Aircraft Production regarding a winch.22th Aug 1941Box 175 \ 2  img150
Letter concerning a controversy over quantities supplied by The Hoffmann Mfg. Co. Ltd. and the return of surplus items.22th Aug 1941Box 175 \ 2  img151
Letter from The Hoffmann Mfg. Co. Ltd. regarding a discrepancy in a bearing order.19th Aug 1941Box 175 \ 2  img152
Invoices for bearings from Hoffmann Manufacturing Co. and a request for a covering order due to quantity discrepancies.1st Aug 1941Box 175 \ 2  img153
The hand throttle control for the launching gear winch.5th Sep 1941Box 175 \ 2  img154
Operation of the launching gear clutch and necessary modifications to the mechanism.5th Sep 1941Box 175 \ 2  img155
Follow-up letter to Squadron Leader Brie regarding a previous correspondence, with an attached copy.14th Sep 1941Box 175 \ 2  img156
Letter to the Royal Air Force explaining delays in the design of a launching winch and suggesting a visit.22th Aug 1941Box 175 \ 2  img157
Guard for a launching gear cable drum.9th Sep 1941Box 175 \ 2  img158
Listing original drawings for launching gear components and a radiator plaque, issued for record purposes.24th Sep 1942Box 175 \ 2  img159
Secret memo detailing modifications for a 40 m.m. type BD Gun non-elevating mounting.24th Aug 1940Box 175 \ 3  img001
Blueprints and modifications for a 40 mm Naval Gun Type BD ejector trip.24th Aug 1940Box 175 \ 3  img002
Proposing to treat the 40mm Naval Gun and its Mounting as two separate units for future projects.26th Aug 1940Box 175 \ 3  img003
Letter to The British Power Boat Co. Ltd. concerning the specifications for 40 mm, type BD gun mountings.7th Aug 1940Box 175 \ 3  img004
Letter concerning the estimated weight of power-driven gun mountings and allocation to craft.27th Aug 1940Box 175 \ 3  img005
Appendix listing the approximate weights of various gun mountings and ammunition components.27th Aug 1940Box 175 \ 3  img006
Extract from a memo regarding the production of a List of Parts (L.O.P.) for a non-elevating gun mounting.28th Aug 1940Box 175 \ 3  img007
Letter from the Admiralty regarding revised drawings for a 40mm mounting and proposing a meeting.28th Aug 1940Box 175 \ 3  img008
Query regarding difficulties with ammunition and a request for supplies of half-inch American ammunition for testing.28th Aug 1940Box 175 \ 3  img009
Specifications for an ammunition tray for a 40mm gun on a pedestal mounting.31th Aug 1940Box 175 \ 3  img010
The status of various gun section projects, split into work in progress and completed work.2nd Sep 1940Box 175 \ 3  img011
Development and procurement of a body strap for a Type B.D. Gun with supplier Hampton & Sons Ltd.2nd Sep 1940Box 175 \ 3  img012
Secret memo discussing the mounting, ammunition, and armour specifications for a 40mm B.D. gun on an M.T. Boat.2nd Sep 1940Box 175 \ 3  img013
Relationships with customers and contractors, including the Admiralty and British Power Boat Co., concerning a gun project.27th Aug 1940Box 175 \ 3  img014
Letter from H.M.S. EXCELLENT to Mr. Robotham regarding drawings and a description of a gun.2nd Sep 1940Box 175 \ 3  img015
Letter to Captain Slayter regarding the manufacturing progress and development of a 40mm gun.4th Sep 1940Box 175 \ 3  img016
Letter to the Admiralty concerning a visit to Derby to discuss the mountings for the 40mm gun.4th Sep 1940Box 175 \ 3  img017


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙