Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 170 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Tests verifying the results of different front engine mounting configurations.15th Oct 1934Box 14 \ 5  Scan307
Tests on torque reaction dampers, engine feet, and rubbers to improve engine smoothness and stability.15th Oct 1934Box 14 \ 5  Scan308
Specifications for high-rating springs to be used in an experiment to turn the engine into a harmonic damper.26th Oct 1934Box 14 \ 5  Scan309
Specification for the compression of Phantom II front engine rubbers.28th Dec 1934Box 14 \ 5  Scan310
Standardisation of parts for the flexible mounting of the engine at the rear.12th Jan 1935Box 14 \ 5  Scan311
Cost estimate for extra tooling and production details for the T.2 series chassis.10th Jan 1935Box 14 \ 5  Scan312
Investigation into a complaint about torque reaction bolts coming adrift on Chassis No.103-TA, causing water loss.25th Jun 1935Box 14 \ 5  Scan313
Water leak from the radiator drain tap on chassis 103-TA, caused by a loose engine support damper bolt.18th Jun 1935Box 14 \ 5  Scan314
Standardisation of the front silencer.24th Sep 1926Box 14 \ 6  Scan001
The standardisation of chassis parts.1st Nov 1926Box 14 \ 6  Scan002
The distortion and damage to the exhaust pipes on a 12-EX car.1st Nov 1926Box 14 \ 6  Scan003
Modifications to the exhaust system and its position relative to the frame.18th Nov 1926Box 14 \ 6  Scan004
Modifications for fitting a shock damper front axle control to an EAC.7 chassis.6th Jan 1927Box 14 \ 6  Scan005
Modifications to the brackets for a silencer's heat shield to allow for expansion.5th May 1927Box 14 \ 6  Scan006
On the non-essentiality of the exhaust heat shield for open touring cars and the ongoing testing of a baffle.15th Jul 1927Box 14 \ 6  Scan007
Proceeding with Scheme 963 for the crankchamber of a Phantom sequence starter.22th Sep 1927Box 14 \ 6  Scan008
Design of exhaust manifolds and pipes for the Super Sports 20 HP model.21th Jan 1928Box 14 \ 6  Scan009
Next 10,000 miles test for the Standard Phantom and design considerations for the sports carburettor.6th Feb 1926Box 14 \ 6  Scan010
Design and potential issues of proposed exhaust pipes for the EAC.10 model.25th Feb 1928Box 14 \ 6  Scan011
Drawing Lec.2518 for an exhaust manifold, advising to await feedback before proceeding.27th Feb 1928Box 14 \ 6  Scan012
Design of an 'SS' exhaust pipe, suggesting a more practical and less costly 4-bolt flange.28th Feb 1928Box 14 \ 6  Scan013
Drawing for an alternative exhaust pipe joint.8th Mar 1928Box 14 \ 6  Scan014
Modification of an 'SS' exhaust pipe main connection to a 4-bolt flange.8th Mar 1928Box 14 \ 6  Scan015
Outlining two modification schemes for an exhaust pipe flange to improve alignment tolerance.20th Mar 1928Box 14 \ 6  Scan016
Drawing for an EAC.10 Exhaust Pipe Flange.22th Mar 1928Box 14 \ 6  Scan017
Technical note discussing the design of a bolted exhaust pipe joint with spherical seats.25th Mar 1928Box 14 \ 6  Scan018
Hand-drawn sketch of a front exhaust downtake pipe showing a failed joint and a proposed modification.1st Jul 1932Box 14 \ 6  Scan019
Design sketch featuring a radiator grille and a crankshaft, accompanied by dimensions and handwritten notations.1st Jul 1932Box 14 \ 6  Scan020
Modifications to a blueprint for an exhaust pipe flange.5th Apr 1928Box 14 \ 6  Scan021
Investigation into the stretching and collapsing of exhaust valves on the Phantom model.10th May 1928Box 14 \ 6  Scan022
The difficulty of accessing a bolt on the F.2.B. engine exhaust system, requiring a special tool.20th Jun 1928Box 14 \ 6  Scan023
Alteration to the F-2-B series chassis, inverting the bolts on the exhaust manifold.22th Jun 1928Box 14 \ 6  Scan024
Modifications to the 'SS' exhaust cutout and its operating gear.12th Sep 1928Box 14 \ 6  Scan025
Alterations to the cylinder head for exhaust heated versus water heated induction pipes.12th Sep 1928Box 14 \ 6  Scan026
Drawings and design changes for the 'SS' exhaust system.14th Sep 1928Box 14 \ 6  Scan027
Sending a drawing for a heat shield over the silencer for an 'SS' exhaust system.20th Sep 1928Box 14 \ 6  Scan028
Modifications to the 'SS' Gearbox Undershield and associated components.1st Oct 1928Box 14 \ 6  Scan029
Power loss and noise issues with the Super Sports exhaust system.27th Oct 1928Box 14 \ 6  Scan030
Graph plotting Brake Horse Power and Percentage Power Loss against RPM for a Super Sports Engine, comparing open exhaust ports with an exhaust manifold.26th Oct 1928Box 14 \ 6  Scan031
Largely blank page with a purple ink reception stamp in the bottom right corner.27th Oct 1928Box 14 \ 6  Scan032
Inquiry regarding the progress of tests for a rustless exhaust snout.29th Oct 1928Box 14 \ 6  Scan033
Production of a new exhaust cam and its associated valve lift curve.1st Nov 1928Box 14 \ 6  Scan034
Investigation into exhaust valve stretching, concluding it is caused by insufficient tappet clearance.1st Nov 1928Box 14 \ 6  Scan035
Booming issue with the 'SS' exhaust silencer and a proposed experimental test.26th Nov 1928Box 14 \ 6  Scan036
The failure of an aluminium exhaust joint washer, recommending replacement with steel.1st Dec 1928Box 14 \ 6  Scan037
Instruction to change the material of the spherical washer for the exhaust pipe from aluminium to stainless steel.8th Dec 1928Box 14 \ 6  Scan038
Responding to reports on a 10,000 miles test, detailing issues with radiator leakage and a silencer.27th Dec 1928Box 14 \ 6  Scan039
Multiple issues with the 20 HP car and recommending more work before production.2nd Jan 1929Box 14 \ 6  Scan040
Recommendation to continue production of the 20 HP car with modifications while completing the SS model.1st Jan 1929Box 14 \ 6  Scan041
Test failures at Chateauroux, including gearbox anchorage, chassis instability, and a burnt-out exhaust manifold.1st Jan 1929Box 14 \ 6  Scan042
Performance issues with the 'SS' vacuum pump and recommending modifications.1st Jan 1929Box 14 \ 6  Scan043
Experiments and potential modifications to an 'SS' engine exhaust system.16th Jan 1929Box 14 \ 6  Scan044
Telegram message referring to document L E C 2591 concerning an exhaust-heated induction pipe.16th Jan 1925Box 14 \ 6  Scan045
New three-section exhaust design with an expansion chamber for 'SS' and 20 HP cars.17th Jan 1929Box 14 \ 6  Scan046
Proposed cast exhaust manifold design with modifications to clear sparking plugs.19th Jan 1929Box 14 \ 6  Scan047
Progress memo regarding the production of the 'SS' Car, detailing work on engine mounting and exhaust systems.21th Jan 1929Box 14 \ 6  Scan048
Further tests and modifications to the 'SS' car's engine and body mountings to reduce exhaust periods and front end dither.21th Jan 1929Box 14 \ 6  Scan049
Experiments to prevent body yawing by altering frame rigidity and front mounting.22th Jan 1929Box 14 \ 6  Scan050
Short memo confirming receipt of all necessary information for the 'SS' Exhaust System.22th Jan 1929Box 14 \ 6  Scan051
The performance of two exhaust snouts made from Staybrite steel after prolonged use.22th Jan 1929Box 14 \ 6  Scan052
Instructions regarding alternative schematics for the 'SS' exhaust system, specifically for the parallel sliding joint.25th Jan 1929Box 14 \ 6  Scan053
Design and material specifications for an 'SS' exhaust manifold.28th Jan 1929Box 14 \ 6  Scan054
Design specifications for a new 2.25 inch 'SS' exhaust manifold, including material suggestions and production considerations.29th Jan 1929Box 14 \ 6  Scan055
Design and simplification of exhaust pipes, including a copy of a telegram.30th Jan 1929Box 14 \ 6  Scan056
Technical memorandum discussing the design of an automotive exhaust system.30th Jan 1929Box 14 \ 6  Scan057
Design of an exhaust system, including materials and construction methods, accompanied by sketches.30th Jan 1929Box 14 \ 6  Scan058
Improved design scheme and giving the recipient autonomy over the final decision.1st Feb 1929Box 14 \ 6  Scan059
Abandoning exhaust heating in favour of water heating for the S.S. and G.4. induction system.1st Feb 1929Box 14 \ 6  Scan060
Agreeing to the standardisation of Staybrite steel for exhaust systems on the S.S. Chassis.8th Feb 1929Box 14 \ 6  Scan061
Various designs and experiments for an SS exhaust system.9th Feb 1929Box 14 \ 6  Scan062
Specifications for a Staybrite steel fishtail exhaust outlet for SS and 20 HP chassis.12th Feb 1929Box 14 \ 6  Scan063
Mr. Elliott's visit to Le Canadel, a 10,000-mile car test, and finalising engine and exhaust work.15th Feb 1929Box 14 \ 6  Scan064
Design and construction of experimental exhaust pipes and silencers.19th Feb 1929Box 14 \ 6  Scan065
Carburation, water circulation, and potential engine design improvements.2nd Feb 1929Box 14 \ 6  Scan066
The 'SS' Exhaust System, sending a sketch showing a stop for a sliding joint.26th Feb 1929Box 14 \ 6  Scan067
Proposed sling for the SS. Exhaust System's horizontal pipe.26th Feb 1929Box 14 \ 6  Scan068
Proposal to change the material of the exhaust snout to Staybright steel to overcome rusting.12th Feb 1929Box 14 \ 6  Scan069
The fitting of a new part to the 40/50 HP and 20 HP chassis models.14th Apr 1929Box 14 \ 6  Scan070
Experiments and recommendations to increase the efficiency of the 'SS' vacuum pump by enlarging pipe diameters.20th Mar 1929Box 14 \ 6  Scan071
Proposal and modification for an SS exhaust cutout control.22th Mar 1929Box 14 \ 6  Scan072
Experimental fitting of a Phantom rear silencer to an SS car's exhaust system.1st Mar 1929Box 14 \ 6  Scan073
Completion and return of documents for the 'SS' Exhaust System.27th Mar 1929Box 14 \ 6  Scan074
Modifications to the 'SS' exhaust system, including the cutout, silencer suspension, and tubular members.28th Mar 1929Box 14 \ 6  Scan075
Design change for the 'SS' exhaust system gusset plate and L.H. controls.13th Apr 1929Box 14 \ 6  Scan076
Confirming modifications to the 'SS' cutout control, including the silencer position, intermediate lever, and heat shield.17th Apr 1929Box 14 \ 6  Scan077
Instructions from Mr. Royce on an experiment for the 'SS' exhaust silencer, detailing the arrangement of baffles and holes.1st May 1929Box 14 \ 6  Scan078
Reverting to a fabric coupling and the exhaust system for 'SS' cars due to faults.6th May 1929Box 14 \ 6  Scan079
Notice confirming the exhaust system for the J.2 series is satisfactory and will not be changed back to the Phantom system.27th May 1929Box 14 \ 6  Scan080
Implementation of thermostatically controlled radiator shutters as an alternative to hand control.27th May 1929Box 14 \ 6  Scan081
Brinell hardness of aluminium bronze bars intended for S.S. exhaust valve seatings.18th Jun 1929Box 14 \ 6  Scan082
Configuration of two S.S. chassis for testing engine noise and roughness.20th Jun 1929Box 14 \ 6  Scan083
Car's exhaust, steering, and a recommendation to keep car 21-EX as a reference standard.21th Jun 1929Box 14 \ 6  Scan084
Issues with a red water boiling indicator lamp and silencer popping on the 21-EX car.21th Jun 1929Box 14 \ 6  Scan085
Solutions for S.S. Exhaust noise and cracking issues, suggesting design modifications.1st Jul 1929Box 14 \ 6  Scan086
Recommendation to try water cooling a section of pipe to reduce heat, noise, expansion, and oxidation.2nd Jul 1929Box 14 \ 6  Scan087
The cause of exhaust cracking noise and proposed solutions involving studs, nuts, and the downtake pipe.2nd Jul 1929Box 14 \ 6  Scan088
Issues with the S.S. Exhaust System's Cut Out Valve and a proposed strengthened design.6th Jul 1929Box 14 \ 6  Scan089
Blueprint diagram for a modified exhaust cut-out, designated S.S.11th Jul 1929Box 14 \ 6  Scan090
Telegram proposing modifications to an exhaust system and silencer.11th Jul 1929Box 14 \ 6  Scan091
Request for a complete analysis of a badly pitted S.S. engine exhaust valve to determine its material and the cause of the pitting.11th Jul 1929Box 14 \ 6  Scan092


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙