Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 591 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Goshawk exhaust noise issues, particularly 'booming' sounds in relation to different coachbuilt bodies.28th Nov 1922Box 48 \ 4  Scan182
Investigation into a severe 'booming' noise on a limousine trials car, attributing the cause to the exhaust note rather than axle noise.5th Dec 1922Box 48 \ 4  Scan183
Various engine bench tests attempting to reproduce and understand the failure of exhaust valves on a 20 HP chassis.27th Dec 1922Box 48 \ 4  Scan184
Pre-ignition issues, its effect on exhaust valves, and ongoing engine tests.27th Dec 1922Box 48 \ 4  Scan185
Report diagnosing engine pre-ignition issues in a 20 HP car.9th Dec 1922Box 48 \ 4  Scan186
Refuting claims about unacceptable noise levels in a limousine trials car by comparing it to other models.9th Dec 1922Box 48 \ 4  Scan187
Letter responding to feedback about improving an exhaust system.30th Dec 1922Box 48 \ 4  Scan188
Latest type of oiling arrangement for the 20 HP model and the trade-off between smoky exhaust and engine lubrication.30th Dec 1922Box 48 \ 4  Scan189
Test results for a 20 HP green limousine, concluding no chassis alteration is needed and defending the exhaust noise level.1st Jan 1923Box 48 \ 4  Scan190
And comparing Goshawk engine timing data with different cam configurations.16th Jul 1923Box 48 \ 4  Scan191
Rusted and cracked swan neck of a silencer on a 20HP car and a recommendation for rust protection.20th Aug 1923Box 48 \ 4  Scan192
Standardisation of lagging the exhaust pipe with asbestos to reduce heat.16th Aug 1923Box 48 \ 4  Scan193
The expansion of Goshawk 11 exhaust valves to determine the required tappet clearance.12th Jul 1923Box 48 \ 4  Scan194
Valve and cylinder block expansion.12th Jul 1923Box 48 \ 4  Scan195
Recommendation to continue using a valve design modified to 45° angle seats, with a note on sending samples.1st Sep 1923Box 48 \ 4  Scan196
To Mr. Hives requesting a report.22th Feb 1923Box 48 \ 4  Scan197
Request for a report on the 20 HP chassis exhaust pipe with a new asbestos and aluminium sheath.24th Oct 1923Box 48 \ 4  Scan198
Proposal to test soft aluminium washers as a replacement for failing copper and asbestos washers on the 20HP model.26th Oct 1923Box 48 \ 4  Scan199
Request for a report on the 20 HP Chassis Exhaust Pipe with a new asbestos and aluminium sheath.7th Nov 1923Box 48 \ 4  Scan200
Distorted exhaust pipe flange on a 20 HP chassis, proposing a larger washer for better seating.15th Nov 1923Box 48 \ 4  Scan201
Standardisation of a reduced diameter swan neck exhaust pipe to reduce noise.21th Dec 1923Box 48 \ 4  Scan202
Confirming the results from comparative road and bench tests on pipes for 20 HP cars.22th Jan 1924Box 48 \ 4  Scan203
Chasing a test report for a 20 HP chassis exhaust pipe with a new asbestos and aluminium sheath.18th Feb 1924Box 48 \ 4  Scan204
Standardisation report for an exhaust pipe stay designed to prevent vibration.15th Apr 1924Box 48 \ 4  Scan205
Standardisation document for a stay to prevent exhaust pipe vibration.15th Apr 1924Box 48 \ 4  Scan206
Testing aluminium washers for induction and exhaust pipes on a 20 HP chassis.30th May 1924Box 48 \ 4  Scan207
Report comparing horsepower figures for the Goshawk exhaust system under different configurations.30th May 1924Box 48 \ 4  Scan208
Horsepower (HP) comparison tables at various RPMs for two different exhaust configurations.1st Jun 1924Box 48 \ 4  Scan209
Extract regarding the overheating of the 20-HP Swan Neck Exhaust Pipe and a recommendation for lagging it.1st Jun 1924Box 48 \ 4  Scan210
Special silencer pipe fixing to cure exhaust pipe vibrations on a 20-HP chassis.25th Jun 1924Box 48 \ 4  Scan211
20 HP engine exhaust tests, comparing standard and modified systems.1st Jul 1924Box 48 \ 4  Scan212
Horsepower test results for standard and experimental 20 HP exhaust configurations.1st Jul 1924Box 48 \ 4  Scan213
Road and hill climb test results for vehicle 4-G-11 on Shardlow straight and Pistern.1st Jul 1924Box 48 \ 4  Scan214
20 HP exhaust and induction tests to improve engine performance and fuel economy.1st Jul 1924Box 48 \ 4  Scan215
Proposed exhaust and induction system tests for a 20 HP engine.4th Jul 1924Box 48 \ 4  Scan216
Extract from a visit to sales regarding a resonant exhaust note on the 20 HP model.14th Jul 1924Box 48 \ 4  Scan217
Recommended fix using a special sliding exhaust joint for vibration on 20-HP cars.21th Jul 1924Box 48 \ 4  Scan218
And comparing two schemes (563 and 564) for the 20 HP chassis exhaust system.9th Sep 1924Box 48 \ 4  Scan219
Necessity of lagging the 20 HP swan neck exhaust pipe.16th Sep 1924Box 48 \ 4  Scan220
Steering stiffness and exhaust boom issues during GMK-65 trials.22th Sep 1924Box 48 \ 4  Scan221
Investigation of a persistent 'booming' noise in a 20 HP car and requesting an experimental exhaust system for testing.26th Sep 1924Box 48 \ 4  Scan222
Reducing exhaust noise and vibrations for the 20 HP model.1st Sep 1924Box 48 \ 4  Scan223
Modified exhaust fittings for the 20 HP model, detailing schemes 563 and 564 to address vibration issues.26th Sep 1924Box 48 \ 4  Scan224
Reducing exhaust boom, recommending Scheme 564 for future production over Scheme 563.26th Sep 1924Box 48 \ 4  Scan225
Despatch of Exhaust Fittings (scheme 563) to Cricklewood.27th Sep 1924Box 48 \ 4  Scan226
Confirming the despatch of an experimental 20 HP exhaust system and fitting blueprint to Cricklewood.27th Sep 1924Box 48 \ 4  Scan227
Dispatch of a 20 HP exhaust system and fittings for experimental fitting.27th Sep 1924Box 48 \ 4  Scan228
Confirming receipt of Silencer and Exhaust fittings for a test on The Dowager Lady Cain's 20 HP car, G.F.37.29th Sep 1924Box 48 \ 4  Scan229
New and irritating exhaust noises on the 40/50 HP model.1st Oct 1924Box 48 \ 4  Scan230
New 'tinny' exhaust noise on the 40/50 HP model due to a system modification.30th Sep 1924Box 48 \ 4  Scan231
Requesting a meeting to discuss and approve standardisation alterations for the 'U' Series, specifically concerning new exhaust noises.20th Oct 1924Box 48 \ 4  Scan232
Revised design for a 20 HP exhaust downtage support and sliding spherical joint, incorporating suggestions from Mr. Royce.1st Dec 1924Box 48 \ 4  Scan233
Suitability of an exhaust pipe on a 20 HP Goshawk-11.13th Jan 1925Box 48 \ 4  Scan234
Drawing No. LeC. 2040, which shows a proposed method for anchoring the 20 HP silencer to reduce vibration.4th Mar 1925Box 48 \ 4  Scan235
Potential cancellation of instructions for fitting asbestos cord lagging on the 20 HP chassis exhaust.28th May 1925Box 48 \ 4  Scan236
Recording Mr. Royce's instruction to proceed with the production of an old type of axle.1st Feb 1912Box 49 \ 1  Scan001
Note about testing axle noise and the abandonment of the experiment.1st Feb 1912Box 49 \ 1  Scan002
The investigation into a noisy axle following instructions from Mr. Royce.1st Feb 1912Box 49 \ 1  Scan003
Note from Mr Royce detailing an experiment for testing a rear axle.4th Feb 1912Box 49 \ 1  Scan004
Instructions from Mr. Royce detailing strength testing procedures for axles.12th Mar 1912Box 49 \ 1  Scan005
Instructions from Mr. Royce regarding axle strength tests.12th Mar 1912Box 49 \ 1  Scan006
Note from Mr Royce detailing a practical experiment for testing axle strength.12th Mar 1912Box 49 \ 1  Scan007
Proposal for axle strength tests to enable the lightening of the component, including a sketch of the proposed test rig.12th Mar 1912Box 49 \ 1  Scan008
Page detailing proposed stress testing methods for vehicle axles and suspension components.12th Mar 1912Box 49 \ 1  Scan009
Page discussing stress testing methodology and the balance between component strength and unnecessary weight, referencing Lanchester's back axle.18th Mar 1912Box 49 \ 1  Scan010
Mr. Royce's suggestion to reduce axle weight by removing the aluminium liners and intermediate bearing.18th Mar 1912Box 49 \ 1  Scan011
Axles without aluminium liners and a proposal to increase shaft diameter.20th Mar 1912Box 49 \ 1  Scan012
Axle strength test results for a 1700 type axle with 25% thinner flanges.10th May 1912Box 49 \ 1  Scan013
Axle strength test results for a 1600 type standard axle with a tie rod fitted.13th Oct 1911Box 49 \ 1  Scan014
Axle strength test results for a 1700 type axle box with flanges and axle box 25% thinner than standard.8th Sep 1911Box 49 \ 1  Scan015
Axle strength test results for a standard 700 type load applied in the centre of the box.13th Oct 1911Box 49 \ 1  Scan016
Data sheet logging the results of strength tests on an old type 1600 axle with a standard tie rod fitted.22th Dec 1911Box 49 \ 1  Scan017
Axle strength test results for a 1400 type axle with modified flanges under load.23th Dec 1911Box 49 \ 1  Scan018
The results of an axle strain test on a 1700 type axle.21th May 1912Box 49 \ 1  Scan019
Axle strength test results table for a standard 1700, type X339 axle, detailing deflections under load.21th May 1912Box 49 \ 1  Scan020
To Mr Barrington regarding axle strain test results for 1600 and 1700 type axles.21th May 1912Box 49 \ 1  Scan021
Further report on axle strength tests for the standard 1700 model.22th May 1912Box 49 \ 1  Scan022
Letter from F.H. Royce regarding the specification of equipment for axle strain tests.11th Jul 1912Box 49 \ 1  Scan023
Design and quietness of an experimental bevel axle with a short pinion shaft.24th Jul 1912Box 49 \ 1  Scan024
Production options for a new axle versus an older model.24th Oct 1919Box 49 \ 1  Scan025
Departmental memo regarding a delay in axle strain tests due to waiting for a dummy frame.3rd Sep 1912Box 49 \ 1  Scan026
To Mr Barrington relaying instructions from Mr Royce regarding chassis tubes and bolts.20th Sep 1912Box 49 \ 1  Scan027
Letter discussing stress testing and strength requirements for back axles following a failure.27th Oct 1912Box 49 \ 1  Scan028
Directive on the frequency and conditions for conducting tests following alterations or at regular intervals.4th Dec 1912Box 49 \ 1  Scan029
Special parts fitted to chassis 2100E, concerning the new lighter rear axle and a new adjusting jig.4th Dec 1912Box 49 \ 1  Scan030
Weight comparison between a standard axle and a new design axle, noting a saving of 32 lbs.2nd Jun 1916Box 49 \ 1  Scan031
Request to order two sets of strengthened rear axle tube parts for testing.2nd Jun 1916Box 49 \ 1  Scan032
The transfer of a rear axle tube.8th Jun 1916Box 49 \ 1  Scan033
List of design specifications and considerations for a post-war chassis, continued from a previous page.1st Oct 1916Box 49 \ 1  Scan034
Vehicle springing, axle strength testing, and issues with aluminium brake straps.3rd Oct 1916Box 49 \ 1  Scan035
The readiness of strengthened rear axle tubes for testing on a revolving test machine.10th Jan 1917Box 49 \ 1  Scan036
Experimental alteration and testing of axle tubes due to breakages.11th Jan 1917Box 49 \ 1  Scan037
Instruction regarding a new adapter from the Experimental Department for strengthened rear axle tubes.12th Jan 1917Box 49 \ 1  Scan038
Testing procedure for altered axle tubes to justify the design change.13th Jan 1917Box 49 \ 1  Scan039
Outlining the testing procedure for composite (repair) axle tubes.18th Jan 1917Box 49 \ 1  Scan040
Listing parts required for an axle tube experiment, along with their material specifications.15th Mar 1916Box 49 \ 1  Scan041
Correcting the part number for a composite repair axle tube to be tested.25th Jan 1917Box 49 \ 1  Scan042
Testing order for composite (repair) axle tubes for Series 1700 vehicles.18th Jan 1917Box 49 \ 1  Scan043
Testing the bending resistance for altered axle tubes following a change to brake drums.13th Jan 1917Box 49 \ 1  Scan044
Parts required for an Axle Tube Experiment, referencing drawing G.5597.25th Jan 1917Box 49 \ 1  Scan045


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙