Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1244 of 2367        Sort by   Box   Date   Description

Filter      From        To        Search Hints      Identifier   [all]
DescriptionDateIdentifier
Letter regarding the urgent completion of a car, suggesting overtime and night-time spraying.19th Nov 1938Box 98 \ 2  scan0215
Letter to Park Ward Co. Ltd. confirming the dispatch of a Ferranti wireless set and controls.19th Nov 1938Box 98 \ 2  scan0216
Requesting the dispatch of a Ferranti wireless set and controls to Messrs. Park Wards for a 3.B.5. body.19th Nov 1938Box 98 \ 2  scan0217
Request to reinstate the front body bracket on the Bentley 111 chassis.21th Nov 1938Box 98 \ 2  scan0218
Letter from coachbuilders Park Ward & Co. Ltd acknowledging the forwarding of a Ferranti Wireless set and controls.21th Nov 1938Box 98 \ 2  scan0219
Broken dashboard brackets due to spot welding, with an urgent request for a stronger replacement.24th Nov 1938Box 98 \ 2  scan0220
Request for assistance in sourcing French-style headlamps for two experimental Bentley V cars.24th Nov 1938Box 98 \ 2  scan0221
Confidential letter to coachbuilder Messrs. Park Ward & Co. Ltd. confirming the colour scheme for car 10.B.V.24th Nov 1938Box 98 \ 2  scan0222
Confidential letter to Park Ward & Co. Ltd. detailing body fitting issues and future chassis modifications.25th Nov 1938Box 98 \ 2  scan0223
Page 2 of a letter confirming an agreement on the car's height when fully loaded.25th Nov 1938Box 98 \ 2  scan0224
Body fitting issues for Chassis 9.B.5 discovered during a visit to Park Ward's coachworks.25th Nov 1938Box 98 \ 2  scan0225
List of chassis faults and corrections concerning the front apron, steering column, exhaust system, and dashboard mounting.25th Nov 1938Box 98 \ 2  scan0226
Confidential letter regarding the specification for painting pressed steel wheels and the decision not to use a spare wheel cover.25th Nov 1938Box 98 \ 2  scan0227
Letter to Messrs. Park Ward & Co. Ltd. regarding the paint specification for wheels, wheel discs, and a wheel cover.25th Nov 1938Box 98 \ 2  scan0228
Request to obtain 2 sq. yds. of 1/8 inch Suprax black rubber for experimental use.25th Nov 1938Box 98 \ 2  scan0229
Visit to coachbuilder Park Ward, detailing issues found when mounting a 9.B.5. body to a chassis.26th Nov 1938Box 98 \ 2  scan0230
Coachbuilder progress on a body shell and a ventilation system.26th Nov 1938Box 98 \ 2  scan0231
Confidential letter to Messrs. Park Ward & Co. Ltd. discussing the cost of painting wheels and discs.28th Nov 1938Box 98 \ 2  scan0232
The design, materials, and painting process for the B.50 pressed steel wheels.29th Nov 1938Box 98 \ 2  scan0233
Letter to Park Ward & Co. Ltd. confirming modifications to a floorboard for chassis 9.B.5.29th Nov 1938Box 98 \ 2  scan0234
Request for permission to use a Leyland lorry to collect a Bentley chassis from Messrs. Park Wards, Willesden.2nd Dec 1938Box 98 \ 2  scan0235
Letter to Park Ward & Co. Ltd. confirming the paint finish for chassis 10.B.5.2nd Dec 1938Box 98 \ 2  scan0236
Secret memo arranging the collection of vehicle 9.B.V. after dark on a Monday evening.2nd Dec 1938Box 98 \ 2  scan0237
Letter from the Experimental Department regarding bolts for head lamp brackets.5th Dec 1938Box 98 \ 2  scan0238
Letter from coachbuilders Park Ward & Co Ltd acknowledging receipt of headlamp bracket bolts.6th Dec 1938Box 98 \ 2  scan0239
Record concerning step irons and body brackets for B.III, B.50, and Wraith 80 models.6th Dec 1938Box 98 \ 2  scan0240
Letter to Park Ward & Co. Ltd. discussing modifications to a Bentley's interior seating and screen winder.6th Dec 1938Box 98 \ 2  scan0241
Agreements and specifications for various car components and fittings.9th Dec 1938Box 98 \ 2  scan0242
Covering order for a nearside front wing supplied by Park Ward & Co. for an experimental car.9th Dec 1938Box 98 \ 2  scan0243
Confidential letter to Messrs. Park Ward & Co. Ltd. providing the dimensions for a large rubber tool block for a boot lid.13th Dec 1938Box 98 \ 2  scan0244
Letter requesting the dispatch of a clock for chassis 9.B.M.5 to Derby for fitting.13th Dec 1938Box 98 \ 2  scan0245
Confidential letter to Messrs. Park Ward & Co. Ltd. regarding the deflection of body crossmembers and requesting they be produced with a stiffer section.13th Dec 1938Box 98 \ 2  scan0246
Letter to Park Ward & Co. Ltd. regarding sealing a blind box on chassis 10.B.5 to prevent exhaust fumes from entering the luggage boot.22th Dec 1938Box 98 \ 2  scan0247
Non-requirement of step irons for specific Bentley 5 chassis.22th Dec 1938Box 98 \ 2  scan0248
Payment to Messrs. Park Ward's for silent bloc body mountings.23th Dec 1938Box 98 \ 2  scan0249
Letter from the Experimental Department requesting a tin of blue paint for body No.297 and chassis 9.B.5.5th Jan 1939Box 98 \ 2  scan0250
Letter from coachbuilders Park Ward & Co. Ltd to the Experimental Department regarding the dispatch of paint for Chassis No. 9-B-5.6th Jan 1939Box 98 \ 2  scan0251
Letter to Park Ward & Co. Ltd confirming the body for chassis 10.B.5 was being framed.7th Jan 1939Box 98 \ 2  scan0252
Confidential letter to Park Ward & Co. Ltd. regarding the interior fittings for chassis 10.B.5.12th Jan 1939Box 98 \ 2  scan0253
Recommended specification for a batch of standardised close coupled saloon bodies for Bentley V.12th Jan 1939Box 98 \ 2  scan0254
Specifications document detailing various vehicle body components, page 2.12th Jan 1939Box 98 \ 2  scan0255
Specification sheet for car body features including seating, ventilation, heating, and insulation.12th Jan 1939Box 98 \ 2  scan0256
Specifications regarding gas-tightness, mudguards, and weight for a vehicle body.12th Jan 1939Box 98 \ 2  scan0257
Specification list for body and chassis accessories and fitments.19th Jan 1939Box 98 \ 2  scan0258
Instruction on the durometer hardness of 'Floattex' silent bloc mountings for the B.5 chassis.19th Jan 1939Box 98 \ 2  scan0259
Minutes of a meeting regarding B.5 Standard Bodies, specifically discussing the design of front and rear wing lamps.31th Jan 1939Box 98 \ 2  scan0260
Design choices for doors, floors, roof, back light, and ventilation.31th Jan 1939Box 98 \ 2  scan0261
Meeting minutes discussing design elements like the instrument board, wind noise, heating, sound insulation, and radio.31th Jan 1939Box 98 \ 2  scan0262
Meeting notes discussing design details for petrol fillers, waist moulding, and bumpers.3rd Feb 1939Box 98 \ 2  scan0263
Letter sent to Messrs. Park Ward & Co. Ltd. regarding chassis prints for coachwork.3rd Feb 1939Box 98 \ 2  scan0264
Strategy of selling the Bentley 111 Special only as a complete car, particularly in dealings with Jack Barclay.7th Feb 1939Box 98 \ 2  scan0265
Confidential letter regarding paint and head material choices for a Drop Head Coupe.8th Feb 1939Box 98 \ 2  scan0266
Confidential letter to coachbuilder Park Ward regarding chassis prints for a 10.B.5 Coupe.8th Feb 1939Box 98 \ 2  scan0267
Confirming an agreement to only sell the 'Special Bentley' as a complete motor car and not in chassis form.10th Feb 1939Box 98 \ 2  scan0268
The construction of special aero-dynamic bodies for the Bentley V.7th Feb 1939Box 98 \ 2  scan0269
Confidential letter to Park Ward & Co. Ltd. regarding materials for a 10.B.5 Coupe.14th Feb 1939Box 98 \ 2  scan0270
Letter to Park Ward & Co. Ltd. sending a blueprint for the instrument board for chassis 10.B.5.16th Jan 1939Box 98 \ 2  scan0271
Letter to Messrs. Park Ward & Co. Ltd. confirming the use of hood material pattern 217 for a 10.B.5. Drop Head Coupe.16th Feb 1939Box 98 \ 2  scan0272
Memo to Park Ward regarding bonnets for B.V, B50, and Silver Wraith models.25th Feb 1939Box 98 \ 2  scan0273
Letter to coachbuilder Park Ward & Co. regarding the production of parts for the Bentley 5.25th Feb 1939Box 98 \ 2  scan0274
Letter to Messrs. Park Ward & Co. Ltd. regarding a quotation for tools and parts.25th Feb 1939Box 98 \ 2  scan0275
Letter to Park Ward Ltd. arranging the delivery of a 10.B.5 mock-up chassis and a follow-up visit by a fitter.27th Feb 1939Box 98 \ 2  scan0276
Request for permission to deliver a Bentley chassis to Messrs. Park Ward.27th Feb 1939Box 98 \ 2  scan0277
Letter to Park Ward & Co. Ltd. listing the blueprints required for fitting a bonnet to Chassis 10.B.5.28th Feb 1939Box 98 \ 2  scan0278
Modifications to the Bentley III brake gear and suspension specifications.10th Jun 1937Box 98 \ 3  scan0001
Technical memorandum detailing the specifications of the Girling rear brakes for the Bentley III car.28th Jun 1937Box 98 \ 3  scan0002
The arrangement of front wheels and brakes for the Bentley III, comparing them to the Wraith III.5th Jul 1937Box 98 \ 3  scan0003
The front brake operation for the Bentley III, referencing an attached scheme for Girling Brakes.15th Jul 1937Box 98 \ 3  scan0004
Description of the scale layout for the front brake operation linkage.19th Aug 1937Box 98 \ 3  scan0005
The front brake balancer for the Bentley 111 model, discussing manufacturing methods and component interchangeability.20th Aug 1937Box 98 \ 3  scan0006
Scheme of modifications to the brake linkage for a Bentley 111 to suit a lower frame.8th Nov 1937Box 98 \ 3  scan0007
Requesting the return of Bentley III Girling brake plungers to New Hudson Ltd. due to a manufacturing error.17th Nov 1937Box 98 \ 3  scan0008
Replacement of wrongly machined plungers for Bentley III Girling brake expanders.2nd Dec 1937Box 98 \ 3  scan0009
Modifications and design issues concerning the Bentley III brakes and Girling components.8th Dec 1937Box 98 \ 3  scan0010
The issue of a stone guard for the rear brake equaliser on a Bentley 111.24th Dec 1937Box 98 \ 3  scan0011
Modifications to the front brakes expander unit for the Bentley 111 chassis.11th Jan 1938Box 98 \ 3  scan0012
Parts list update for Bentley 111 Brakes, Front & Rear Hubs, detailing replacements and additions.19th Jan 1938Box 98 \ 3  scan0013
Required quantities for brake drums, bolts, and nuts.19th Jan 1938Box 98 \ 3  scan0014
Brake performance issues and modifications for a Bentley III, addressing spongy feel, violent diving, and rear brake geometry errors.4th Mar 1938Box 98 \ 3  scan0015
Responding to suggestions regarding brakes on the Bentley III chassis.24th Mar 1938Box 98 \ 3  scan0016
Technical memorandum detailing the specifications for wider front brakes on the Bentley III.25th Mar 1938Box 98 \ 3  scan0017
Technical memorandum discussing faults and potential improvements for the Bentley III braking system.26th Mar 1938Box 98 \ 3  scan0018
Design for wider front brakes for the Bentley 111, using standard Girling shoes of the rolled steel type.30th Mar 1938Box 98 \ 3  scan0019
Specifications and modifications for wider front brakes on the Bentley 111 chassis.25th May 1938Box 98 \ 3  scan0020
Suggestion for a modified rear brake equaliser mounting for the Bentley 111 brake linkage.2nd Apr 1938Box 98 \ 3  scan0021
Introduction of Girling brakes, including tool costs, savings, and experimental production.20th Apr 1938Box 98 \ 3  scan0022
Cost analysis memorandum regarding the adoption of Girling Brakes on the Bentley II A ('M' series chassis).23th Apr 1938Box 98 \ 3  scan0023
Experimental use and standardisation of Girling Brakes, suggesting further testing on Bentley Trials cars.25th Apr 1938Box 98 \ 3  scan0024
Secret memo regarding the decision not to fit Girling Brakes to the 'M' Series vehicles.27th Apr 1938Box 98 \ 3  scan0025
Required revisions and improvements for the Bentley III brake system.11th May 1938Box 98 \ 3  scan0026
Request to produce and fit a new Aluminium Bronze actuating lever for the front brake equalising mechanism on the first Bentley III chassis.12th May 1938Box 98 \ 3  scan0027
The particulars of the dashpot for the Bentley III brakes.13th May 1938Box 98 \ 3  scan0028
Requesting the design of an oil dashpot for Bentley III & Bentley 50 brakes to prevent thumps.14th May 1938Box 98 \ 3  scan0029
Cost-effectiveness of producing welded brake shoes in-house versus buying rolled steel shoes.31th May 1938Box 98 \ 3  scan0030
Revised programme for brake shoes, focusing on standardizing to a T section steel shoe.2nd Jun 1938Box 98 \ 3  scan0031
Reduced price of rolled steel brake shoes from New Hudson Ltd.2nd Jun 1938Box 98 \ 3  scan0032
Specification changes for the S.B.V. Bentley III model regarding shock adsorbers, front equalizers, and servo motor springs.23th Jun 1938Box 98 \ 3  scan0033
Requesting the fitment of stiffened brake pieces to Bentley III and 50 models to prevent an accident.12th Jul 1938Box 98 \ 3  scan0034
Request to make two altered support rods for a Bentley III & 50 Equalizer and fit one to chassis 8.B.V.18th Jul 1938Box 98 \ 3  scan0035
Instruction regarding the supply of TSM/B Brake linings for a specific chassis.5th Aug 1938Box 98 \ 3  scan0036


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙