Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1717 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Arranging a meeting to discuss ordering material for the 'U' Series to maintain output.24th Nov 1931Box 142 \ 2  scan0136
Conference memo detailing material ordering for the 'U' Series chassis in response to increased output of the 20/25 HP model.25th Nov 1931Box 142 \ 2  scan0137
Material ordering and specifications for the 20/25 HP 'U' Series chassis.27th Nov 1931Box 142 \ 2  scan0138
Delays and modifications for the 20/25 HP Chassis 'U' Series.22th Jan 1932Box 142 \ 2  scan0139
Timing for ordering material for spanners and tools.22th Jan 1932Box 142 \ 2  scan0140
Conference notes regarding the reconsideration of units for the 'U' Series, including the petrol tank and a longer bonnet.26th Jan 1932Box 142 \ 2  scan0141
Chassis modifications, an order for 100 instrument sets, and a note on delaying non-basic units.26th Jan 1932Box 142 \ 2  scan0142
Material and production instructions for the 'U' Series 20/25 HP chassis.26th Jan 1932Box 142 \ 2  scan0143
Instructions for fitting stronger springs and side spare wheel carriers.27th Jan 1932Box 142 \ 2  scan0144
Introduction of a new petrol tank for the 20/25 HP 'U' Series chassis.27th Jan 1932Box 142 \ 2  scan0145
Comparing the cost of springs from suppliers Firths and Woodheads, with a suggestion to trial Woodheads springs on certain car models.8th Feb 1932Box 142 \ 2  scan0146
Expressing alarm over delays in releasing details for the 20/25 HP Chassis 'W' Series.11th Feb 1932Box 142 \ 2  scan0147
Preparing orders for 100 sets of material for the 20/25 HP 'V' series chassis.10th Mar 1932Box 142 \ 2  scan0148
Material orders and proposed cost-saving modifications for the 25 HP model.22th Mar 1932Box 142 \ 2  scan0149
Requesting urgent instructions for the 25 HP model exhaust system due to increased production.19th Apr 1932Box 142 \ 2  scan0150
Production policy for 25 HP silencers and trials of a new exhaust scheme.20th Apr 1932Box 142 \ 2  scan0151
Authorisation to order a further 50 sets of castings and forgings for the 20/25 HP Chassis 'V' Series, with a hold on production machining.20th Apr 1932Box 142 \ 2  scan0152
Status of standardisation sheets for 'O' Series material.27th Jun 1932Box 142 \ 2  scan0153
List of modifications for a further 50 sets of '0.2' Series Phantom II chassis.8th Jun 1932Box 142 \ 2  scan0154
Hold-up of ordering exhaust material for the 20/25 HP 'W' Series Chassis.21th Jul 1932Box 142 \ 2  scan0155
Recommending to proceed with an order for a further 50 sets of 20/25 HP chassis material.22th Jul 1932Box 142 \ 2  scan0156
Production status of 20/25 HP 'W' Series chassis material, noting holds on certain parts.8th Aug 1932Box 142 \ 2  scan0157
The production programme for a second batch of 100 20/25 HP 'R-B' Series chassis.22th Aug 1932Box 142 \ 2  scan0158
Production schedule for the 20/25 HP Chassis 'W-B' Series, second 100, numbers 4101-4200.19th Aug 1932Box 142 \ 2  scan0159
Supply, testing, and cost-saving of cold-pressed versus hot-pressed nickel frames for the 25 HP chassis.29th Aug 1932Box 142 \ 2  scan0160
The continued ordering of hot pressed nickel frames until cold pressed frames are approved by the Experimental Department.30th Aug 1932Box 142 \ 2  scan0161
Requesting an indication of when the Standardisation Sheet for Cold Pressed Frames will be issued.31th Aug 1932Box 142 \ 2  scan0162
Standardisation tests for the 20/25 HP chassis cold pressed frames.1st Sep 1932Box 142 \ 2  scan0163
Increase in 20/25 HP chassis output and requesting sanction for further materials.12th Sep 1932Box 142 \ 2  scan0164
Production schedule and material plan for the 40/50 HP Chassis - 02 Series.14th Sep 1932Box 142 \ 2  scan0165
Programme for 50 40/50 HP, 02 Series chassis, numbers 6689-6738.19th Sep 1932Box 142 \ 2  scan0166
The testing and potential standardisation of 20/25 HP Cold Pressed Chassis Frames.19th Sep 1932Box 142 \ 2  scan0167
Ordering materials for exhaust fittings for the 20/25-HP Chassis 'W' Series.23th Sep 1932Box 142 \ 2  scan0168
Enclosing a programme for the 20/25 HP 'X' Series chassis.30th Sep 1932Box 142 \ 2  scan0169
Production schedule and material requirements for the 20/25 HP Chassis 'X' Series.26th Sep 1932Box 142 \ 2  scan0170
Decision to replace the 25 HP model with the J.11 and not order further 25 HP materials.7th Nov 1932Box 142 \ 2  scan0171
Delaying modifications to the 'O' Series 40/50 Chassis pending a test drive of car 19-EX.7th Nov 1932Box 142 \ 2  scan0172
Order for 100 'O' Series 40/50 Chassis.8th Nov 1932Box 142 \ 2  scan0173
Modifications for the 'O' Series 40/50 HP chassis, deciding against the resonant exhaust for the standard model.16th Nov 1932Box 142 \ 2  scan0174
Modifications and cost savings for the 20/25 HP Chassis 'X' Series, numbers 101 to 200.16th Nov 1932Box 142 \ 2  scan0175
Concluding page of a memorandum to various departments.16th Nov 1932Box 142 \ 2  scan0176
Material programme for 100 Chassis, Series 'O2' (Second Part).21th Nov 1932Box 142 \ 2  scan0177
Production schedule and material requirements for the 40/50 HP. Chassis Series 'O2'.18th Nov 1932Box 142 \ 2  scan0178
Authorising the order of parts and assembly of 20 chassis for the 'Peregrine' project.30th Nov 1932Box 142 \ 2  scan0179
Material programme for 100 20/25 HP chassis, series Y-A.18th Nov 1932Box 142 \ 2  scan0180
Production schedule for 100 chassis of the 20/25 HP, Series Y-A, numbers 4401-4500.5th Dec 1932Box 142 \ 2  scan0181
Listing parts and material specifications considered safe to proceed with for the Peregrine project.5th Dec 1932Box 142 \ 2  scan0182
Continued list of vehicle components and notes, specifically regarding the gearbox.5th Dec 1932Box 142 \ 2  scan0183
Holding up certain Peregrine parts due to failures and releasing others for production.14th Dec 1932Box 142 \ 2  scan0184
Continued list of numbered vehicle components including brake, steering, and chassis parts.14th Dec 1932Box 142 \ 2  scan0185
Ordering of further material for the 20/25 HP chassis.29th Dec 1932Box 142 \ 2  scan0186
Outlining proposed improvements for the 20/25 chassis.2nd Jan 1933Box 142 \ 2  scan0187
Continued discussion on proposed improvements regarding gearboxes, dampers, lubrication, and axle control for the 20/25 model.2nd Jan 1933Box 142 \ 2  scan0188
The expedited release of outstanding carburetter items for the 40/50 HP 'O' Series chassis.3rd Jan 1933Box 142 \ 2  scan0189
Proposal to change the radiator shutter for the 25 HP model to a less expensive Peregrine type made from drawn tube.3rd Jan 1933Box 142 \ 2  scan0190
Agreeing to use a drawn tube type radiator shutter on the 20/25 and Phantom II models.4th Jan 1933Box 142 \ 2  scan0191
Material requirements for 200 sets of the 'Z' series 20/25 HP chassis, noting exceptions compared to the 'Y' series.10th Jan 1933Box 142 \ 2  scan0192
List of parts, production instructions, and material specifications.10th Jan 1933Box 142 \ 2  scan0193
Note on the material specification for the first 100 chassis of the 20/25 HP 'Z' series.13th Jan 1933Box 142 \ 2  scan0194
Releasing the programme for 200 'Z' Series 20/25 HP chassis, numbers 4501-4700.18th Jan 1933Box 142 \ 2  scan0195
Production schedule and material plan for the 20/25 HP Chassis 'Z' Series.9th Jan 1933Box 142 \ 2  scan0196
The ordering of material for 100 sets of 40/50 chassis.18th Jan 1933Box 142 \ 2  scan0197
Instruction to hold machining of parts for the Phantom II gearbox to allow for fitting a new silent second gear.19th Jan 1933Box 142 \ 2  scan0198
Materials for the 40/50 HP chassis and the release of a silent second gear.20th Jan 1933Box 142 \ 2  scan0199
Proposed modifications for a batch of 100 sets of P.2 Series material for the 40/50 HP chassis.26th Jan 1933Box 142 \ 2  scan0200
Delays in ordering materials for the 'Z' and 'P.2.' series chassis, causing increased costs and worry.31th Jan 1933Box 142 \ 2  scan0201
Authorising the release of materials for 200 sets and the construction of three more experimental 'Bensport' chassis.2nd Feb 1933Box 142 \ 2  scan0202
Specification sheet for the Bensport chassis, detailing parts and modifications.4th Feb 1933Box 142 \ 2  scan0203
Continuation sheet for the Bensport specification, detailing various engine and chassis components.4th Feb 1933Box 142 \ 2  scan0204
Continued specification details for a bonnet, starting handle, and ignition distributor.4th Feb 1933Box 142 \ 2  scan0205
Specification sheet for the Bensport model detailing various chassis components.4th Feb 1933Box 142 \ 2  scan0206
Specification document for Bensport, listing various vehicle components and their status or type.6th Feb 1933Box 142 \ 2  scan0207
Requesting a decision on whether to use improved materials or old parts for the 20/25 HP chassis.6th Feb 1933Box 142 \ 2  scan0208
Modifications and new drawings for 20/25 and 40/50 HP chassis material.7th Feb 1933Box 142 \ 2  scan0209
Modifying the dynamo drive, which halts production of crankcases for the 20 Peregrine chassis.10th Feb 1933Box 142 \ 2  scan0210
Enclosing a programme for 100 40/50 HP 'P-2' Series chassis, numbers 6839-6938.10th Feb 1933Box 142 \ 2  scan0211
Production schedule for 40/50 HP Chassis - P2 Series, covering chassis numbers 6839 to 6938.8th Feb 1933Box 142 \ 2  scan0212
Attaching a summary of new and cancelled car design parts issued to the Tool Drawing Office over an eight-year period.15th Feb 1933Box 142 \ 2  scan0213
Summary of new and cancelled parts on car design issued to the Tool Drawing Office covering a period of eight years.27th Jan 1933Box 142 \ 2  scan0214
Internal instruction to release an order for 200 sets of 20/25 HP chassis material.10th May 1933Box 142 \ 2  scan0215
Clarifying material orders and machining instructions for the Peregrine and Bensport projects.30th Mar 1933Box 142 \ 2  scan0216
Machining schedules for the 3.5-litre Bentley Car, authorising work on 100 sets of material.26th Apr 1933Box 142 \ 2  scan0217
The procurement and testing of road wheels and hubs for the 3½ Litre Bentley.3rd May 1933Box 142 \ 2  scan0218
Progress chart and conference summary regarding the production plan for the 3 1/2 Litre Bentley chassis.2nd May 1933Box 142 \ 2  scan0219
List of parts and materials held up for the balance of 85 sets.2nd May 1933Box 142 \ 2  scan0220
Urging the provision of outstanding instructions for Bentley Material due to time constraints.13th Jun 1933Box 142 \ 2  scan0221
The 4% material for road wheels and hubs and the issuance of drawings.15th Jun 1933Box 142 \ 2  scan0222
The release and order of 200 further sets of material for the 20/25 HP chassis.16th Jun 1933Box 142 \ 2  scan0223
Potential economies and improvements for the 25 HP model by adopting Bentley-style components.19th Jun 1933Box 142 \ 2  scan0224
Proposed modifications and improvements for the 20/25 HP Chassis, B.2 Series material.19th Jun 1933Box 142 \ 2  scan0225
Agreeing to the introduction of new items for the 20/25 Material series, conditional upon the signing of Standardisation Sheets.20th Jun 1933Box 142 \ 2  scan0226
Authorizing the order of 100 material sets for the 40/50 HP Chassis and requesting allocation details.24th Jun 1933Box 142 \ 2  scan0227
Cover memo for a programme covering 200 chassis, numbers 4901 to 5100, of the 20/25 HP 'B2' series.26th Jun 1933Box 142 \ 2  scan0228
Production schedule for the 20/25 HP Chassis 'B2' Series, detailing output, testing, and material ordering timelines.26th Jun 1933Box 142 \ 2  scan0229
Potential new features for an upcoming order of 100 40/50 HP chassis.28th Jun 1933Box 142 \ 2  scan0230
Page 2 of a typed memorandum regarding a settlement and a postscript about a modified petrol tank filler cap.28th Jun 1933Box 142 \ 2  scan0231
Responding to eight points regarding vehicle component experiences and proposed standardizations.30th Jun 1933Box 142 \ 2  scan0232
Release schedule and production quantities for the Bentley Chassis, noting potential supply issues due to upcoming holidays.3rd Jul 1933Box 142 \ 2  scan0233
Parts status report for the 'Bensport' 'A' Series, detailing held-up components for production.30th Jun 1933Box 142 \ 2  scan0234
Release of parts for the 20/25 HP Chassis 'B.2' series.3rd Jul 1933Box 142 \ 2  scan0235


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙