| Description | Date | Identifier | |
| Coachwork modifications and delivery schedule for the first EAC. 8 chassis destined for France. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan46 | |
| Proposing to fit a rubber upward stop to the accelerator pedal, referencing scheme 2142. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan47 | |
| Sending scheme 2140 for a modified rear axle tube suitable for a 58' track, including a new stress diagram. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan48 | |
| Confirming the dispatch of all required information to construct the first E.A.C. 8 chassis. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan49 | |
| Need to stiffen the 20HP steering column and proposing design solutions. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan50 | |
| Suggestions to remedy oscillation in a hydraulic shock absorber by modifying the valve and piston guide. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan51 | |
| Valve design to prevent a piston effect and issues with trapped air in the oil circulation. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan52 | |
| Proposing a scheme for constructing a brake pedal and asking for feedback on manufacturing. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan53 | |
| Telegram requesting a copy of a later telegram concerning a twenty horse power steering system. | 10th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan54 | |
| Issues and proposed solutions for Phantom & Goshawk oil relief valves. | 13th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan55 | |
| Urgently needed hydraulic shock dampers, proposing three novel combinations for patenting. | 13th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan56 | |
| List of features for double-acting shock dampers with unequal action, with reference to an attached sketch. | 1st Feb 1937 | West Wittering \ O \ January1926-March1926 Scan57 | |
| Diagrams and notes concerning a hydraulic damper system with relief valves and a detailed vent mechanism. | 1st Feb 1937 | West Wittering \ O \ January1926-March1926 Scan58 | |
| With sketches proposing design modifications for a petrol filler and gauge assembly. | 15th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan59 | |
| Design review memo with a sketch, discussing component simplicity, a petrol gauge, and a tank filter. | 18th Feb 1938 | West Wittering \ O \ January1926-March1926 Scan60 | |
| EAC controls, including magneto controls, column controls, and ball joint designs. | 15th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan61 | |
| Alternative schemes for a frame gusset on the second cross member. | 17th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan62 | |
| Design schemes for a rear spring front anchorage, pending feedback from Mr. Royce. | 17th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan63 | |
| Testing and stiffness of a new 20HP steering column. | 18th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan64 | |
| Telegram advising that a 'Torpedo' model will not be ready on Friday and a new date will follow. | 16th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan65 | |
| Practical semi-automatic brake adjustment system using a fine ratchet mechanism. | 1st Feb 1926 | West Wittering \ O \ January1926-March1926 Scan66 | |
| Benefits of hydraulic shock dampers, tyre pressures, and a proposed design change to the relief valve. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan67 | |
| Sending scheme 2147 showing the 20HP cast dash for the 'B' type steering. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan68 | |
| Engineering schemes and experiments for heating the throttles on the Phantom model. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan69 | |
| Superheated water scheme for engine jackets and the merits of an exhaust-heated throttle. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan70 | |
| Scheme 2146 for a cast dashboard for the 20HP 'D' type steering model. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan71 | |
| Design improvements for step irons, wing stays, spare wheel and luggage carriers. | 19th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan72 | |
| Inquiring about the proposed standardization of Phantom oil relief valves and reporting progress on a new guideless valve design. | 2nd Feb 1926 | West Wittering \ O \ January1926-March1926 Scan73 | |
| Modifications to hydraulic shock dampers regarding valve chattering, oil filters, and material choice. | 22th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan74 | |
| Test for a lighter Phantom engine using shorter rods to reduce weight and crankcase height. | 23th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan75 | |
| Proposing a chassis test for a Phantom cylinder head with opposed sparking plugs to investigate engine popping. | 23th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan76 | |
| Tests and modifications for Phantom induction pipes to overcome fuel separation issues. | 24th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan77 | |
| Improvements to the Phantom's suspension system, comparing it to the Silver Ghost. | 25th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan78 | |
| Comparison of the New Phantom's road noise and performance against the Silver Ghost model. | 29th Feb 1928 | West Wittering \ O \ January1926-March1926 Scan79 | |
| On replacing 20.HP. rear axle thrust bearings and improving parts production. | 25th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan80 | |
| Failure of a hydraulic shock damper link, proposing design improvements, and considering its application on various axles. | 25th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan81 | |
| Alternative design for the front end of the rear spring and comparing it with the 20HP scheme. | 26th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan82 | |
| Effectiveness of hydraulic shock dampers for reducing high-speed steering wobble and planning further tests. | 26th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan83 | |
| Oil leak issue in shock dampers and proposing a temporary fix with a sketch. | 2nd Feb 1926 | West Wittering \ O \ January1926-March1926 Scan84 | |
| Accessibility issues with a new shock damper valve and requesting a design modification. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan85 | |
| Intended mounting of the 'India Cast Dash' to avoid developing strains. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan86 | |
| Advocating for the adoption of hydraulic shock dampers, semi-balloon tyres, and a lighter front axle for Phantom & Goshawk models. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan87 | |
| Dashboard rigidity and a proposed modification to its fixings. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan88 | |
| Comparative testing and production delays of back axle controls for the Phantom model. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan89 | |
| Improvements and standardisation for a combined rear petrol tank, carrier, and guard. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan90 | |
| Blueprint with revised proposals for a lighter Phantom engine with an aluminium cylinder head and block. | 27th Feb 1926 | West Wittering \ O \ January1926-March1926 Scan91 | |
| Hydraulic shock dampers, discussing a broken link, potential improvements, and a comparison with a Lanchester patent. | 3rd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan92 | |
| Instructions for modifications to the gearbox and engine starter. | 1st Mar 1926 | West Wittering \ O \ January1926-March1926 Scan93 | |
| Progress on a lighter clutch, flywheel, propeller shaft, joints, and gearbox modifications. | 9th Mar 1938 | West Wittering \ O \ January1926-March1926 Scan94 | |
| Oil leakage issues and proposed modifications for hydraulic shock dampers. | 3rd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan95 | |
| Proposed modifications to the 20HP induction and exhaust pipes with a strengthened flange. | 2nd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan96 | |
| Design improvements for hydraulic shock dampers, including valve and filter modifications. | 1st Mar 1926 | West Wittering \ O \ January1926-March1926 Scan97 | |
| Protecting a central piston from grit using gauze filters. | 1st Nov 1936 | West Wittering \ O \ January1926-March1926 Scan98 | |
| Revisions to a petrol tank's side filler and vent pipe based on new instructions. | 2nd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan99 | |
| Working on shock dampers locally, sending proposals for a 40/50 back axle, and awaiting details for an EAC 7 car test run. | 2nd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan100 | |
| Design of oil relief valves and the challenges related to the flexibility of bow springs. | 3rd Mar 1926 | West Wittering \ O \ January1926-March1926 Scan101 | |
| One-piece bow springs, materials, valve accessibility, and instructions for pump casing works. | 1st Mar 1928 | West Wittering \ O \ January1926-March1926 Scan102 | |
| Sending drawings for a 20HP oil pump relief valve and an alternative scheme. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan103 | |
| Suggested improvements to hydraulic shock dampers, including referencing N. scheme 2153. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan104 | |
| Patent and modifications for friction in suspension links for the 4-wheel brake balancing gear on the New Phantom. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan105 | |
| Four recent modifications and improvements made to the New Phantom steering system. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan106 | |
| Potential design improvements for a worm and nut mechanism, including oil retention and comparison with a Hispano design. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan107 | |
| The status and collection of experimental torpedo and cabriolet bodies from Barkers. | 4th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan108 | |
| Potential solutions for oil loss in hydraulic shock dampers, including a diagram. | 5th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan109 | |
| Design proposal for a double valve, including a cross-section diagram and discussion of its features. | 8th May 1936 | West Wittering \ O \ January1926-March1926 Scan110 | |
| List detailing specifications for experimental cars designated E.A.C. 1 through 6. | 5th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan111 | |
| List of specifications for various car models and their revisions, noted as page 2. | 6th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan112 | |
| Seeking clarification about test readings for Marles Steering, specifically regarding the mean of lubricated and unlubricated states. | 6th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan113 | |
| Modifying the Phantom cylinder head for improved combustion, turbulence, and spark plug placement. | 6th Mar 1925 | West Wittering \ O \ January1926-March1926 Scan114 | |
| Technical comparison of various engine head designs to optimize gas turbulence. | 6th Mar 1925 | West Wittering \ O \ January1926-March1926 Scan115 | |
| Page (3) of a document discussing methods for producing turbulence in relation to piston and plug positioning. | 8th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan116 | |
| Recommendation to use soft aluminium washers in place of fibre ones. | 8th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan117 | |
| Modifications to the New Phantom spare wheel carrier to accommodate coachbuilder requirements. | 9th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan118 | |
| Experiments and suggestions for the Phantom automatic ignition advance mechanism. | 11th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan119 | |
| Design improvements for a Phantom Aluminium Head induction pipe bolting. | 10th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan120 | |
| Drawing LeC. 2212 for a Phantom Aluminium Head, discussing modifications to flanges and sparking plug holes. | 10th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan121 | |
| Experimental modifications to hydraulic shock dampers based on N. scheme 2159. | 1st Mar 1926 | West Wittering \ O \ January1926-March1926 Scan122 | |
| Design schemes for double rear brakes, awaiting further remarks before proceeding with detailing. | 11th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan123 | |
| On fitting the existing New Phantom rear brakes to the first EAC. 7 model. | 11th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan124 | |
| The design, operation, and advantages of a double acting autovac tank originating from Germany. | 12th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan125 | |
| Improved petrol supply system and autovac device, proposing a model be sent for trial on a chassis. | 12th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan126 | |
| List of design comments and proposed modifications for a hydraulic shock damper. | 12th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan127 | |
| Design notes and sketches for a plug and piston valve assembly. | 13th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan128 | |
| Design, materials, and lubrication for a .720 worm and nut assembly. | 13th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan129 | |
| Improvements to the Phantom model's rear springs, shock dampers, and tyres. | 15th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan130 | |
| Car suspension and ride comfort, discussing tyres, cushions, shock dampers, and road springs. | 13th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan131 | |
| Issues with sticking Phantom oil pressure relief valves and proposed solutions. | 13th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan132 | |
| Design of rear springs for the new EAC 7 frame, suggesting modifications. | 13th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan133 | |
| Sticking valve on a Phantom Cutout, proposing material changes and a screw stop mechanism. | 15th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan134 | |
| Telegram with handwritten instructions for improving a Phantom's suspension and comfort. | 16th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan135 | |
| Post Office Telegram with a handwritten message concerning front springs and a light engine head for turbulence. | 16th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan136 | |
| Telegram regarding an issue with changing shock dampers due to bolt centre measurements. | 6th Apr 1914 | West Wittering \ O \ January1926-March1926 Scan137 | |
| Improvements for car instruments, instrument boards, and petrol gauges. | 16th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan139 | |
| Characteristics and performance of special Woodhead front road springs. | 16th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan140 | |
| Ride comfort and springing of the Phantom model, comparing it to other models and suggesting improvements. | 18th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan141 | |
| Improving vehicle suspension, discussing tyres, shock dampers, and spring design. | 23th Mar 1928 | West Wittering \ O \ January1926-March1926 Scan142 | |
| Blueprints for the Phantom oil pressure relief valve. | 18th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan143 | |
| Unsatisfactory rear seat ride quality in the Phantom model and proposed testing solutions. | 19th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan144 | |
| With a sketch suggesting design improvements for a hydraulic shock damper filter. | 19th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan145 | |
| Investigation into the suspension differences between the Silver Ghost, 20HP, and New Phantom chassis. | 19th Mar 1926 | West Wittering \ O \ January1926-March1926 Scan146 | |
| | | | |