Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1883 of 2367        Sort by   Box   Date   Description

Filter      From        To        Search Hints      Identifier   [all]
DescriptionDateIdentifier
Confirming the receipt of 10 nitro alloy steel test pieces from Messrs. Aubert & Duval.28th Jan 1929Box 154a \ 1  scan0135
Letter to Messrs. Aubert & Duval Ltd. confirming receipt of steel samples and asking about the necessity of grinding after nitro hardening.28th Jan 1929Box 154a \ 1  scan0136
Investigation into the brittle surface layer on nitro alloy steel and its potential for rear axle gears.2nd Feb 1929Box 154a \ 1  scan0137
Letter from steel supplier Aubert & Duval concerning the grinding of nitro-hardened steels and allowances for cylinder liners.2nd Feb 1929Box 154a \ 1  scan0138
Letter from Aubert & Duval regarding the grinding process for shafts and gears after nitro hardening.2nd Feb 1929Box 154a \ 1  scan0139
Letter in French discussing the need for grinding nitrided steel components.2nd Feb 1929Box 154a \ 1  scan0140
Letter from Aubert & Duval Frères to Mr. W.A. Robotham concerning the surface hardening and machining of engine components.6th Mar 1929Box 154a \ 1  scan0141
Confirming an urgent order for sets of levers, pins, and eyes in nitro alloy steel for the 20 HP rear shock absorber.6th Mar 1929Box 154a \ 1  scan0142
Suggesting the experimental use of nitro alloy steel for shock absorber links due to ongoing issues.6th Mar 1929Box 154a \ 1  scan0143
Micro-examination report on three separate samples of nitrided alloy steel.15th Mar 1929Box 154a \ 1  scan0144
Continued microscopic examination and comparison of nitrided test bars and a liner, focusing on surface layers and brittleness.15th Mar 1929Box 154a \ 1  scan0145
Comparison of nitrided versus carburised materials for differential crown wheels, focusing on case depth and core hardness.15th Mar 1929Box 154a \ 1  scan0146
Micro-examination and chemical analysis comparing Firth-Derihon and Aubert et Duval steel test bars.21th Mar 1929Box 154a \ 1  scan0147
Requesting the ordering of crank forgings and rear axle gears made from Nitralloy steel.21th Mar 1929Box 154a \ 1  scan0148
Recommended procedure for the re-tinning of Nitroalloy components.3rd Mar 1929Box 154a \ 1  scan0149
Preparing rear shock absorbers for the 20 HP model with improved components.1st Mar 1929Box 154a \ 1  scan0150
Hardening process for Nitro Alloy crankshafts and recommending they be hardened all over.27th Mar 1929Box 154a \ 1  scan0151
Meeting with Summers of Shotton about a new normalised steel sheet with superior ductility.8th Apr 1929Box 154a \ 1  scan0152
Table showing the analysis of valve materials used in cars and aero engines in England.12th Nov 1928Box 154a \ 1  scan0153
New source of high-ductility sheet steel for pressings from Messrs. Summers of Shotton.12th Nov 1928Box 154a \ 1  scan0154
The long-term testing of exhaust snouts made from Staybrite steel on two cars.22th Jan 1929Box 154a \ 1  scan0155
Recommending the standardisation of Staybrite steel for the S.S. chassis exhaust system.8th Feb 1929Box 154a \ 1  scan0156
Methods for protecting Nitralloy steel, specifically the tinning process versus copper plating.1st May 1929Box 154a \ 1  scan0157
Proposed scheme for tinning using a chemical cleaner and a molten fluxing solution.1st May 1929Box 154a \ 1  scan0158
Material combinations for pinions and gear wheels, specifically using nitralloy steel and nickel chrome case hardened steel.25th Apr 1929Box 154a \ 1  scan0159
Delays in producing experimental parts from Nitro Alloy and suggesting outsourcing to France.8th May 1929Box 154a \ 1  scan0160
Heat treatment and machining process for Nitro Alloy test pieces, including dimensional drawings.8th May 1929Box 154a \ 1  scan0161
Dimensional expansion of two Nitro Alloy bushes after final heat treatment.19th Jun 1929Box 154a \ 1  scan0162
Distortion issues found when hardening Nitro Alloy pieces, comparing results with supplier instructions.1st Jun 1929Box 154a \ 1  scan0163
Heat treatment and machining process for Nitro Alloy components and test pieces.8th May 1929Box 154a \ 1  scan0164
The dimensional changes of two Nitro Alloy bushes after final heat treatment, including a diagram.19th Jun 1929Box 154a \ 1  scan0165
Micro-examination report on the hardness and case depth of nitrided steel bushes.21th Jun 1929Box 154a \ 1  scan0166
Instructions to change chassis production to 'Staybrite' finish for the 20 HP model and specifying materials for various components.21th Jun 1929Box 154a \ 1  scan0167
Slow production of 20 HP and 40/50 HP Nitralloy crankshafts from supplier Messrs. Firth.27th Jun 1929Box 154a \ 1  scan0168
Letter from a supplier regarding a delay and material issues with an order for four Nitralloy Crankshafts.26th Jun 1929Box 154a \ 1  scan0169
Letter from Thos. Firth & Sons Ltd. regarding the commencement of manufacturing replacement crankshafts.26th Jun 1929Box 154a \ 1  scan0170
Letter from Thos. Firth & Sons Limited regarding the status of a Nitralloy Crankshaft order.25th Jul 1929Box 154a \ 1  scan0171
The despatch and subsequent processing of experimental Nitralloy crankshafts.26th Aug 1929Box 154a \ 1  scan0172
Samples of stainless steel tubing from supplier Accles & Pollock.27th Aug 1929Box 154a \ 1  scan0173
Proposing a trial of the nitriding process on valves made from HR Crown steel for a skin hardening effect.29th Oct 1929Box 154a \ 1  scan0174
Appearance and quality of chromium plating on car parts.30th Oct 1929Box 154a \ 1  scan0175
Performance of special steel valves in a De Havilland Gypsy moth aeroplane engine and potential patent issues.6th Nov 1929Box 154a \ 1  scan0176
Processes and materials for chromium plating on car parts.21th Nov 1929Box 154a \ 1  scan0177
Nitrogen hardening treatment process for Firth's H.R. Crown valves.29th Nov 1929Box 154a \ 1  scan0178
Design modifications for radiators to facilitate chromium plating.1st Dec 1929Box 154a \ 1  scan0179
Query regarding potential damage to a radiator from chromium acid fumes during the plating process.11th Dec 1929Box 154a \ 1  scan0180
Note discussing the cost-saving benefits of lapping hardened parts for various components.11th Dec 1929Box 154a \ 1  scan0181
The delay in processing Nitro-Alloy cylinder liners and other parts.20th Dec 1929Box 154a \ 1  scan0182
Clarifying that instructions for 'F' type nitro alloy cylinders were previously issued.23th Dec 1929Box 154a \ 1  scan0183
Proposed scheme for adapting a radiator for chromium plating.24th Dec 1929Box 154a \ 1  scan0184
Instruction to fit a special zinc and aluminium white metal alloy to crankcase bearings and connecting rods for a 10,000-mile test run.27th Dec 1929Box 154a \ 1  scan0185
Various bearing metal combinations for Nitralloy cranks in both chassis and aero engines.1st Jan 1930Box 154a \ 1  scan0186
Proposal to test Nitralloy for water and petrol pump components on 'F' and 'H' engines.3rd Jan 1930Box 154a \ 1  scan0187
Procurement and cost issues of Nitralloy Steel crankshaft stampings from suppliers Firth and Vickers.3rd Jan 1930Box 154a \ 1  scan0188
Requesting manufacturing instructions for Nitro Alloy gears and pinions for Phantom and 20 HP chassis.7th Jan 1930Box 154a \ 1  scan0189
Outlining the specific temperature and time for hardening H.R. Crown valves using the nitrogen process to avoid patent infringement.9th Jan 1930Box 154a \ 1  scan0190
Process and control of nitralloy hardening, including the use of test pieces to diagnose issues.21th Jan 1930Box 154a \ 1  scan0191
The condition of a Nitralloy steel crankshaft exhibiting small pits.24th Jan 1930Box 154a \ 1  scan0192
Request to produce Nitralloy pump spindles for water and petrol pumps.27th Jan 1930Box 154a \ 1  scan0193
Instructions for the production and nitrogen hardening process of Nitralloy pump spindles.30th Jan 1930Box 154a \ 1  scan0194
Micro-examination report on Nitralloy steel samples removed from a nitriding furnace.30th Jan 1930Box 154a \ 1  scan0195
Micro-examination report on the hardness testing of Nitralloy Steel rotor shafts.3rd Feb 1930Box 154a \ 1  scan0196
Laboratory finding on preventing the hardening of Nitralloy Steel via Nickel Plating.19th Feb 1930Box 154a \ 1  scan0197
Discussion with Mr. Oliver Lucas regarding the production of car lamps and mirrors using Staybrite steel.4th Apr 1930Box 154a \ 1  scan0198
The process of annealing stainless steel in order to bend it for fittings, with reference to the No.1 American Experimental car.30th Apr 1930Box 154a \ 1  scan0199
Problems encountered by Hispano cars using Nitralloy steel for cylinder liners.1st Mar 1930Box 154a \ 1  scan0200
Transition to an untarnishable finish for the 20/25 HP and 40/50 HP chassis.15th May 1930Box 154a \ 1  scan0201
Instructing the introduction of an untarnishable finish for specific chassis series.16th May 1930Box 154a \ 1  scan0202
Implementation and quality control procedures for chromium plating, comparing different methods.19th May 1930Box 154a \ 1  scan0203
Standardisation sheet for exhaust valves E.53158, replacing a previous version that failed during tests in France.16th Apr 1930Box 154a \ 1  scan0204
Booklet titled Nickel Alloy Steels, providing a summary of their properties and applications.16th Apr 1930Box 154a \ 1  scan0205
Record of total running time for an HP.3 Blade across different engine builds.20th Aug 1930Box 154a \ 1  scan0206
Notice about the new 'Staybright' radiator finish and instructions for its cleaning and maintenance.20th Aug 1930Box 154a \ 1  scan0207
Use and benefits of nitro-hardened steel for car and aero engine crankshafts.22th Aug 1930Box 154a \ 1  scan0208
Proposal to increase the number of Nitralloy steel crankshafts and obtain consent from the Air Ministry for their use.27th Aug 1930Box 154a \ 1  scan0209
The successful production of cylinder liners in Nitralloy steel.28th Aug 1930Box 154a \ 1  scan0210
Failures in chromium plating and suggesting a more reliable, cost-effective method using a nickel undercoat.4th Sep 1930Box 154a \ 1  scan0211
Suggestion to stock up on £20,000 worth of nitro-hardened parts like crankshafts and liners for 'F' and 'H' engines.16th Sep 1930Box 154a \ 1  scan0212
The satisfactory examination of nitrided Firth's H.R. Crown Valves from Nitralloy Ltd.17th Sep 1930Box 154a \ 1  scan0213
The testing of Nitro hardened steel crankshafts and a recommendation to order fifty for fitting.19th Sep 1930Box 154a \ 1  scan0214
Fitting experimental cars with unpolished Staybright shutters to demonstrate their durability to the Sales department.20th Sep 1930Box 154a \ 1  scan0215
Outlining comparative tests for soft deposit (Harcourts type) and bright chromium plating methods.24th Sep 1930Box 154a \ 1  scan0216
Questioning the introduction of Nitro Hardened Steel crankshafts due to insufficient testing and potential risks.29th Sep 1930Box 154a \ 1  scan0217
Testing and production of Nitro Hardened Steel for crankshafts.2nd Oct 1930Box 154a \ 1  scan0218
Corrosion issues with unpolished staybright radiator shutters and proposed new finishing experiments.3rd Oct 1930Box 154a \ 1  scan0219
Advising to reduce a chassis order from 50 to 25 units regarding Nitro Hardened Steel.13th Oct 1930Box 154a \ 1  scan0220
Reduction in the order quantity for Nitro Hardened Steel.15th Oct 1930Box 154a \ 1  scan0221
Order of 12 forgings for a standard type Phantom II crankshaft in nitralloy steel.16th Oct 1930Box 154a \ 1  scan0222
Surface treatment of Staybrite shutters, focusing on pickling and avoiding corrosion.6th Oct 1930Box 154a \ 1  scan0223
Note about the acid etching process used for descaling Staybrite shutters to achieve a matt finish.10th Oct 1930Box 154a \ 1  scan0224
The unsuitability of an acid etching method for Staybrite radiator shutters due to corrosion.25th Oct 1930Box 154a \ 1  scan0225
Potential use of an untarnishable metal called 'Silveroid' for body fittings.29th Oct 1930Box 154a \ 1  scan0226
The performance and durability of different chromium plating methods on car parts.18th Nov 1930Box 154a \ 1  scan0227
Request to arrange a bumper test for new Dunlop-produced Staybrite wheels against standard wheels.11th Nov 1930Box 154a \ 1  scan0228
Staybright wheel tests on a Bump chassis for 63 hours.8th Dec 1930Box 154a \ 1  scan0229
Testing of Staybrite wheels and requesting feedback on their performance on a bumper.12th Dec 1930Box 154a \ 1  scan0230
Letter discussing the testing and potential sale of a set of Staybrite road wheels for a Phantom II chassis.10th Dec 1930Box 154a \ 1  scan0231
Further report on the testing of a Staybright wheel on a bump chassis.17th Dec 1930Box 154a \ 1  scan0232
The successful completion of severe bumping tests on Staybright wheels.19th Dec 1930Box 154a \ 1  scan0233
Road test and subsequent sale of staybrite wheels.24th Dec 1930Box 154a \ 1  scan0234


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙