Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 305 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Modification and testing of a split rear bumper fairing.15th Feb 1956Box 26 \ 1  Scan223
Letter to a US representative regarding new four-door hardtop cars with no centre pillars.13th Feb 1956Box 26 \ 1  Scan224
Defining the correct settings for door and window winder handles.8th Feb 1956Box 26 \ 1  Scan225
Varying dimensions of number plates across different U.S. states.9th Mar 1956Box 26 \ 1  Scan226
Letter from a US distributor regarding American car design trends and enclosed catalogues.13th Jan 1956Box 26 \ 1  Scan227
New, more durable rubber ignition key tag, referencing sketch SG.4152.2nd Feb 1956Box 26 \ 1  Scan228
Design drawing for a rubber tag for an ignition key, showing dimensions and monogram options.30th Jan 1956Box 26 \ 1  Scan229
Wind noise issues with a Sunshine Roof on model B.90.BA.30th Jan 1956Box 26 \ 1  Scan230
Letter to Hooper & Co., Ltd. clarifying details on bonnet hinges, fastener assemblies, mouldings and bumpers for a chassis.27th Jan 1956Box 26 \ 1  Scan231
The inspection of a Siam Continental with a mock-up steering column and L Engine.25th Jan 1956Box 26 \ 1  Scan232
Requesting the build of a front end mock-up for wind tunnel testing.24th Jan 1956Box 26 \ 1  Scan233
Scheme for the revised rear end of a Siam Wraith 133' WB Park Ward Touring Limousine.24th Jan 1956Box 26 \ 1  Scan234
Changes to the boot lid, reverse lamps, and number plate panel for Standard Saloon models.24th Jan 1956Box 26 \ 1  Scan235
Letter to coachbuilder Hooper & Co. regarding chassis information and design updates for a 12' 1' wheelbase car.19th Jan 1956Box 26 \ 1  Scan236
Letter accompanying a set of drawings related to body design.16th Jan 1956Box 26 \ 1  Scan237
Test drive report and initial impressions of the Jensen 541.16th Jan 1956Box 26 \ 1  Scan238
Handbrake position and clearance issues on Mulliner Continental models.16th Jan 1956Box 26 \ 1  Scan239
Effect of a proposed new Bentley rear axle design on the vehicle's coachwork.4th Jan 1956Box 26 \ 1  Scan240
Modifications required for the freewheeling boot lid handle button on Bentley 'S' and Silver Cloud models.3rd Jan 1956Box 26 \ 1  Scan241
Letter from S. Smith & Sons regarding proposals and manufacturing difficulties for a new push button knob.3rd Jan 1956Box 26 \ 1  Scan242
Letter to Mr DeLooze regarding instruction book updates for a new axle and propeller shaft, lubrication issues, and the safety of a bolt valve.20th Dec 1911Box 26 \ 2  Scan001
Note from Mr Royce regarding instructions for the rear brakes instruction book.9th Mar 1912Box 26 \ 2  Scan002
Request to schedule a photoshoot of a new chassis with double rear brakes for a revised instruction book.15th Jul 1913Box 26 \ 2  Scan003
Requesting criticism on a revised Instruction Book.1st Aug 1913Box 26 \ 2  Scan004
Feedback on proposed amendments to an instruction book for the 2700 and 2800 series.25th Nov 1913Box 26 \ 2  Scan005
Updates to the instruction book regarding braking systems and engine terminology.25th Nov 1913Box 26 \ 2  Scan006
The disadvantages of the magneto plug's intermediate position for the instruction book.25th Nov 1913Box 26 \ 2  Scan007
And containing handwritten feedback for an instruction book.28th Nov 1913Box 26 \ 2  Scan008
From Mr Hives suggesting revisions to the engine starting procedure in an instruction book.25th Nov 1913Box 26 \ 2  Scan009
Internal memo discussing corrections and suggestions for an instruction book.25th Nov 1913Box 26 \ 2  Scan010
Instructions for amendments to a publication.18th Sep 1913Box 26 \ 2  Scan011
Suggesting amendments to a publication regarding driving instructions and risks.18th Sep 1913Box 26 \ 2  Scan012
Report by Mr. Haldenby detailing suggested amendments for Instruction Book X 995.3rd Dec 1913Box 26 \ 2  Scan013
List of suggested amendments for an instruction book.3rd Dec 1913Box 26 \ 2  Scan014
Prevention of sulphation in battery cells and how to update the instruction book.1st Dec 1913Box 26 \ 2  Scan015
Outlining suggestions for the instruction book regarding gear oil, rear brake adjustment, and fan/dynamo belt treatment.10th Dec 1913Box 26 \ 2  Scan016
Internal memorandum suggesting a change to the instruction book regarding the clearance for tappet readjustment.10th Dec 1913Box 26 \ 2  Scan017
Reviewing and commenting on suggestions for an instruction book, covering lubricants, brake adjustment, fan belts, and tappet clearance.10th Dec 1913Box 26 \ 2  Scan018
Circulating a document related to the Instruction Book for review and comment.17th Dec 1913Box 26 \ 2  Scan019
Response memo detailing Mr. Haldenby's report on points for an instruction book, including lubrication, brake adjustment, and belt maintenance.17th Dec 1913Box 26 \ 2  Scan020
Requesting a reply regarding the Instruction Book.17th Dec 1913Box 26 \ 2  Scan021
Instructions for accumulators regarding discharging and charging rules to be added to an instruction book.18th Dec 1913Box 26 \ 2  Scan022
Set of working rules for the maintenance and care of a battery.18th Dec 1913Box 26 \ 2  Scan023
Criticism on an instruction book, with a handwritten reply.23th Dec 1913Box 26 \ 2  Scan024
To Mr. Southern confirming that the instructions in a book are considered complete.30th Dec 1913Box 26 \ 2  Scan025
Proposing a new paragraph for an instruction book regarding engine detonation, also known as 'knock' or 'pinking'.9th Jan 1914Box 26 \ 2  Scan026
To Mr Hives regarding Instruction Book X.995, with a handwritten reply concerning engine 'chirping or pinking'.15th Jan 1914Box 26 \ 2  Scan027
Engine chirping or pinking in relation to an instruction book.17th Jan 1914Box 26 \ 2  Scan028
Request for a copy of the latest instruction book.21th May 1914Box 26 \ 2  Scan029
Whether to recommend specific makes of articles, such as the C.A.V. Dynamo, in the instruction book.6th May 1914Box 26 \ 2  Scan030
Recommended lubrication interval for the universal joint for an instruction book.5th May 1915Box 26 \ 2  Scan031
Proposed insert for a car instruction book regarding the maintenance of ignition plugs.29th Oct 1915Box 26 \ 2  Scan032
Update to the 40/50 chassis instruction book for the ignition system.15th Aug 1919Box 26 \ 2  Scan033
Suggesting an update to the 40/50 Chassis instruction book to include modern ignition instructions.28th Aug 1919Box 26 \ 2  Scan034
Request for particulars on the Electrical Outfit of the Series 'J' Chassis to adapt the Instruction Book.28th Aug 1919Box 26 \ 2  Scan035
Description of the electrical system for the 40/50 HP Chassis, Series J.K., referencing wiring diagram N.1293.6th Oct 1919Box 26 \ 2  Scan036
List and description of electrical components and their functions, including starting, ignition, and dynamo systems.6th Oct 1919Box 26 \ 2  Scan037
Description of the dynamo regulation using the 'Rotax Leitner System' and the connected Lucas switchbox.6th Oct 1919Box 26 \ 2  Scan038
Technical description of the switchbox, its connections, and the electrical system's potential.6th Oct 1919Box 26 \ 2  Scan039
Description of the dynamo charging switch operations and the function of the fuse protection system.6th Oct 1919Box 26 \ 2  Scan040
Page describing the dynamo charging system and lighting switch connections.6th Oct 1919Box 26 \ 2  Scan041
Continued description of the Lucas switchbox, battery, and ammeter.6th Oct 1919Box 26 \ 2  Scan042
Description of the lamp connections, starter motor, and its main switch.6th Oct 1919Box 26 \ 2  Scan043
Description of the Actuator Box and Push Button Switch mechanisms.16th Oct 1919Box 26 \ 2  Scan044
Description of the Junction Box and the Steering Column Switch.1st Oct 1919Box 26 \ 2  Scan045
Description of the ignition switch operations and details on the ignition coil, ballast resistance, and distributor unit.1st Oct 1919Box 26 \ 2  Scan046
Page detailing the electrical connections for the magneto, distributor, Klaxon, lamps, and battery.6th Oct 1919Box 26 \ 2  Scan047
Explanation of the ammeter's function and wiring in relation to the junction box and switchbox.16th Oct 1919Box 26 \ 2  Scan048
Description of the connections for the motor, main switch, actuator box, and push-button switch circuits.16th Oct 1919Box 26 \ 2  Scan049
Description of the low tension battery ignition circuit connections.6th Oct 1919Box 26 \ 2  Scan050
The function of the fuses on the Lucas junction box and the consequences of earth faults.6th Oct 1919Box 26 \ 2  Scan051
Instructions on the starter motor relay circuit and the need to remove fuses for examination.1st Dec 1919Box 26 \ 2  Scan052
Cover memo for suggested points on the electrical system for the 40/50 HP Series J.K. instruction book.1st Dec 1919Box 26 \ 2  Scan053
Instructions for tracing an electrical earth fault on a 40/50 HP Series J.K. chassis.28th Oct 1919Box 26 \ 2  Scan054
Troubleshooting guide for diagnosing earth faults in the vehicle's ignition and electrical system.26th Apr 1917Box 26 \ 2  Scan055
Instructions on troubleshooting electrical earth faults and dynamo maintenance.26th Apr 1917Box 26 \ 2  Scan056
Instructions for dynamo belt adjustment and Lucas switchbox maintenance, including fuses and cut-out.28th Apr 1917Box 26 \ 2  Scan057
Instructions for the care and initial charging of a Chloride 6 BXE 5 battery.28th Apr 1917Box 26 \ 2  Scan058
Instructions for the initial charging, discharging and preparation of a vehicle battery.26th Apr 1917Box 26 \ 2  Scan059
Running instructions for the battery and dynamo charging system once installed on the chassis.26th Apr 1917Box 26 \ 2  Scan060
Instructions for lead-acid battery maintenance, charging, and cleaning.25th Apr 1917Box 26 \ 2  Scan061
Instructions on battery maintenance, cleaning, and testing procedures.1st Apr 1917Box 26 \ 2  Scan062
Instructions on battery maintenance, density readings, and in-garage charging procedures.26th Apr 1917Box 26 \ 2  Scan063
Instructions on battery charging methods and correct usage of the starter motor.28th Apr 1917Box 26 \ 2  Scan064
Instructions for short and long-term battery storage and despatch.26th Jan 1917Box 26 \ 2  Scan065
Instructions for battery storage, and warnings about over-discharging and sulphation.1st Feb 1913Box 26 \ 2  Scan066
Instructions on how to store a battery for a long period by removing the sulphuric acid.26th Apr 1917Box 26 \ 2  Scan067
Page detailing instructions for the Weston Ammeter and maintenance procedures for the Starter Motor, including lubrication, brushes, and chain adjustment.26th Apr 1917Box 26 \ 2  Scan068
Instructions regarding the electrical system, specifically the lamps and the main switch.26th Apr 1917Box 26 \ 2  Scan069
Instructions for the Lucas Junction Box fuses and the Contact Breaker & Distributor.26th Apr 1917Box 26 \ 2  Scan070
Instructions for setting the points and maximum gap opening on a high tension distributor.3rd Nov 1919Box 26 \ 2  Scan071
Recommending the inclusion of a syringe-type hydrometer in the chassis kit and instruction book.3rd Nov 1919Box 26 \ 2  Scan072
Distributing updated notes on 'Care of Battery' for the 40/50 HP chassis.4th Nov 1919Box 26 \ 2  Scan073
Revisions and additions for the Chassis Instruction Book.23th Nov 1919Box 26 \ 2  Scan074
Updates to the Chassis Instruction Book, including the electrical scheme and wiring diagrams.23th Dec 1919Box 26 \ 2  Scan075
Correct acid density and charging procedure for a Chloride 6 BXE 5 battery.23th Dec 1919Box 26 \ 2  Scan076
Battery charging instructions, acid density, and capacity enhancement.23th Dec 1919Box 26 \ 2  Scan077
Issue with wiring connections causing the motor to start when the battery is disconnected while the lights are on.30th Dec 1919Box 26 \ 2  Scan078
Wiring connections, potential safety issues with the actuator box, and battery charging recommendations.1st Jan 1920Box 26 \ 2  Scan079
Actuator box power differences and a safety warning about battery explosion risks from sparks.1st Jan 1920Box 26 \ 2  Scan080


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙