| Description | Date | Identifier | |
| The examination and status of 500 B.HP crank forgings, including a chemical analysis of the material. | 22th Mar 1918 | Box 38 \ 6 Scan009 | |
| Acceptance and rejection numbers of shafts from various casts, with a focus on defective steel. | 24th Mar 1916 | Box 38 \ 6 Scan010 | |
| Hair cracks in crankshafts and the A.I.D.'s exceptions to them. | 17th Jun 1918 | Box 38 \ 6 Scan011 | |
| Acceptance criteria for hair cracks on American engine cranks. | 20th Jun 1918 | Box 38 \ 6 Scan012 | |
| Acceptance of hair cracks in crankshafts for American engines, relaying Mr. Royce's opinion on the matter. | 20th Jun 1918 | Box 38 \ 6 Scan013 | |
| Suggestion to hold a conference with A.I.D. Chiefs to consider a reply to Mr. Nadin's cable. | 2nd Jul 1918 | Box 38 \ 6 Scan014 | |
| Letter regarding the shipment of twelve crankshafts with minute defects from the U.S.A. to Derby, England. | 2nd Jul 1918 | Box 38 \ 6 Scan015 | |
| Quality standards for American-made crankshafts and the need to inform suppliers of A.I.D. inspection criteria. | 22th Jul 1918 | Box 38 \ 6 Scan016 | |
| Cable confirmation advising against sending flawed crankshafts for testing as they are certain to be scrapped after a recent failure. | 26th Jul 1918 | Box 38 \ 6 Scan017 | |
| Letter regarding flawed crankshafts for American engines and whether they should be sent for inspection. | 14th Aug 1918 | Box 38 \ 6 Scan018 | |
| Letter regarding defective crankshafts and a method for detecting steel defects using nitric acid. | 26th Jul 1918 | Box 38 \ 6 Scan019 | |
| To Mr. Bailey regarding the inspection of every billet of steel for propeller shafts, connecting rods, and hubs. | 26th Jul 1918 | Box 38 \ 6 Scan020 | |
| The arrival of 12 American crankshafts and their subsequent examination for flaws. | 26th Aug 1918 | Box 38 \ 6 Scan021 | |
| The inspection and assessment of American crankshafts with flaws. | 4th Sep 1918 | Box 38 \ 6 Scan022 | |
| Water leaks in American cylinders and the importance of welding. | 24th Sep 1918 | Box 38 \ 6 Scan023 | |
| Suggestion to investigate sourcing cylinder jacket pressings from America due to their superior accuracy. | 3rd Oct 1918 | Box 38 \ 6 Scan024 | |
| Resolving cylinder water leaks, discussing production challenges like improving welding, using diluted female labour, and a shortage of inspectors due to military conscription. | 3rd Oct 1918 | Box 38 \ 6 Scan025 | |
| Parts requisition for an experimental test. | 18th Oct 1918 | Box 38 \ 6 Scan026 | |
| Test report on 'Eagle' engine cylinders that were manufactured in America. | 25th Oct 1918 | Box 38 \ 6 Scan027 | |
| Engine cylinder leaks and observations after an 18-hour test run. | 26th Apr 1917 | Box 38 \ 6 Scan028 | |
| Test report detailing the results of cylinder leakage tests. | 25th Apr 1917 | Box 38 \ 6 Scan029 | |
| Continued memo discussing cylinder leakage issues, particularly at the joints of vertical seams and valve band welds. | 25th Oct 1918 | Box 38 \ 6 Scan030 | |
| The failure of non-compliant planet wheel ball bearings during preliminary testing for American engines. | 25th Oct 1918 | Box 38 \ 6 Scan031 | |
| The rewelding of American engine cylinders and the policy on connecting rods. | 25th Oct 1918 | Box 38 \ 6 Scan032 | |
| Short memo regarding the remetalling of American rods to maintain an output programme. | 28th Oct 1918 | Box 38 \ 6 Scan033 | |
| The re-welding requirements for American cylinders. | 28th Oct 1918 | Box 38 \ 6 Scan034 | |
| Modifying the re-welding scheme for American cylinders to address newly discovered leaks. | 29th Oct 1918 | Box 38 \ 6 Scan035 | |
| The testing of American-made parts for an 'Eagle' engine, focusing on the condition of the connecting rods. | 30th Oct 1918 | Box 38 \ 6 Scan036 | |
| Inspection report on engine components including connecting rods, pistons, valves, and crankshaft. | 26th Apr 1917 | Box 38 \ 6 Scan037 | |
| Continuously running an engine and adding new American parts. | 30th Oct 1918 | Box 38 \ 6 Scan038 | |
| The superior rust-resistant Armco Iron material used for water jackets on American engines. | 5th Nov 1918 | Box 38 \ 6 Scan039 | |
| Request to send one American Crankshaft from London Road Works for experimental purposes. | 6th Nov 1918 | Box 38 \ 6 Scan040 | |
| The failure of an 'Eagle' engine fitted with American-made parts, specifically a broken crankshaft. | 6th Nov 1918 | Box 38 \ 6 Scan041 | |
| Issues and appearance of butt-welded cylinders. | 6th Nov 1918 | Box 38 \ 6 Scan042 | |
| The shipping and urgent testing of planet wheel ball bearings for American engines. | 8th Nov 1917 | Box 38 \ 6 Scan043 | |
| Investigation into a broken American crankshaft, analysing its material properties and comparing its failure mode to a similar case. | 19th Nov 1918 | Box 38 \ 6 Scan044 | |
| Confirming the dispatch of prints showing a broken American Cam-shaft. | 23th Nov 1918 | Box 38 \ 6 Scan045 | |
| Analysis of a fractured American crankshaft from an 'Eagle' engine. | 4th Dec 1918 | Box 38 \ 6 Scan046 | |
| Fracture on an American crankshaft and defending the suitability of the steel used. | 21th Dec 1918 | Box 38 \ 6 Scan047 | |
| Criticising a report on broken crankshafts for lacking crucial details about the condition of the shafts before testing. | 6th Feb 1919 | Box 38 \ 6 Scan048 | |
| American cylinder parts, specifically requesting the immediate dispatch of water jackets upon receipt. | 30th Dec 1918 | Box 38 \ 6 Scan049 | |
| Letter regarding the shipment of sample water jackets, detailing alterations, price, and materials. | 10th Dec 1918 | Box 38 \ 6 Scan050 | |
| Suitability of a material with .04% carbon for drawn pressing, page 2. | 1st Jan 1919 | Box 38 \ 6 Scan051 | |
| The results of endurance testing on American-made 'Eagle' engine parts, including connecting rods, pistons, and valves. | 1st Jan 1919 | Box 38 \ 6 Scan052 | |
| Reporting a broken crankshaft on an 'Eagle' engine during epicyclic gear destruction tests. | 13th Jan 1919 | Box 38 \ 6 Scan053 | |
| Responding to an enquiry about American pistons, their testing in an engine with a new Epicyclic Gear, and required modifications. | 27th Jan 1919 | Box 38 \ 6 Scan054 | |
| Investigation into broken American crankshafts. | 21th Feb 1919 | Box 38 \ 6 Scan055 | |
| The testing of an American crankshaft from Halcomb Steel Co. for potential use in commercial Eagle engines. | 11th Jun 1919 | Box 38 \ 6 Scan056 | |
| Query seeking clarification on the number of American-made crankshafts that broke during the experimental running of Eagle engines. | 17th Jun 1919 | Box 38 \ 6 Scan057 | |
| Progress and testing of English versus American-made crankshafts for 250 Eagle engines. | 11th Sep 1919 | Box 38 \ 6 Scan058 | |
| Tests on American crankshafts for 250 Eagle engines, concluding they are suitable for use. | 23th Sep 1919 | Box 38 \ 6 Scan059 | |
| Approving the use of specific parts for American Epicyclic Gears following tests. | 30th Sep 1919 | Box 38 \ 6 Scan060 | |
| Pitting and corrosion of engine cylinders and proposed experimental treatments. | 27th Sep 1918 | Box 38 \ 6 Scan061 | |
| The production difficulties of the Condor water pump rotor, suggesting a cast alternative. | 24th Sep 1918 | Box 38 \ 6 Scan062 | |
| Assigning experimental numbers for Condor epicyclic gear and roller bearing experiments. | 26th Aug 1919 | Box 38 \ 6 Scan063 | |
| Confirmation of a telegram regarding testing a Condor reduction gear with specific Hoffmann ball bearings. | 24th Sep 1918 | Box 38 \ 6 Scan064 | |
| Failure of 'Condor' reduction gear planet bearings and proposing a switch to ball bearings. | 25th Sep 1918 | Box 38 \ 6 Scan065 | |
| Modified roller bearing and ball bearings with spigotted cages for testing purposes. | 25th Sep 1918 | Box 38 \ 6 Scan066 | |
| Confirmation of a telegram regarding an urgent test on an epicyclic ball bearing. | 30th Sep 1918 | Box 38 \ 6 Scan067 | |
| Error in a drawing concerning a non-spigotted cage for the planet ball bearing on the 'Condor' Reduction Gear. | 2nd Oct 1918 | Box 38 \ 6 Scan068 | |
| Delay in obtaining ball bearings to replace roller bearings for 'Condor' and 'Eagle' epicyclic gears. | 1st Oct 1918 | Box 38 \ 6 Scan069 | |
| The replacement of roller bearings with ball bearings on the 'Condor' engine's epicyclic gear due to scoring. | 4th Oct 1918 | Box 38 \ 6 Scan070 | |
| Notification regarding the receipt of Standard Ball Bearings for 'Eagle' Epic Gears. | 15th Oct 1918 | Box 38 \ 6 Scan071 | |
| The performance of ball bearings replacing roller bearings on the epicyclic gear of 'Condor' and 'Eagle' engines. | 17th Oct 1918 | Box 38 \ 6 Scan072 | |
| Testing ball bearings in place of roller bearings on the epicyclic gear for Eagle and Condor engines. | 22th Oct 1918 | Box 38 \ 6 Scan073 | |
| The testing and failure analysis of Hess-Bright ball bearings for planet wheels. | 23th Oct 1918 | Box 38 \ 6 Scan074 | |
| Investigation into the failure of ball bearings substituted for roller bearings on an 'Eagle' epicyclic gear. | 24th Oct 1918 | Box 38 \ 6 Scan075 | |
| Bearing failures during an endurance run and the trial of replacement parts. | 26th Apr 1917 | Box 38 \ 6 Scan076 | |
| The failure of ball bearings compared to roller bearings in the epicyclic gear of an 'Eagle' engine. | 6th Nov 1918 | Box 38 \ 6 Scan077 | |
| Failures in the Condor engine's epicyclic gear, including broken bearings and bolts, and outlining plans for further testing. | 8th Nov 1918 | Box 38 \ 6 Scan078 | |
| Typed copy of a telegram from Mr. Royce with instructions for the Condor engine and reduction gear. | 11th Nov 1918 | Box 38 \ 6 Scan079 | |
| Message from Hives to Royce at West Wittering regarding failing ball bearings on a Condor engine. | 9th Nov 1918 | Box 38 \ 6 Scan080 | |
| Confirmation of a telegram discussing the Northcliffe chassis, engine choice, meetings, and component design. | 11th Nov 1918 | Box 38 \ 6 Scan081 | |
| The incorrect use of ball bearings instead of roller bearings in the 'Condor' reduction gear. | 28th May 1919 | Box 38 \ 6 Scan082 | |
| Failure of 'Condor' reduction gear planet bearings and suggesting a switch from roller to ball bearings. | 25th Sep 1918 | Box 38 \ 6 Scan083 | |
| Roller and ball bearing designs, referencing Hoffmann's proportions and proposing a modified version for a test. | 25th Sep 1918 | Box 38 \ 6 Scan084 | |
| Cancellation note for an experiment on a roller bearing with a small roller and no cage. | 18th Sep 1919 | Box 38 \ 6 Scan085 | |
| The recoating of cylinder jackets and external parts to prevent rust and corrosion. | 5th Oct 1918 | Box 38 \ 6 Scan086 | |
| Re-coating the interior of cylinder jackets to prevent rust and the results of testing the coating. | 24th Oct 1918 | Box 38 \ 6 Scan087 | |
| Successful anti-corrosion treatment for cylinder jackets and a request for more treated cylinders. | 25th Oct 1918 | Box 38 \ 6 Scan088 | |
| The coating of cylinder parts to prevent rust. | 23th Jan 1919 | Box 38 \ 6 Scan089 | |
| Merits of Cosletizing versus Sherardizing for rust-proofing aero-engine cylinders and cylinder jackets. | 9th Feb 1926 | Box 38 \ 6 Scan090 | |
| Removal of an experimental number for a Condor Reduction Gear with a .66 ratio. | 10th Aug 1918 | Box 38 \ 6 Scan091 | |
| Drawings for the 'Condor' Reduction Gear .66 Ratio. | 8th Oct 1918 | Box 38 \ 6 Scan092 | |
| Confirming one print of LeC.1004 & 1005 for the Condor Reduction Gear has been sent. | 10th Aug 1918 | Box 38 \ 6 Scan093 | |
| Modifications to the 'Condor' reduction gear. | 10th Oct 1918 | Box 38 \ 6 Scan094 | |
| Modifications to the 'Condor' reduction gear, specifically replacing bearings and referencing drawing LeC.1008. | 10th Oct 1918 | Box 38 \ 6 Scan095 | |
| Forwarding a print concerning the Condor Reduction Gear. | 14th Oct 1918 | Box 38 \ 6 Scan096 | |
| Listing the components required for the Condor Epicyclic Reduction Gear. | 16th Oct 1918 | Box 38 \ 6 Scan097 | |
| Accompanying drawings for the Condor epicyclic gear. | 19th Oct 1918 | Box 38 \ 6 Scan098 | |
| The substitution of gear cutters for the Condor .666 reduction gear. | 23th Oct 1918 | Box 38 \ 6 Scan099 | |
| List of parts for the Condor .666 Reduction Gear, including gear casing and thrust bearing housing. | 23th Oct 1918 | Box 38 \ 6 Scan100 | |
| Parts list for the Condor .666 Reduction Gear. | 25th Oct 1917 | Box 38 \ 6 Scan101 | |
| List of drawings for a Condor .666 reduction gear, requesting four sets. | 28th Oct 1918 | Box 38 \ 6 Scan102 | |
| Instruction to alter the quantity of .666 Reduction Gear sets from 3 to 4. | 23th Oct 1918 | Box 38 \ 6 Scan103 | |
| Parts request for a Condor epicyclic gear and propeller shaft extension bush. | 25th Oct 1918 | Box 38 \ 6 Scan104 | |
| Design changes for a simplified .55 ratio 'Condor' engine epicyclic gear, referencing drawing Lec.1015. | 25th Oct 1918 | Box 38 \ 6 Scan105 | |
| Technical memorandum discussing modifications to a .66 ratio gear, referencing the Liberty Epicyclic Gear and the 'Condor' anchorage. | 28th Apr 1917 | Box 38 \ 6 Scan106 | |
| Request to initiate work on the standardisation of a design for a .55 ratio reduction gear. | 28th Oct 1918 | Box 38 \ 6 Scan107 | |
| Request for drawings related to the Condor Reduction Gear, listing three specific parts. | 28th Oct 1918 | Box 38 \ 6 Scan108 | |
| | | | |