| Description | Date | Identifier | |
| Technical memorandum with annotated sketches discussing design improvements and weight-saving measures for Super Sports pedals. | 23th Jan 1928 | West Wittering \ R \ January1928-March1928 25 | |
| Induction and exhaust pipe designs for Super Sports models. | 24th Jan 1928 | West Wittering \ R \ January1928-March1928 26 | |
| Comparison of different manifold pipe designs with engineering notes. | 24th Jan 1928 | West Wittering \ R \ January1928-March1928 27 | |
| Hand-drawn schematic diagram of a piping or lubrication system for a multi-cylinder engine. | 9th Jan 1928 | West Wittering \ R \ January1928-March1928 29 | |
| Moving the Autovac to a higher position, away from the exhaust. | 24th Jan 1928 | West Wittering \ R \ January1928-March1928 30 | |
| Deciding to use the 6 port induction scheme over the 4 port arrangement. | 21th Jan 1928 | West Wittering \ R \ January1928-March1928 31 | |
| Alternative slotted induction pipe design for EAC. 14, comparing underfed and top feed systems. | 24th Jan 1928 | West Wittering \ R \ January1928-March1928 32 | |
| Design of exhaust manifolds and pipes for the Super Sports 20HP model. | 24th Jan 1928 | West Wittering \ R \ January1928-March1928 33 | |
| Blueprint for a slot-type induction pipe. | 23th Jan 1928 | West Wittering \ R \ January1928-March1928 34 | |
| Technical memorandum discussing the design and manufacture of propeller shaft universal joints. | 25th Jan 1928 | West Wittering \ R \ January1928-March1928 35 | |
| Two annotated design proposals for a propeller shaft assembly, focusing on oil retention and structural integrity. | 30th Jan 1928 | West Wittering \ R \ January1928-March1928 36 | |
| Production strategy and body design for the new EAC. 10 sports chassis. | 30th Jan 1928 | West Wittering \ R \ January1928-March1928 37 | |
| Customer feedback from Lord Curzon on a Phantom vehicle. | 30th Jan 1928 | West Wittering \ R \ January1928-March1928 38 | |
| Car performance, design philosophy, and comparisons to competitors. | 30th Jan 1928 | West Wittering \ R \ January1928-March1928 39 | |
| Schedule N. sch. 2541, which details the front anchorage of rear springs, brake carrier levers, and other chassis modifications. | 31th Jan 1928 | West Wittering \ R \ January1928-March1928 40 | |
| General arrangement of a Servo and Balance Lever, proposing a change from steel to ferodo lining. | 31th Jan 1928 | West Wittering \ R \ January1928-March1928 41 | |
| Confirmation of a telegram from R. Royce regarding engine dimensions and cylinder construction. | 31th Jan 1928 | West Wittering \ R \ January1928-March1928 42 | |
| Approving a design for crankshaft oiling and discussing overall car development. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 43 | |
| Suggesting the use of a Bostock & Bramley servo worm gear to handle heavy loads. | 2nd Feb 1928 | West Wittering \ R \ January1928-March1928 44 | |
| Materials and operation of car engine crankshaft dampers, specifically addressing friction surfaces and vibration periods. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 45 | |
| Performance and non-skid properties of Dunlop Triple Stud tyres on rough and clay roads. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 46 | |
| Faults found with the ignition hand control and magneto advance mechanism. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 47 | |
| Experiments on engine mountings and a proposed solution involving a subframe for damping purposes. | 4th Feb 1928 | West Wittering \ R \ January1928-March1928 48 | |
| Typed note discussing the peculiarities of a scheme involving torque, the clutch, and the chassis frame. | 9th Jan 1928 | West Wittering \ R \ January1928-March1928 49 | |
| Readiness of a Standard Phantom and the design of a Sports Phantom carburettor. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 50 | |
| Correction to a gearbox casting layout, specifically the web carrying the servo bearing. | 6th Feb 1928 | West Wittering \ R \ January1928-March1928 51 | |
| Requesting the supply of wing stays and step-irons for a Jarvis Body, to be sent with a dummy chassis. | 9th Feb 1928 | West Wittering \ R \ January1928-March1928 52 | |
| Wind resistance and body modifications for the Continental Phantom. | 9th Feb 1928 | West Wittering \ R \ January1928-March1928 53 | |
| The status of various components for the E.A.C. 10 Phantom Two vehicle. | 10th Feb 1928 | West Wittering \ R \ January1928-March1928 54 | |
| Proposed locking mechanism for dipping headlamps and a potential issue with cleaning. | 11th Feb 1928 | West Wittering \ R \ January1928-March1928 55 | |
| Arrangement of brake differentials, enclosing a schematic and requesting an extra print. | 13th Feb 1928 | West Wittering \ R \ January1928-March1928 56 | |
| Modifications to the cross in frame for brake gear clearance. | 3rd Feb 1928 | West Wittering \ R \ January1928-March1928 57 | |
| Choice between Schatz and New Departure bearings, with suggestions for fitting. | 14th Feb 1928 | West Wittering \ R \ January1928-March1928 58 | |
| With a sketch discussing oil and water sealing methods for bearings. | 14th Feb 1928 | West Wittering \ R \ January1928-March1928 59 | |
| Design alternatives for a new 6-inch universal joint and propeller shaft, replacing the original 5-inch version. | 2nd Feb 1928 | West Wittering \ R \ January1928-March1928 60 | |
| Revised pedal support and awaiting further comments before detailing. | 15th Feb 1928 | West Wittering \ R \ January1928-March1928 61 | |
| Relocating the headlamp dipping lever on a Barker Sports car due to its inconvenient position. | 16th Feb 1928 | West Wittering \ R \ January1928-March1928 62 | |
| Request to measure the distance between a vehicle's screen and wheel due to a suspected clearance error by the coachbuilder, Hooper's. | 16th Feb 1928 | West Wittering \ R \ January1928-March1928 63 | |
| Expressing anxiety over delays in preparing two chassis models for trial and outlining the main improvements required. | 7th Feb 1928 | West Wittering \ R \ January1928-March1928 64 | |
| Manufacturing proposal for a 6-inch universal joint's rings. | 18th Feb 1928 | West Wittering \ R \ January1928-March1928 65 | |
| Comparison of cross web and diagonal web piston designs, concluding that the diagonal web piston is the superior design for car work. | 18th Feb 1928 | West Wittering \ R \ January1928-March1928 66 | |
| Suggestions for engine mounting and the use of dampers to reduce vibration. | 19th Feb 1928 | West Wittering \ R \ January1928-March1928 67 | |
| Effectiveness and design of hydraulic dampers for the Phantom and 20HP models, including a suggested design sketch. | 22th Feb 1928 | West Wittering \ R \ January1928-March1928 68 | |
| Arguing against a fully automatic charge control system, proposing a simpler, driver-operated alternative. | 22th Feb 1928 | West Wittering \ R \ January1928-March1928 69 | |
| Modifications to Phantom valve springs due to insufficient clearance. | 2nd Feb 1928 | West Wittering \ R \ January1928-March1928 70 | |
| Chassis and body modifications for the Continental Phantom EAC.14 to increase interior space. | 21th Feb 1928 | West Wittering \ R \ January1928-March1928 71 | |
| Viability of Bohnalite steel strut pistons and duralumin connecting rods. | 21th Feb 1928 | West Wittering \ R \ January1928-March1928 72 | |
| Positioning of the Magneto Drive in relation to the Phantom model. | 22th Feb 1928 | West Wittering \ R \ January1928-March1928 73 | |
| Blueprints for a crankchamber, covering starter motor mounting stiffness and potential improvements. | 22th Feb 1928 | West Wittering \ R \ January1928-March1928 74 | |
| Blueprint for a cylinder head, focusing on valve passages, rockers, and gear. | 22th Feb 1928 | West Wittering \ R \ January1928-March1928 75 | |
| From E. to HS. querying the purpose of a small locating screw on the 20HP valve gear. | 23th Feb 1928 | West Wittering \ R \ January1928-March1928 76 | |
| Modifications to the Hand Brake Lever Shaft and Equaliser. | 23th Feb 1928 | West Wittering \ R \ January1928-March1928 77 | |
| The valve gear, suggesting duralumin for rocker bar supports and discussing thermal expansion. | 2nd Feb 1928 | West Wittering \ R \ January1928-March1928 78 | |
| Starter motor, sending drawing LeC. 2517 and returning drawing LeC. 2496. | 23th Feb 1928 | West Wittering \ R \ January1928-March1928 79 | |
| Modifications to a starter motor, referencing blueprint LeC. 2517 and a redesigned end cover. | 23th Feb 1928 | West Wittering \ R \ January1928-March1928 80 | |
| Modifications and improvements for test cars codenamed INDIA 3 and INDIA 4. | 24th Feb 1936 | West Wittering \ R \ January1928-March1928 81 | |
| On the reliability of the American A.C. petrol pump with a canvas diaphragm, and a suggested alternative design for the Phantom. | 24th Feb 1928 | West Wittering \ R \ January1928-March1928 82 | |
| Requesting a progress report on a 10,000-mile Phantom experiencing body and fitting issues. | 24th Feb 1928 | West Wittering \ R \ January1928-March1928 83 | |
| Blueprint for proposed exhaust pipes, including a sketch. | 25th Feb 1928 | West Wittering \ R \ January1928-March1928 84 | |
| Drawing LeC. 2518 for an exhaust manifold, advising a hold on the project pending feedback. | 27th Feb 1928 | West Wittering \ R \ January1928-March1928 85 | |
| Letter discussing the feasibility and cost-effectiveness of Fynn-Weichsel design induction motors for factory use. | 27th Feb 1928 | West Wittering \ R \ January1928-March1928 86 | |
| The general arrangement and component specifications for the 'India 3' car. | 27th Feb 1928 | West Wittering \ R \ January1928-March1928 87 | |
| Valve gear and rocker shaft deflection compared to the 20HP model. | 27th Feb 1928 | West Wittering \ R \ January1928-March1928 88 | |
| Design of an 'SS' exhaust pipe, suggesting a more practical and less costly 4-bolted flange. | 28th Feb 1928 | West Wittering \ R \ January1928-March1928 89 | |
| Proposals for a New Departure bearing and oil retaining devices for a 1' offset hypoid rear axle. | 28th Feb 1928 | West Wittering \ R \ January1928-March1928 90 | |
| Proposed engine improvements including exhaust, crankshaft, new head, and induction system. | 28th Feb 1928 | West Wittering \ R \ January1928-March1928 91 | |
| Adjustments and proposed settings for hydraulic dampers on Phantom & 20HP models. | 28th Feb 1928 | West Wittering \ R \ January1928-March1928 92 | |
| The steadiness and optimal length of the Phantom Sports steering column. | 1st Mar 1928 | West Wittering \ R \ January1928-March1928 93 | |
| List of required improvements for the 20HP India 3 model's next 10,000-mile test. | 5th Mar 1928 | West Wittering \ R \ January1928-March1928 94 | |
| Sketch with annotations for a damping scheme to address engine torque vibrations. | 2nd Mar 1928 | West Wittering \ R \ January1928-March1928 95 | |
| Design and requirements for dipping and turning headlights on 20HP & 40/50 models. | 3rd Mar 1928 | West Wittering \ R \ January1928-March1928 96 | |
| Proposed modifications for the 20HP India 3 engine and chassis. | 7th Mar 1928 | West Wittering \ R \ January1928-March1928 97 | |
| On modifying a 20HP car with central oiling and new joints for a 'Super Sports' model. | 7th Mar 1928 | West Wittering \ R \ January1928-March1928 98 | |
| Modifications and requirements for the cast dash on the 12-EX model. | 1st Mar 1928 | West Wittering \ R \ January1928-March1928 99 | |
| Query regarding the feasibility of creating a damper with both dry friction and lubrication, similar to a friction clutch. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 100 | |
| Pinion, bearings, and oil retention design for a 1' offset hypoid gear, including a clarifying sketch. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 101 | |
| Green lamp scheme and charge indicator for 20HP & 40/50 models, including ignition and charge control switch design. | 5th Mar 1928 | West Wittering \ R \ January1928-March1928 102 | |
| Crankshaft rigidity, with reference to the Stutz shaft and design implications for harmonics. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 103 | |
| Outlining design preferences and specifications for the 'SS' propeller shaft. | 5th Mar 1928 | West Wittering \ R \ January1928-March1928 104 | |
| Ideal size and position for the Phantom steering wheel across different models. | 5th Mar 1928 | West Wittering \ R \ January1928-March1928 105 | |
| 'SS' Propeller Shaft and associated schematics. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 106 | |
| Frame modifications and component requirements for the 20HP 'Next 10,000 Miler' model. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 107 | |
| Modifications to the gearbox and cross member for a future car model. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 108 | |
| Sending drawing LeC. 2520 regarding the Phantom Slipper Flywheel. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 109 | |
| EAC.10 & India 3 valve sizes, sending document Lec. 2523. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 110 | |
| On a Slipper Flywheel design change to a disc drive arrangement, at the request of the Experimental Department. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 111 | |
| Brief memo regarding Camshaft Bearings, sent with an accompanying document. | 28th Mar 1928 | West Wittering \ R \ January1928-March1928 112 | |
| Material options for camshaft bearings, suggesting piston aluminium alloy or cast iron as alternatives to bronze. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 113 | |
| And comparing valve sizes for various engine models, including EAC.10 and India 3. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 114 | |
| Investigation into difficulties with the Phantom's in-frame battery, comparing temporary and proper moulded batteries, and assessing accessibility. | 6th Mar 1928 | West Wittering \ R \ January1928-March1928 115 | |
| Querying the potential causes of bakelite tracking on high-tension ignition parts. | 7th Mar 1928 | West Wittering \ R \ January1928-March1928 116 | |
| Considerations for engine suspension design, specifically regarding rubber mountings and chassis twist. | 7th Mar 1928 | West Wittering \ R \ January1928-March1928 117 | |
| Valve gear rocker geometry and an experimental setup on a Phantom engine. | 7th Mar 1928 | West Wittering \ R \ January1928-March1928 118 | |
| Modified water pump gland for EAC.10, referencing blueprint LeC. 2521. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 119 | |
| Drawing for an alternative exhaust pipe joint. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 120 | |
| Sending drawing LeC. 2521 regarding water pump glands. | 8th Mar 1926 | West Wittering \ R \ January1928-March1928 121 | |
| Design change for an 'SS' exhaust pipe to a 4-bolt flange. | 8th Mar 1928 | West Wittering \ R \ January1928-March1928 122 | |
| Material and design of camshaft bearings. | 9th Mar 1928 | West Wittering \ R \ January1928-March1928 123 | |
| Confirming agreement on valve bore seat sizes for the 20HP and Phantom models. | 9th Mar 1928 | West Wittering \ R \ January1928-March1928 124 | |
| Engine suspension, focusing on the flexibility of rubber, alignment, and torsional dampers. | 13th Mar 1928 | West Wittering \ R \ January1928-March1928 125 | |
| | | | |