Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2148 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Letter to Commander Robertson regarding the weight of raw materials for a gun and an agreed material substitution.22th Aug 1940Box 176 \ 3  img125
List of raw materials and their weights required to manufacture a 40mm gun.20th Aug 1940Box 176 \ 3  img126
Required yield and brinell hardness for gun barrels.20th Aug 1940Box 176 \ 3  img127
Letter to Messrs Tubes Ltd confirming that materials will be subject to an A.I.D. inspection.23th Aug 1940Box 176 \ 3  img128
Notes of a discussion regarding the 40mm gun.4th Sep 1940Box 176 \ 3  img129
Production details for guns, including materials, pricing, tooling, testing, and assembly.4th Sep 1940Box 176 \ 3  img130
Meeting notes on gun production, discussing bronze cradles, contracts with the Admiralty, and mountings.4th Sep 1940Box 176 \ 3  img131
Suitability of '00' Steel for 40 m/m Gear Barrels.12th Sep 1940Box 176 \ 3  img132
Cover letter to Mr. Ashworth of The Admiralty regarding English Steel Corporation's preference for using Vibrac for 40mm gun barrels.14th Sep 1940Box 176 \ 3  img133
Letter from English Steel Corporation regarding steel specifications for the 40 mm Gun Mk III barrel.8th Sep 1940Box 176 \ 3  img134
Drawings and material specifications for the first Admiralty gun intended for service trials.20th Sep 1940Box 176 \ 3  img135
Availability and suitability of rifle boring machines.24th Jun 1940Box 176 \ 3  img136
Rifle boring capabilities at Armstrong Whitworth for the Bofors gun.27th Jun 1940Box 176 \ 3  img137
Capability and availability of rifle boring machines for 13.2mm barrels.27th Jun 1940Box 176 \ 3  img138
Thank you note for information about rifle boring plant at Armstrong-Whitworths.30th Jun 1940Box 176 \ 3  img139
Reference sheet for correspondence with Armstrong Whitworth Co. Ltd. regarding rifling and boring equipment.30th Jun 1940Box 176 \ 3  img140
Need to acquire gun boring equipment for 20mm and 40mm guns.9th Jul 1940Box 176 \ 3  img141
Machining of parts and production capacity for 40 mm guns.16th Jul 1940Box 176 \ 3  img142
Letter from the Admiralty regarding the purchase of American machines for 40mm gun production.29th Jul 1940Box 176 \ 3  img143
Telephone conversation with Admiral Perry regarding the purchase of machine tools from the U.S.A.30th Jul 1940Box 176 \ 3  img144
Letter to the Admiralty Offices concerning the approval and procurement of American machine tools for 40mm gun barrel production.3rd Aug 1940Box 176 \ 3  img145
Letter to Captain Slater regarding the urgent need for machine tools for gun production during the war.5th Aug 1940Box 176 \ 3  img146
Preliminary list of general machine tools which could be used immediately.21th Nov 1938Box 176 \ 3  img147
Visit to The British Tool & Engineering Co. to assess production capacity for the 40 M/M Gun Mark III.9th Aug 1940Box 176 \ 3  img148
Inventory list of various machines, including Capstans, Lathes, and Millers, detailing their quantity, specifications, and condition.9th Aug 1940Box 176 \ 3  img149
List of miscellaneous, tool room, and hardening shop machinery and equipment.9th Aug 1940Box 176 \ 3  img150
Summary of factory work priorities, special tool production, and conclusions on manufacturing capabilities.9th Aug 1940Box 176 \ 3  img151
Alternative supplier, Builder's Iron Foundry, for barrel making equipment.17th Aug 1940Box 176 \ 3  img152
Letter to Machine Shop Equipment Ltd. regarding quotations for rifling and drilling machines and arranging a viewing.17th Aug 1940Box 176 \ 3  img153
Letter from Machine Shop Equipment Ltd concerning the availability and revised pricing of 'Builders' Rifling and Drilling Machines.21th Aug 1940Box 176 \ 3  img154
Quotation and technical discussion for various deep hole drilling and rifling machines.21th Aug 1940Box 176 \ 3  img155
Quotation for deep hole drilling machines and a rifling machine.21th Aug 1940Box 176 \ 3  img156
Statement of delivery and payment terms from Machine Shop Equipment Ltd.21th Aug 1940Box 176 \ 3  img157
Quotation for deep hole drilling, reaming, and rifling machines from Machine Shop Equipment Ltd.21th Aug 1940Box 176 \ 3  img158
Specification and terms sheet for Rifling Machinery, including dimensions, weight, and delivery details.23th Aug 1940Box 176 \ 3  img159
Letter to Machine Shop Equipment, Ltd. cancelling a request for quotations on rifling and drilling machines.23th Aug 1940Box 176 \ 3  img160
Procurement and modification of .500' Barrel Drilling Machines.21th Sep 1940Box 176 \ 3  img161
Letter from Machine Shop Equipment Ltd expressing disappointment that the machinery they offered had already been sourced elsewhere.9th Oct 1940Box 176 \ 3  img162
Letter from Machine Shop Equipment Ltd. enclosing leaflets for small Deep hole Reaming and Rifling machines.9th Oct 1940Box 176 \ 3  img163
Bulletin for a Builders Deep Hole Reaming Machine from the Builders Iron Foundry.9th Oct 1940Box 176 \ 3  img164
Descriptive sheet for a Builders Deep Hole Reaming Machine.9th Oct 1940Box 176 \ 3  img165
Description of the operation of a reaming machine with a photograph of the equipment.9th Oct 1940Box 176 \ 3  img166
Specification sheet for Long Bed and Short Bed Deep Hole Reaming Machines from Builders Iron Foundry.9th Oct 1940Box 176 \ 3  img167
Bulletin for a Builders Small Arms Rifling Machine.9th Oct 1940Box 176 \ 3  img168
The features and operation of a Builders Small Arms Rifling Machine.9th Oct 1940Box 176 \ 3  img169
Description of a motor-driven machine with an automatic cutting mechanism and lubrication system.9th Oct 1940Box 176 \ 3  img170
Specification sheet for a rifling machine from Builders Iron Foundry.12th Nov 1940Box 176 \ 3  img171
Letter to the Admiralty Offices regarding the shipment of three Pratt & Whitney machines from the USA.12th Nov 1940Box 176 \ 3  img172
Letter from the Admiralty regarding the re-allocation of Pratt & Whitney machines.18th Nov 1940Box 176 \ 3  img173
Letter to the Admiralty Offices regarding Pratt & Whitney Drilling & Rifling Machines.23th Nov 1940Box 176 \ 3  img174
Cable message requesting the delivery address for rifling machines.28th Nov 1940Box 176 \ 3  img175
Telegram confirming the diversion of Pratt Whitney machines to BSA Redditch.30th Nov 1940Box 176 \ 3  img176
Letter to John Howlett regarding the potential manufacture of gun parts and production targets.27th Jul 1940Box 176 \ 3  img177
Letter to Wellworthy Piston Rings regarding drawings for a 40 m/m MARK III Type B.D. Gun.12th Aug 1940Box 176 \ 3  img178
Letter concerning a list of mechanical assemblies and missing prints for associated parts.12th Jun 1940Box 176 \ 3  img179
Letter from a supplier acknowledging drawings for a 40 m/m gun and awaiting approval to proceed.14th Aug 1940Box 176 \ 3  img180
Letter to Wellworthy Piston Rings Ltd listing part number alterations for a 40mm Mark III Gun.16th Aug 1940Box 176 \ 3  img181
Letter to Wellworthy Piston Rings Ltd. regarding procedures for drawing alterations and code numbers.16th Aug 1940Box 176 \ 3  img182
Letter from Wellworthy Piston Rings Limited regarding drawings for a Mark III Gun.21th Aug 1940Box 176 \ 3  img183
Letter from Wellworthy Piston Rings regarding missing drawings and returning obsolete prints for the Mark III Gun.26th Aug 1940Box 176 \ 3  img184
Visit to the Ordnance Factory in Nottingham regarding capacity for barrel manufacturing.18th Jun 1940Box 176 \ 3  img185
Letter of introduction for Mr. Richard Taylor to Mr. Hollyoake at the Royal Ordnance Factory regarding potential manufacturing work.10th Jul 1940Box 176 \ 3  img186
Letter to R. Taylor, Esq., forwarding a copy of a letter sent to the Royal Ordnance Factory in Nottingham.10th Jul 1940Box 176 \ 3  img187
Letter from the Royal Ordnance Factory regarding the utilisation of machining capacity.12th Jul 1940Box 176 \ 3  img188
Letter of acknowledgement to Mr. Hollyoake at the Royal Ordnance Factory, Nottingham.14th Jul 1940Box 176 \ 3  img189
Cover letter to R. Taylor of Taylor Bros. Ltd. regarding a visit to the Royal Ordnance Factory, Nottingham.14th Jul 1940Box 176 \ 3  img190
Letter regarding the delivery schedule of experimental barrels and an inquiry about additional barrel-making capacity.25th Jul 1940Box 176 \ 3  img191
Letter from the Royal Ordnance Factory regarding a contract for barrel forgings and their issue schedule.8th Aug 1940Box 176 \ 3  img192
Letter to Mr. Healey concerning production rates, equipment arrival from the States, and operational timelines.10th Aug 1940Box 176 \ 3  img193
Noting the receipt of a letter from the Royal Ordnance Factory in Nottingham, with a copy attached.10th Aug 1940Box 176 \ 3  img194
Copy of a letter from R.O.F. Nottingham confirming a contract for barrel forgings and outlining a delivery schedule.8th Aug 1940Box 176 \ 3  img195
Attaching test certificates for eight 40mm barrel forgings dispatched to the Royal Ordnance Factory.20th Aug 1940Box 176 \ 3  img196
Notes on the production status of the Q.F. 2-Pounder Mk. 14 Gun.4th Aug 1940Box 176 \ 3  img197
Barrel manufacturing, sourcing from various factories, and production schedules for general machined parts.4th Aug 1940Box 176 \ 3  img198
Planning, tooling, materials, and heat-treatment considerations for gun manufacturing.4th Aug 1940Box 176 \ 3  img199
Sourcing and production of 'K parts', bought parts, and mountings for guns.4th Aug 1940Box 176 \ 3  img200
The production capacity of T. Grieve & Co., Ltd for the 40 m/m Gun Mark III.24th Jun 1940Box 176 \ 3  img201
Order for 50 barrels from the English Steel Corporation and safety margin agreements.24th Jun 1940Box 176 \ 3  img202
Letter from English Steel Corporation Ltd. concerning a 'Vibrac' steel order delay and the need for specific purpose details for priority.1st Jul 1940Box 176 \ 3  img203
Instructing the English Steel Corporation to commence production on 30 gun barrels.23th Sep 1940Box 176 \ 3  img204
Order for 60 gun barrel forgings from The English Steel Corporation.11th Jul 1940Box 176 \ 3  img205
Changes to barrel testing conditions and quantity requirements.25th Jul 1940Box 176 \ 3  img206
Visit to English Steel Corporation in Sheffield to check on delivery delays for 40 m/m gun barrel forgings.25th Jul 1940Box 176 \ 3  img207
Letter to the English Steel Corporation confirming delivery details for 40 m/m barrel forgings.25th Jul 1940Box 176 \ 3  img208
Letter from English Steel Corporation regarding the delivery schedule for 40mm barrel forgings.26th Jul 1940Box 176 \ 3  img209
Letter to the English Steel Corporation regarding a proposed order for 500 barrels and the required intervention of the Steel Controller.27th Jul 1940Box 176 \ 3  img210
Letter received from the English Steel Corporation regarding the first sixty barrel forgings.28th Jul 1940Box 176 \ 3  img211
Letter from the English Steel Corporation regarding the delivery schedule for 40mm barrel forgings.26th Jul 1940Box 176 \ 3  img212
Request to make a tracing of two drawings, 16836 S. and Q.1712, for record purposes.28th Jul 1940Box 176 \ 3  img213
The return and duplication of drawings from English Steel Corporation.30th Jul 1940Box 176 \ 3  img214
Blueprint for a 40mm barrel with testing instructions and material specifications.19th Jul 1940Box 176 \ 3  img215
Blueprint drawing for a machined V30 steel component for a Mark III assembly.19th Jul 1940Box 176 \ 3  img216
Blueprint cover sheet for a 40mm Barrel Mark III.1st Aug 1940Box 176 \ 3  img217
Letter from English Steel Corporation Ltd. regarding their inability to supply 500 barrels before 1942.1st Aug 1940Box 176 \ 3  img218
Letter to Commander Oswald of The Admiralty regarding the difficulty of obtaining barrel steel forgings.8th Aug 1940Box 176 \ 3  img219
Forwarding test certificates for seven 40 m/m barrel forgings supplied by English Steel Corporation for Admiralty approval.14th Mar 1940Box 176 \ 3  img220
Letter to English Steel Corporation regarding the preferred material for 40 mm gun barrels.5th Sep 1940Box 176 \ 3  img221
Letter from English Steel Corporation regarding steel specifications for the 40mm Gun Mark III Type B.D.8th Sep 1940Box 176 \ 3  img222
Inquiry to Messrs. Armstrong-Whitworth regarding their capacity for gun boring and rifling.30th Jun 1940Box 176 \ 3  img223
Letter from Sir W. G. Armstrong Whitworth & Co. declining a request for gun boring and rifling work due to machinery delays.5th Jul 1940Box 176 \ 3  img224


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙